Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
678 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 6 | SPOT BASE REPAIR | WALKER | 2018-06-05 | $872,637.50 | $799,315.00 |
| Rank 4of 5 | SPOT BASE REPAIR | WASHINGTON | 2018-06-05 | $872,637.50 | $766,590.00 |
| Rank 4of 4 | MILL AND INLAY | BRAZOS | 2018-06-05 | $5,103,831.79 | $2,477,766.49 |
| Rank 3of 3 | WIDEN PAVEMENT | FALLS | 2018-05-15 | $187,499.21 | $164,978.68 |
| Low bidof 6 | REPAIR AND RESURFACE HIGHWAY | NAVARRO | 2018-05-02 | $12,773,111.87 | $12,773,111.87 |
| Low bidof 2 | RECONSTRUCT URBAN ROADWAY | EASTLAND | 2018-05-02 | $16,887,011.55 | $16,887,011.55 |
| Rank 3of 8 | REPAIR, LEVEL-UP & SEAL COAT | LEE | 2018-05-02 | $1,572,228.30 | $1,244,148.05 |
| Rank 3of 5 | SEAL/OVLY | BELL | 2018-05-02 | $1,075,949.40 | $888,222.00 |
| Low bidof 5 | PLNG,ACP,OCST,PFC,PVT MRKG | ANDERSON | 2018-05-02 | $3,987,345.30 | $3,987,345.30 |
| Rank 2of 5 | REHAB EXISTING ROADWAY | MCCULLOCH | 2018-05-01 | $2,587,017.55 | $2,449,573.59 |
| Rank 2of 4 | MILL/PFC OVLY | MCLENNAN | 2018-04-04 | $5,087,352.21 | $4,721,563.44 |
| Rank 2of 4 | OVERLAY, PLANING, MBGF, STRUCTURES | MADISON | 2018-04-04 | $1,087,589.51 | $1,063,526.99 |
| Low bidof 14 | FLX BS,LVL-UP,OCST,HMAC,STRS,PV MRK | VAN ZANDT | 2018-04-03 | $9,587,787.65 | $9,587,787.65 |
| Rank 2of 7 | PAVEMENT REPAIR AND SURFACING | FAYETTE | 2018-04-03 | $7,595,570.80 | $7,416,527.17 |
| Low bidof 4 | WDN GR, STRS & SURF | MCLENNAN | 2018-04-03 | $11,487,769.98 | $11,487,769.98 |
| Rank 2of 5 | ADD LEFT TURN LANE | MCLENNAN | 2018-04-03 | $391,355.60 | $342,755.30 |
| Rank 5of 5 | MILL/OVLY | BELL | 2018-03-07 | $1,288,661.20 | $796,526.10 |
| Rank 2of 5 | HMA OVERLAY | WALKER | 2018-03-07 | $6,887,336.82 | $6,333,633.62 |
| Rank 4of 5 | BASE OVERLAY,2 COURSE SURF TRT, ACP | COMANCHE | 2018-03-07 | $5,567,195.95 | $5,024,304.05 |
| Rank 2of 4 | UNDERSEAL/LEVELUP/OVERLAY | MCLENNAN | 2018-03-06 | $799,167.65 | $720,812.07 |
| Rank 5of 7 | WDN, GR, SURF, ADD SHLDRS | HAMILTON | 2018-02-02 | $3,626,876.99 | $3,288,708.72 |
| Low bidof 7 | BS RPR,PLNG,SUPRPVE,OCST,PFC,MBGF,SGNS,PV MK | HENDERSON | 2018-02-02 | $2,687,805.15 | $2,687,805.15 |
| Rank 2of 8 | BASE REPAIR AND OVERLAY | ELLIS | 2018-02-02 | $1,061,349.58 | $829,774.11 |
| Rank 4of 4 | SEAL/OVLY | MCLENNAN | 2018-02-02 | $939,737.08 | $845,727.71 |
| Rank 2of 6 | FLEXIBLE PAVEMENT STRUCTURE REPAIR AND OVERLAY | NAVARRO | 2018-02-02 | $511,258.25 | $397,396.40 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.