Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
772 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 4 | THIN OVERLAY MIX | LYNN | 2019-04-02 | $15,182,798.89 | $13,819,500.73 |
| Rank 6of 6 | BASE RPR, MILL, OVERLAY, PAVMT MARK | PARKER | 2019-03-06 | $6,821,267.90 | $5,871,767.96 |
| Rank 6of 6 | REHABILITATION OF EXISTING PAVEMENT AND ADD SHLDRS | KAUFMAN | 2019-03-06 | $2,084,892.42 | $1,469,989.63 |
| Rank 5of 5 | GR, BS, STRS, SURF & PAV MRKS | HARRISON | 2019-03-05 | $6,143,150.10 | $4,798,326.75 |
| Low bidof 3 | SUBGRADE WIDENING, FLXBASE, 2 COURSE | DAWSON | 2019-03-05 | $4,232,784.05 | $4,232,784.05 |
| Rank 6of 12 | REPLACE BRIDGE AND APPROACHES | ANDERSON | 2019-03-05 | $722,743.00 | $607,852.40 |
| Rank 4of 4 | FULL DEPTH REHAB | CULBERSON | 2019-02-06 | $34,448,235.38 | $22,480,668.54 |
| Rank 4of 7 | REHABILITATE EXISTING PAVEMENT AND ADD SHOULDERS | KAUFMAN | 2019-02-06 | $4,220,014.50 | $3,946,271.45 |
| Rank 4of 4 | GRADE, BASE, ACP | LUBBOCK | 2019-02-05 | $25,622,854.81 | $18,836,295.18 |
| Rank 6of 7 | RECONSTRUCT AND WIDEN PAVEMENT | NACOGDOCHES | 2019-02-05 | $4,813,301.34 | $3,823,595.55 |
| Rank 3of 6 | GRDG, WDN, STRCS, BASE, SURF, SGNS, MRKGS | ROBERTSON | 2019-02-05 | $2,331,643.09 | $1,723,096.58 |
| Rank 3of 6 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | CLAY | 2019-02-05 | $2,740,963.67 | $2,328,204.18 |
| Rank 6of 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | ROCKWALL | 2019-01-09 | $3,666,835.50 | $2,753,944.73 |
| Rank 5of 10 | CLEAN DITCH & GABION MATTRESS | PALO PINTO | 2019-01-09 | $478,530.00 | $419,010.00 |
| Rank 4of 5 | LEVEL UP AND OVERLAY | YOUNG | 2019-01-09 | $2,942,874.21 | $2,678,507.13 |
| Rank 5of 6 | FLEXIBLE PAV STR REPAIR (MILL AND INLAY) | PARKER | 2019-01-09 | $3,086,500.00 | $2,439,851.02 |
| Low bidof 5 | REHABILITATE AND WIDEN ROADWAY | SHACKELFORD | 2019-01-08 | $12,581,377.01 | $12,581,377.01 |
| Low bidof 6 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | COLLIN | 2019-01-08 | $2,436,804.35 | $2,436,804.35 |
| Rank 3of 7 | BASE REPAIR LEVEL UP AND OVERLAY | JONES | 2019-01-08 | $7,925,454.15 | $7,597,359.90 |
| Rank 9of 10 | BRIDGE PROVENTATIVE MAINTENANCE | CHEROKEE | 2018-12-11 | $372,872.80 | $255,590.17 |
| Rank 3of 3 | SEAL COAT AND PAVEMENT MARKINGS | VAN ZANDT | 2018-12-06 | $16,542,882.89 | $14,140,387.28 |
| Rank 4of 6 | FOAMED ASPH TRT,ACP SURF & PAV MRKS | HARRISON | 2018-12-06 | $3,087,547.90 | $2,792,494.90 |
| Rank 2of 9 | REHABILITATE EXISTING PAVEMENT | ELLIS | 2018-12-06 | $7,242,211.99 | $7,140,372.10 |
| Rank 4of 5 | SAFETY TREAT FIXED OBJECTS | SABINE | 2018-12-05 | $2,183,435.10 | $1,954,394.00 |
| Rank 4of 4 | CONSTRUCT PAVED SHLDRS,MILLED RUMBLE STRIPS | LIBERTY | 2018-12-05 | $2,011,664.55 | $1,711,111.03 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.