Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
678 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 4 | BASE FAILURE PAVEMENT REPAIR | FALLS | 2021-05-05 | $187,374.95 | $157,745.45 |
| Rank 3of 6 | BASE FAILURE PAVEMENT REPAIR | HILL | 2021-05-05 | $742,904.70 | $631,827.23 |
| Rank 2of 8 | REPLACE BRIDGE AND APPROACHES | MCLENNAN | 2021-04-07 | $502,540.50 | $458,027.30 |
| Low bidof 5 | SPOT BASE REPAIR | WALKER | 2021-04-07 | $828,385.00 | $828,385.00 |
| Rank 2of 4 | HMA MILL AND INLAY | WASHINGTON | 2021-04-07 | $1,019,387.00 | $986,327.00 |
| Low bidof 2 | SUPERPAVE- MATERIALS ONLY | HENDERSON | 2021-03-16 | $225,200.00 | $225,200.00 |
| Low bidof 2 | HOT MIX | ANDERSON | 2021-03-16 | $303,000.00 | $303,000.00 |
| Rank 3of 5 | SURFACING/ROADWAY RESTORATION | SMITH | 2021-03-05 | $18,487,846.15 | $16,954,295.26 |
| Rank 2of 9 | RESTORATION OF EXISTING PAVEMENT & ADD SHOULDERS | NAVARRO | 2021-03-05 | $7,987,702.76 | $7,986,235.47 |
| Rank 2of 4 | RESURFACE ROADWAY | BELL | 2021-03-05 | $1,587,439.15 | $1,390,231.41 |
| Rank 10of 10 | UPGRADE MBGF | MCLENNAN | 2021-03-04 | $2,673,946.00 | $1,857,024.50 |
| Rank 4of 4 | SURFACING/ROADWAY RESTORATION | HOUSTON | 2021-03-04 | $1,487,928.38 | $1,107,444.66 |
| Low bidof 6 | RESURFACE ROADWAY | JOHNSON | 2021-02-05 | $6,387,249.33 | $6,387,249.33 |
| Rank 4of 10 | INTERSECTION IMPROVEMENTS, RT & LT TURN LANES | WALKER | 2021-02-05 | $2,273,860.18 | $2,117,590.11 |
| Rank 4of 13 | ADDING SHOULDERS WITH NO ADDED CAPACITY | WILLIAMSON | 2021-02-04 | $8,787,974.60 | $8,428,384.67 |
| Rank 2of 8 | PAVEMENT REPAIR AND SURFACING | FAYETTE | 2021-02-04 | $3,572,380.87 | $3,404,043.80 |
| Low bidof 7 | RAMP MODIFICATIONS, BRIDGE & PAVEMENT REPAIRS | LEON | 2021-02-04 | $1,382,171.20 | $1,382,171.20 |
| Low bidof 5 | MILL AND INLAY | MADISON | 2021-02-04 | $1,673,115.05 | $1,673,115.05 |
| Low bidof 7 | FULL DEPTH REPAIR, LEVEL-UP & TOM | LEE | 2021-01-08 | $2,887,592.71 | $2,887,592.71 |
| Rank 6of 8 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | JOHNSON | 2021-01-08 | $1,107,800.00 | $879,001.77 |
| Rank 7of 7 | REHABILITATE EXISTING ROADWAY | BASTROP | 2021-01-07 | $1,287,140.07 | $1,022,332.81 |
| Rank 2of 6 | RECONSTRUCT EXISTING ROADWAY & LANDSCAPE WORK | MCCULLOCH | 2020-12-03 | $7,285,770.87 | $7,056,081.05 |
| Rank 4of 5 | FLEXIBLE BASE(STOCKPILE)(MATERIALS ONLY) | BRAZOS | 2020-11-17 | $184,000.00 | $140,250.00 |
| Rank 2of 5 | FLEXIBLE BASE(STOCKPILE)(MATERIALS ONLY) | WALKER | 2020-11-17 | $106,250.00 | $81,587.50 |
| Low bidof 8 | HAZARD ELIMINATION & SAFETY | BASTROP | 2020-11-05 | $3,987,883.56 | $3,987,883.56 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.