Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
608 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 6 | FM 2499 (Justin Road) At FM 407 | DENTON | 2025-03-04 | $3,143,471.81 | $3,143,471.81 |
| Rank 3of 9 | SH 30 Drainage - FY 25 | GRIMES | 2025-03-04 | $1,172,553.20 | $954,997.80 |
| Rank 4of 19 | FM 2571 - AT Gazley Crk - 25 BMIP | BASTROP | 2025-03-04 | $226,250.00 | $180,204.00 |
| Rank 5of 15 | SFT | FM 218 | @ FM 1702 | HAMILTON | 2025-03-04 | $163,303.00 | $133,517.11 |
| Low bidof 4 | Full Depth Concrete Repair 09 1024 | ELLIS | 2025-03-04 | $1,343,904.30 | $1,343,904.30 |
| Rank 9of 11 | US 82 Sidewalk | RED RIVER | 2025-02-07 | $1,830,201.36 | $1,486,446.00 |
| Rank 7of 13 | US 290 - At Cottonwd & B Dry Ck, 25BMIP | TRAVIS | 2025-02-06 | $382,920.00 | $304,980.00 |
| Rank 2of 10 | SH 29 - AT San Gabriel Rv, 25BMIP | WILLIAMSON | 2025-02-06 | $442,714.00 | $279,317.00 |
| Rank 5of 6 | FM 2499 FM 1171 to Tarrant CL | DENTON | 2025-02-06 | $2,481,037.12 | $1,920,304.66 |
| Rank 4of 8 | FM 1535 AT DRAW / SH 16 AT COMANCHE CRK | BEXAR | 2025-01-16 | $297,060.00 | $218,588.00 |
| Rank 3of 10 | Bridge Preventative Maintenance 09 1024 | ELLIS | 2025-01-15 | $783,302.00 | $733,230.00 |
| Rank 3of 7 | BPM FM709 01 0125 | NAVARRO | 2025-01-15 | $272,820.00 | $223,095.00 |
| Rank 3of 5 | Mowing Highway Right of Way 07 0125 | COLLIN | 2025-01-15 | $432,955.51 | $415,315.00 |
| Low bidof 7 | Mowing Highway Right of Way (E) 07 0125 | COLLIN | 2025-01-15 | $630,208.01 | $630,208.01 |
| Rank 3of 6 | FDCR Denton County | DENTON | 2025-01-08 | $1,223,830.00 | $924,426.77 |
| Rank 2of 7 | Mowing 01 01/08/24 | NAVARRO | 2025-01-08 | $813,452.01 | $631,956.08 |
| Rank 4of 4 | RMC 6475-39-001 Mowing and Litter Remova | MONTGOMERY | 2025-01-08 | $1,431,925.52 | $1,094,425.18 |
| Low bidof 2 | FY 25 COMAL ROUTINE MAINTENANCE | COMAL | 2025-01-08 | $6,284,856.50 | $6,284,856.50 |
| Low bidof 6 | FY 2025 Concrete Pavement US 75 | GRAYSON | 2025-01-07 | $1,472,289.00 | $1,472,289.00 |
| Rank 3of 6 | US 190 at FM 845 Culvert - FY 24 | MILAM | 2025-01-07 | $1,842,916.00 | $1,409,595.10 |
| Rank 6of 12 | IH 30 WB Bill Bradford Bridge Repair | HOPKINS | 2025-01-07 | $823,000.00 | $339,000.00 |
| Rank 2of 2 | FY 25 East Bexar Routine Maintenance | BEXAR | 2025-01-07 | $22,248,188.40 | $21,118,743.16 |
| Rank 10of 12 | HAZARD ELIMINATION & SAFETY | KAUFMAN | 2024-12-04 | $4,969,336.00 | $3,495,000.00 |
| Rank 4of 11 | BRIDGE MAINTENANCE | TARRANT | 2024-12-04 | $1,078,622.00 | $896,115.50 |
| Rank 6of 7 | HAZARD ELIMINATION & SAFETY | WISE | 2024-12-04 | $232,100.00 | $149,400.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.