Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
608 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 8 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | BOWIE | 2024-12-03 | $1,943,602.00 | $1,943,602.00 |
| Low bidof 5 | BRIDGE REPAIR | HOPKINS | 2024-11-21 | $427,200.00 | $427,200.00 |
| Rank 2of 6 | BRIDGE PREVENTATIVE MAINTENANCE | RED RIVER | 2024-11-21 | $377,264.00 | $327,282.00 |
| Rank 2of 8 | CONCRETE STRUCTURE REPAIR | KLEBERG | 2024-11-19 | $356,300.00 | $296,578.00 |
| Rank 2of 5 | EROSION REPAIR | BEXAR | 2024-11-14 | $217,995.00 | $174,951.00 |
| Rank 3of 5 | METAL BEAM GUARD FENCE REPAIR | SAN JACINTO | 2024-11-13 | $187,610.00 | $107,700.00 |
| Rank 4of 6 | DEBRIS REMOVAL | ANGELINA | 2024-11-13 | $988,770.00 | $740,808.00 |
| Rank 2of 6 | CULVERT REPAIR | LAVACA | 2024-11-13 | $638,637.00 | $596,669.25 |
| Rank 4of 4 | MOWING HIGHWAY RIGHT OF WAY | DENTON | 2024-11-13 | $514,126.00 | $482,476.00 |
| Rank 4of 8 | REMOVAL AND DISPOSAL OF DRIFTWOOD | ELLIS | 2024-11-13 | $283,712.00 | $225,042.00 |
| Rank 5of 7 | MOWING HIGHWAY RIGHT OF WAY | DENTON | 2024-11-13 | $210,721.00 | $190,368.00 |
| Rank 2of 2 | STORM SEWER CLEANING & DRIFTWOOD REMOVAL | COLLIN | 2024-11-13 | $93,410.00 | $87,000.00 |
| Rank 3of 11 | BRIDGE JOINT CLEANING AND SEALING | ORANGE | 2024-11-13 | $223,600.00 | $212,039.00 |
| Low bidof 6 | CULVERT REPLACEMENT | WALKER | 2024-11-12 | $283,536.00 | $283,536.00 |
| Rank 2of 5 | CURB & GUTTER MAINT | BRAZOS | 2024-11-12 | $118,755.00 | $114,951.50 |
| Low bidof 10 | REHABILITATE BRIDGE | HARRIS | 2024-11-07 | $3,348,460.00 | $3,348,460.00 |
| Rank 4of 8 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | BOWIE | 2024-11-07 | $1,983,451.50 | $1,777,958.06 |
| Low bidof 7 | BRIDGE MAINTENANCE | JOHNSON | 2024-11-06 | $2,082,914.00 | $2,082,914.00 |
| Rank 2of 9 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | LAMAR | 2024-11-06 | $2,233,650.90 | $2,222,428.62 |
| Low bidof 8 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | GRIMES | 2024-11-06 | $782,803.00 | $782,803.00 |
| Rank 3of 7 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | SMITH | 2024-11-06 | $973,807.00 | $865,454.00 |
| Rank 4of 4 | DITCH CLEANING AND RESHAPING | HOUSTON | 2024-10-31 | $673,584.00 | $380,104.92 |
| Low bidof 6 | BRIDGE PREVENTATIVE MAINTENANCE | NACOGDOCHES | 2024-10-31 | $323,160.00 | $323,160.00 |
| Rank 4of 6 | BRIDGE JOINT CLEANING AND SEALING | DENTON | 2024-10-31 | $322,740.00 | $293,532.00 |
| Rank 2of 4 | SMALL SIGN REPLACEMENT | COLLIN | 2024-10-31 | $128,054.00 | $102,300.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.