Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
772 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 5 | ASPHALTIC CONCRETE PAVEMENT OVERLAY | KING | 2018-09-06 | $3,622,844.31 | $3,231,944.54 |
| Rank 3of 7 | EMB, FL BS, STRS, AND ACP | TAYLOR | 2018-08-08 | $33,846,525.53 | $27,993,542.39 |
| Rank 2of 4 | GR,STRS,ACP BS&SURF,MBGF,SIGNALS,PV MK | SMITH | 2018-08-08 | $17,864,235.85 | $16,738,120.33 |
| Rank 3of 4 | REHABILITATION OF EXISTING ROAD | FANNIN | 2018-08-08 | $9,542,504.24 | $8,647,080.43 |
| Rank 2of 6 | PAVEMENT WIDENING | HOWARD | 2018-08-08 | $3,551,765.24 | $3,443,262.37 |
| Rank 4of 7 | PL,BS,SURF TRT,ACP,STRS,MBGF,SIGNS,PV MK | RUSK | 2018-08-08 | $8,459,951.45 | $7,676,966.96 |
| Low bidof 3 | SAFETY TREAT FIXED OBBJECTS, PROVIDE ADDL WIDTH | WICHITA | 2018-08-08 | $5,646,361.90 | $5,646,361.90 |
| Rank 9of 9 | GR, DR, STR, BS AND PAVEMENT | HOOD | 2018-08-07 | $79,933,962.46 | $60,713,830.16 |
| Rank 2of 3 | WIDEN ROADWAY | JONES | 2018-08-07 | $14,248,301.12 | $13,833,694.00 |
| Rank 4of 7 | INSTALL MEDIAN BARRIER | WICHITA | 2018-08-07 | $2,277,035.09 | $2,014,723.35 |
| Rank 4of 4 | BASE, ASP, PVT MRK | DENTON | 2018-08-07 | $2,043,635.98 | $1,667,506.66 |
| Rank 5of 6 | FLEX BASE, TCST, MILL & INLAY, PV MK | RUSK | 2018-08-07 | $1,849,578.69 | $1,667,776.70 |
| Rank 6of 8 | REHABILITATE EXISTING ROAD | BRAZOS | 2018-08-07 | $3,589,086.50 | $2,816,987.76 |
| Low bidof 8 | GR, BS, OCST, ACP SURF, STRS, PV MK | ANDERSON | 2018-07-11 | $2,573,741.95 | $2,573,741.95 |
| Rank 7of 8 | IMPROVE GUARDRAIL TO DES STANDARDS | ANGELINA | 2018-07-11 | $2,231,387.20 | $1,620,249.39 |
| Rank 10of 11 | REPLACE BRIDGE AND APPROACHES | KAUFMAN | 2018-07-11 | $3,659,844.25 | $2,718,727.83 |
| Low bidof 6 | RECONSTRUCT, ADD SHOULDERS, AND TEXTURIZE ROADWAY | KAUFMAN | 2018-07-11 | $7,818,547.17 | $7,818,547.17 |
| Rank 2of 6 | GR, FLX BS, OCST, STRS, PVT MRK | SMITH | 2018-07-11 | $2,860,857.80 | $2,792,589.05 |
| Rank 3of 4 | RESTORE EXISTING PAVEMENT AND ADD SHOULDERS | ROCKWALL | 2018-07-11 | $4,773,395.42 | $4,349,076.68 |
| Rank 2of 7 | WIDEN NON-FREEWAY | FANNIN | 2018-07-10 | $75,389,705.18 | $73,437,885.70 |
| Rank 3of 4 | WIDEN FROM 2 TO 4 LANES | NACOGDOCHES | 2018-07-10 | $3,193,688.56 | $2,896,894.25 |
| Low bidof 8 | WDN, OV, BS REP | COLLIN | 2018-07-10 | $5,440,851.66 | $5,440,851.66 |
| Rank 6of 6 | GR,FLX BS,ACP,CULV EXT&RPLCMT,SIGNS,PV MK | SMITH | 2018-07-10 | $18,348,798.00 | $14,458,790.48 |
| Rank 3of 3 | REHABILITATE EXISTING ROAD | MADISON | 2018-06-06 | $23,557,037.63 | $18,706,597.23 |
| Rank 2of 3 | REHABILITATE EXISTING PAVEMENT | ELLIS | 2018-06-06 | $9,421,579.00 | $8,149,846.60 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.