Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
96 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 6of 6 | REPLACE LONGITUDINAL JOINT STAPLES | HARRIS | 2018-03-07 | $1,419,943.06 | $996,577.25 |
| Rank 7of 7 | FULL DEPTH CONCRETE REPAIR | DENTON | 2018-03-07 | $1,149,314.04 | $857,456.50 |
| Rank 4of 4 | FULL DEPTH CONCRETE REPAIR | NAVARRO | 2018-03-06 | $1,097,982.00 | $715,958.25 |
| Low bidof 3 | ONCALL CONCRETE PAVEMENT REPAIR | WICHITA | 2018-02-02 | $777,111.00 | $777,111.00 |
| Rank 3of 11 | MISCELLANEOUS BRIDGE REPAIR | SCURRY | 2018-02-01 | $498,554.00 | $343,510.00 |
| Rank 6of 6 | CALLOUT CONCRETE PAVEMENT REPAIR | HARRISON | 2018-01-04 | $5,694,200.00 | $4,189,000.00 |
| Low bidof 3 | MISCELLANEOUS CONSTRUCTION | GRAYSON | 2017-12-06 | $1,374,640.00 | $1,374,640.00 |
| Rank 2of 4 | CLEANING & SEALING OF BRIDGE JOINTS | GONZALES | 2017-12-05 | $777,273.00 | $721,216.00 |
| Rank 2of 4 | CLEAN AND SEAL JOINTS & CRACKS | ORANGE | 2017-11-02 | $448,852.70 | $401,238.50 |
| Rank 6of 11 | CONSTRUCT SIDEWALKS | CAMP | 2017-10-04 | $414,333.00 | $309,168.00 |
| Low bidof 2 | ON CALL FULL DEPTH CONCRETE REPAIR | HOPKINS | 2017-10-04 | $1,573,245.00 | $1,573,245.00 |
| Rank 4of 5 | FULL DEPTH CONCRETE REPAIR | DALLAS | 2017-10-03 | $1,143,250.00 | $693,600.00 |
| Low bidof 6 | FULL DEPTH CONCRETE REPAIR | GRAYSON | 2017-07-12 | $598,650.00 | $598,650.00 |
| Rank 4of 7 | PVT REPAIR, SLOT STITCH | KAUFMAN | 2017-06-07 | $1,397,805.23 | $1,088,533.00 |
| Rank 5of 7 | PAVEMENT REPAIR & PAVEMENT MARKINGS | ROCKWALL | 2017-05-02 | $2,797,046.79 | $2,315,893.57 |
| Low bidof 6 | ARMOR JOINT REPAIR | LUBBOCK | 2017-03-08 | $590,724.00 | $590,724.00 |
| Rank 5of 6 | FULL DEPTH CONCRETE REPAIR | COLLIN | 2017-03-07 | $989,409.40 | $657,809.00 |
| Rank 3of 5 | FULL DEPTH CONCRETE REPAIR | POTTER | 2017-02-03 | $973,085.00 | $950,535.00 |
| Rank 7of 14 | REMOVING TREES FROM THE CLEAR ZONE | PARMER | 2017-02-02 | $169,250.00 | $96,999.00 |
| Rank 4of 4 | FULL DEPTH CONCRETE REPAIR | MONTAGUE | 2017-02-02 | $798,742.20 | $758,517.00 |
| Rank 7of 7 | FULL DEPTH CONCRETE PAVEMENT REPAIR | HARDIN | 2017-01-05 | $624,805.00 | $344,550.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.