Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
678 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 8 | WIDEN ROAD - ADD LANES | BURLESON | 2021-07-02 | $34,287,617.70 | $34,287,617.70 |
| Low bidof 5 | SAFETY TREAT FIXED OBJECTS, PROVIDE ADDITIONAL PAV | MCLENNAN | 2021-07-02 | $3,425,176.89 | $3,425,176.89 |
| Low bidof 3 | SURFACING/ROADWAY RESTORATION | HILL | 2021-07-02 | $4,587,556.71 | $4,587,556.71 |
| Rank 2of 4 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | ELLIS | 2021-07-02 | $1,587,127.25 | $1,445,730.85 |
| Low bidof 9 | RESURFACE ROADWAY | EASTLAND | 2021-07-01 | $1,372,072.30 | $1,372,072.30 |
| Rank 2of 5 | INTERSECTION IMPROVEMENTS WITH TURN LANES | WALKER | 2021-07-01 | $983,875.70 | $946,421.73 |
| Rank 2of 4 | HMA MILL & INLAY | BRAZOS | 2021-07-01 | $734,185.00 | $708,467.00 |
| Rank 4of 4 | SPOT BASE REPAIR | WASHINGTON | 2021-07-01 | $891,035.00 | $638,323.50 |
| Rank 3of 6 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | NAVARRO | 2021-06-04 | $787,100.00 | $627,995.00 |
| Rank 2of 4 | BASE FAILURE PAVEMENT REPAIR | BELL | 2021-06-04 | $881,352.40 | $749,996.28 |
| Rank 3of 4 | BASE FAILURE PAVEMENT REPAIR | BOSQUE | 2021-06-04 | $787,850.65 | $691,966.43 |
| Rank 2of 4 | BASE FAILURE PAVEMENT REPAIR | CORYELL | 2021-06-04 | $487,639.00 | $372,500.50 |
| Low bidof 7 | REHABILITATE EXISTING ROADWAY | ERATH | 2021-06-03 | $6,087,434.10 | $6,087,434.10 |
| Low bidof 7 | REPLACE BRIDGE & APPROACHES | CORYELL | 2021-06-03 | $5,087,623.20 | $5,087,623.20 |
| Rank 2of 5 | HOT MIX | WALKER | 2021-06-03 | $1,124,560.87 | $1,051,583.93 |
| Low bidof 6 | SPOT BASE REPAIR | BRAZOS | 2021-06-03 | $654,817.50 | $654,817.50 |
| Low bidof 4 | HMA MILL AND INLAY | WALKER | 2021-06-03 | $1,225,720.00 | $1,225,720.00 |
| Rank 3of 5 | HOT MIX | BELL | 2021-05-06 | $679,050.00 | $656,600.00 |
| Low bidof 3 | HOT MIX | BOSQUE | 2021-05-06 | $543,500.00 | $543,500.00 |
| Low bidof 3 | HOT MIX | HILL | 2021-05-06 | $458,550.00 | $458,550.00 |
| Low bidof 3 | HOT MIX | LIMESTONE | 2021-05-06 | $178,000.00 | $178,000.00 |
| Low bidof 3 | HOT MIX | FALLS | 2021-05-06 | $540,900.00 | $540,900.00 |
| Rank 3of 9 | RESURFACE ROADWAY | COMANCHE | 2021-05-05 | $2,804,200.90 | $2,320,588.82 |
| Rank 2of 3 | BASE FAILURE PAVEMENT REPAIR | MCLENNAN | 2021-05-05 | $629,170.00 | $534,686.20 |
| Rank 2of 4 | BASE FAILURE PAVEMENT REPAIR | LIMESTONE | 2021-05-05 | $960,473.50 | $887,744.65 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.