Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
678 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 4 | MILLING ASPHALT PAVEMENT TO IMPROVE RIDE/DRAINAGE | MILLS | 2018-02-02 | $487,100.66 | $385,344.50 |
| Low bidof 8 | GR, STRS & SURF | MCLENNAN | 2018-02-01 | $20,587,594.96 | $20,587,594.96 |
| Rank 8of 8 | HMAC OV AND SPOT BASE REPAIR | KAUFMAN | 2018-02-01 | $2,580,303.07 | $1,757,483.92 |
| Low bidof 7 | LEVEL-UP, FULL DEPTH REPAIR AND TOM | LEE | 2018-02-01 | $5,387,885.79 | $5,387,885.79 |
| Rank 3of 4 | TOM OVLY | MCLENNAN | 2018-02-01 | $307,027.40 | $278,606.89 |
| Rank 2of 3 | OVERLAY | BRAZOS | 2017-12-06 | $5,787,893.78 | $5,427,954.28 |
| Low bidof 6 | WDN, BS, STR, SURF | BELL | 2017-12-06 | $7,287,694.48 | $7,287,694.48 |
| Rank 6of 6 | SEAL/LVL UP/OVLY | BELL | 2017-12-05 | $841,504.87 | $795,655.68 |
| Rank 3of 6 | ACP OVERLAY | AUSTIN | 2017-11-03 | $1,187,242.69 | $1,151,604.59 |
| Rank 4of 5 | RECONSTRUCT AND WIDEN PAVEMENT | TRINITY | 2017-10-04 | $4,983,703.90 | $4,311,589.97 |
| Low bidof 6 | WDN, GR, SURF, ADD PASS LNS | BELL | 2017-10-03 | $6,123,477.87 | $6,123,477.87 |
| Rank 2of 11 | ACP OVERLAY | COMANCHE | 2017-10-03 | $967,678.82 | $918,207.81 |
| Low bidof 4 | SEAL COAT AND HMA OVERLAY | BURLESON | 2017-10-03 | $1,023,189.87 | $1,023,189.87 |
| Rank 2of 12 | REHABILITATE EXISTING ROAD | MILAM | 2017-09-07 | $1,460,312.87 | $1,428,673.97 |
| Rank 2of 3 | STRUCTURE IMPROVEMENTS | MATAGORDA | 2017-09-07 | $887,342.50 | $827,505.00 |
| Low bidof 4 | OVERLAY, PLANING, MBGF, BRIDGE RAIL | LEON | 2017-09-07 | $2,153,409.70 | $2,153,409.70 |
| Low bidof 5 | WDN, GR, BS, SURF, ADD SHLDRS | FALLS | 2017-08-09 | $3,524,688.87 | $3,524,688.87 |
| Low bidof 6 | PROV ADDTL PV SURF WDTH | LIMESTONE | 2017-08-09 | $1,299,987.08 | $1,299,987.08 |
| Low bidof 3 | RAMP RELOCATION | LEON | 2017-08-09 | $8,878,806.51 | $8,878,806.51 |
| Rank 2of 8 | SPOT BASE REPAIR | BRAZOS | 2017-08-09 | $837,235.50 | $816,109.50 |
| Low bidof 5 | MILL AND INLAY | HOUSTON | 2017-08-09 | $1,387,213.56 | $1,387,213.56 |
| Rank 4of 5 | PEDESTRIAN AND BICYCLE IMPROVEMENTS | BRAZOS | 2017-08-08 | $2,671,615.64 | $1,803,581.23 |
| Rank 3of 7 | ACP OVERLAY | FAYETTE | 2017-08-08 | $2,487,306.27 | $2,399,994.55 |
| Rank 3of 6 | OVERLAY | GRIMES | 2017-08-08 | $2,233,087.79 | $2,078,724.66 |
| Low bidof 4 | HMA MILL AND INLAY | WASHINGTON | 2017-08-08 | $648,765.00 | $648,765.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.