Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
772 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 9 | GRADING, STRUCTURES, BASE, PAVING | KAUFMAN | 2018-12-05 | $1,072,928.01 | $1,047,916.23 |
| Low bidof 5 | MILL, BASE REPAIR, OVERLAY | COLLIN | 2018-12-05 | $1,873,091.10 | $1,873,091.10 |
| Rank 3of 7 | MILL AND INLAY | EASTLAND | 2018-12-05 | $623,869.30 | $547,807.00 |
| Rank 2of 5 | FLEXIBLE PAVEMENT REPAIR | DALLAS | 2018-12-05 | $598,106.00 | $550,545.00 |
| Rank 2of 15 | REPLACE BRIDGE AND APPROACHES | NAVARRO | 2018-11-07 | $8,221,951.33 | $7,969,999.98 |
| Rank 2of 3 | RESURFACE WITH SEAL COAT | SHELBY | 2018-11-06 | $11,782,725.17 | $10,961,024.55 |
| Rank 4of 5 | WDN SHLDRS & ADD PASS LNS | LIMESTONE | 2018-11-06 | $10,921,124.93 | $9,187,964.04 |
| Rank 3of 3 | RESURFACE WITH SEALCOAT | HOUSTON | 2018-11-06 | $3,718,005.62 | $2,929,222.97 |
| Rank 2of 5 | REHABILIATION | FLOYD | 2018-11-06 | $10,548,273.34 | $9,844,109.88 |
| Rank 2of 3 | REHAB EXISTING ROADWAY/OVERLAY/STRIPING | JASPER | 2018-11-06 | $614,828.58 | $497,996.12 |
| Rank 3of 6 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | JASPER | 2018-11-06 | $1,310,586.62 | $897,768.20 |
| Rank 3of 7 | RECONST PVMT & ADD PASSING LANES, ETC. | SAN JACINTO | 2018-10-03 | $12,264,159.50 | $11,494,473.51 |
| Low bidof 5 | BS RPR,TRT SBGD,ACP,OCST,PFC,STRS,SIGNS,PM | ANDERSON | 2018-10-03 | $6,180,316.71 | $6,180,316.71 |
| Rank 3of 8 | REHAB AND WIDEN EXISTING PAVMENT | HOUSTON | 2018-10-03 | $4,332,433.32 | $4,041,100.84 |
| Rank 2of 6 | MILL AND INLAY | HOUSTON | 2018-10-03 | $1,440,747.28 | $1,388,699.48 |
| Rank 3of 5 | REHABILITATE EXISTING PAVEMENT AND ADD SHOULDERS | NAVARRO | 2018-10-02 | $8,673,698.85 | $7,343,202.30 |
| Rank 7of 8 | CULVERT REPAIR | CLAY | 2018-10-02 | $756,097.00 | $579,763.00 |
| Rank 2of 3 | MILL AND INLAY | TRINITY | 2018-10-02 | $1,639,738.60 | $1,470,447.62 |
| Rank 3of 7 | CONSTRUCT SUPER TWO | JONES | 2018-09-07 | $11,254,375.67 | $10,819,113.52 |
| Rank 5of 5 | REHABILITATION OF EXISTING ROAD | HOPKINS | 2018-09-07 | $6,552,731.49 | $5,134,494.64 |
| Rank 7of 9 | GR,CMT TRT SBGRD,ACP,OCST,STRS,MBGF,PV MK | SMITH | 2018-09-07 | $3,528,208.60 | $3,017,503.37 |
| Rank 2of 8 | REHABILITATE HIGHWAY | ROCKWALL | 2018-09-07 | $1,346,102.38 | $1,258,635.45 |
| Rank 2of 3 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | NAVARRO | 2018-09-07 | $944,787.66 | $655,525.61 |
| Rank 4of 4 | BASE RPR, OVERLAY, PAVMT MARK | JOHNSON | 2018-09-06 | $2,090,232.60 | $1,866,926.45 |
| Rank 3of 6 | MILL, OVERLAY & MRKINGS; BRIDGE RAIL REPLACE | KAUFMAN | 2018-09-06 | $6,956,376.26 | $6,161,838.27 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.