Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
678 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 1 | HOT MIX ASPHALT (MATERIAL ONLY) | ELLIS | 2020-08-04 | $233,500.00 | $233,500.00 |
| Low bidof 7 | SIDEWALK, RAMPS, BENCHES & LIGHT'G | MILAM | 2020-07-09 | $4,509,031.70 | $4,509,031.70 |
| Rank 2of 5 | LEVEL-UP, REPAIR, OVERLAY & PVMNT MRK | BASTROP | 2020-07-09 | $2,996,026.98 | $2,826,332.68 |
| Low bidof 6 | GRADING,ACP BS&SURF, BS RPR, OCST,MBGF,SIGNS,PVMK | HENDERSON | 2020-07-09 | $1,730,130.35 | $1,730,130.35 |
| Low bidof 4 | OVERLAY & MILL AND INLAY | SAN JACINTO | 2020-07-09 | $1,721,052.24 | $1,721,052.24 |
| Rank 2of 4 | SAFETY TREAT FIXED OBJECTS, WIDEN PAVED SHOULDER T | FALLS | 2020-07-08 | $3,087,716.37 | $3,054,891.44 |
| Rank 3of 10 | REPLACE BRIDGE AND APPROACHES | LIMESTONE | 2020-07-08 | $1,737,742.40 | $1,360,592.20 |
| Rank 4of 4 | INSTALL RAISED MEDIAN | BRAZOS | 2020-07-08 | $3,012,066.82 | $2,417,981.60 |
| Low bidof 5 | SAFETY IMPROVEMENT PROJECT | BASTROP | 2020-07-08 | $7,305,240.14 | $7,305,240.14 |
| Low bidof 1 | CONCRETE MATERIALS ONLY | HENDERSON | 2020-06-09 | $61,400.00 | $61,400.00 |
| Low bidof 1 | CONCRETE MATERIAL_ONLY | CHEROKEE | 2020-06-09 | $61,400.00 | $61,400.00 |
| Low bidof 1 | CONCRETE MATERIALS ONLY | ANDERSON | 2020-06-09 | $61,400.00 | $61,400.00 |
| Rank 2of 3 | HOT MIX ASPHALT TYPE C & D (MATERIAL ONLY) | HOUSTON | 2020-06-05 | $627,000.00 | $594,200.00 |
| Rank 2of 4 | WIDEN FROM FOUR TO SIX LANES AND RESURFACE | BELL | 2020-06-04 | $40,870,616.21 | $39,466,124.00 |
| Low bidof 8 | REHABILITATION OF EXISTING ROAD | HOUSTON | 2020-06-04 | $2,432,670.10 | $2,432,670.10 |
| Rank 2of 4 | BASE FAILURE PAVEMENT REPAIR | BELL | 2020-06-04 | $1,214,586.65 | $1,206,361.24 |
| Rank 2of 4 | BASE FAILURE PAVEMENT REPAIR | BOSQUE | 2020-06-04 | $495,937.75 | $488,477.49 |
| Low bidof 3 | BASE FAILURE PAVEMENT REPAIR | CORYELL | 2020-06-04 | $527,888.53 | $527,888.53 |
| Low bidof 4 | BASE FAILURE PAVEMENT REPAIR | HAMILTON | 2020-06-04 | $429,199.00 | $429,199.00 |
| Low bidof 3 | REBUILD 2 LANES TO 4, STORM SEWER, SIGNAL, & ILLUM | COMANCHE | 2020-05-08 | $10,287,230.40 | $10,287,230.40 |
| Low bidof 5 | BASE FAILURE PAVEMENT REPAIR | LIMESTONE | 2020-05-08 | $434,030.75 | $434,030.75 |
| Rank 2of 4 | BASE FAILURE PAVEMENT REPAIRS | MCLENNAN | 2020-05-08 | $896,260.00 | $827,443.70 |
| Rank 3of 10 | CONSTRUCT SUPER 2 PASSING LANES | LLANO | 2020-05-07 | $4,809,267.49 | $4,653,514.57 |
| Rank 2of 5 | US 79 OVERLAY | MILAM | 2020-05-07 | $1,987,771.97 | $1,914,085.70 |
| Rank 3of 5 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | ELLIS | 2020-05-07 | $1,887,785.40 | $1,369,228.55 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.