Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
678 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 5 | BASE FAILURE PAVEMENT REPAIR | FALLS | 2020-05-07 | $576,302.50 | $435,115.30 |
| Rank 4of 6 | BASE FAILURE PAVEMENT REPAIR | HILL | 2020-05-07 | $1,087,742.00 | $812,251.75 |
| Low bidof 3 | DENSE-GRADED HOT-MIX ASPHALT(MATERIAL ONLY) | FREESTONE | 2020-04-14 | $232,500.00 | $232,500.00 |
| Low bidof 2 | DENSE-GRADED HOT-MIX ASPHALT(MATERIAL ONLY) | GRIMES | 2020-04-14 | $276,500.00 | $276,500.00 |
| Low bidof 3 | DENSE-GRADED HOT-MIX ASPHALT(MATERIAL ONLY) | MILAM | 2020-04-14 | $234,000.00 | $234,000.00 |
| Rank 2of 5 | CONSTRUCT SUPER 2 HIGHWAY AND SURFACING | COMANCHE | 2020-04-09 | $14,187,568.33 | $13,793,112.53 |
| Low bidof 3 | HOT MIX - MATERIAL ONLY | BOSQUE | 2020-04-09 | $800,750.00 | $800,750.00 |
| Rank 3of 4 | HOT MIX - MATERIAL ONLY | BELL | 2020-04-09 | $2,410,000.00 | $2,275,500.00 |
| Low bidof 3 | HOT MIX - MATERIAL ONLY | CORYELL | 2020-04-09 | $519,000.00 | $519,000.00 |
| Rank 4of 7 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | NAVARRO | 2020-04-08 | $1,087,143.00 | $1,009,303.00 |
| Rank 5of 6 | SUBGRADE WDN, ACP BS, OCST, ACP SURF, STRS, MBGF, | CHEROKEE | 2020-03-05 | $5,987,011.18 | $5,515,687.82 |
| Rank 3of 3 | HOT MIX-MATERIAL ONLY | FALLS | 2020-03-04 | $1,152,000.00 | $1,108,250.00 |
| Rank 3of 3 | HOT MIX-MATERIAL ONLY | HILL | 2020-03-04 | $1,457,450.00 | $1,393,832.50 |
| Rank 3of 3 | HOT MIX-MATERIAL ONLY | LIMESTONE | 2020-03-04 | $2,085,000.00 | $2,010,250.00 |
| Rank 3of 3 | HOT MIX-MATERIAL ONLY | MCLENNAN | 2020-03-04 | $2,690,500.00 | $2,635,350.00 |
| Low bidof 5 | REHAB & WIDEN ROADWAY | HAMILTON | 2020-02-07 | $5,387,759.04 | $5,387,759.04 |
| Rank 2of 5 | PLANING, PVT REPAIR, OCST, ACP, MBGF & PV MK | ANDERSON | 2020-02-07 | $1,687,295.90 | $1,534,652.75 |
| Rank 3of 6 | INSTALL TWO-WAY LEFT TURN LANE | MILAM | 2020-02-07 | $447,728.25 | $376,466.30 |
| Low bidof 4 | ASPHALTIC CONCRETE OVERLAY | CORYELL | 2020-02-06 | $2,987,724.20 | $2,987,724.20 |
| Low bidof 6 | OVERLAY | BASTROP | 2020-02-06 | $2,787,166.88 | $2,787,166.88 |
| Rank 4of 5 | MILL & INLAY (CALL-OUT) | BROWN | 2020-02-06 | $2,287,959.00 | $1,576,676.90 |
| Rank 2of 4 | REHABILITATE PAVEMENT STRUCTURE | LIMESTONE | 2019-12-04 | $7,287,476.67 | $7,107,478.07 |
| Low bidof 3 | ADD PASS LNS, MILL/INLY | BOSQUE | 2019-11-06 | $19,873,560.72 | $19,873,560.72 |
| Rank 4of 5 | REPAIR AND RESURFACE HIGHWAY | NAVARRO | 2019-11-06 | $14,287,825.31 | $12,342,946.36 |
| Rank 3of 3 | OVERLAY | BRAZOS | 2019-11-06 | $1,922,047.15 | $1,595,061.65 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.