Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
347 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 3 | ASPHALTIC CONCRETE OVERLAY | DONLEY | 2019-02-06 | $6,042,219.55 | $4,527,707.02 |
| Rank 3of 4 | BRIDGE REPLACEMENT AND APPROACHES | POTTER | 2019-02-06 | $5,325,284.46 | $4,976,890.27 |
| Rank 4of 4 | ROADWAY REHABILITATION | CULBERSON | 2019-02-05 | $3,175,544.40 | $2,339,706.95 |
| Rank 7of 7 | IMPROVE DRAINAGE | MARTIN | 2019-02-05 | $1,407,480.00 | $935,180.63 |
| Rank 8of 8 | 3"OVERLAY | CALLAHAN | 2019-01-09 | $4,120,606.76 | $3,259,092.60 |
| Rank 2of 2 | REHABILITATION OF EXISTING ROADWAY | FOARD | 2019-01-09 | $4,817,283.12 | $4,375,237.33 |
| Rank 3of 5 | ACP OVERLAY,CRCP REPAIR, MBGF, AND STRIPING. | CARSON | 2019-01-09 | $8,976,046.55 | $8,012,745.35 |
| Rank 6of 7 | BASE REPAIR LEVEL UP AND OVERLAY | JONES | 2019-01-08 | $9,062,725.20 | $7,597,359.90 |
| Rank 3of 6 | BRIDGE MAINTENANCE | HALE | 2018-12-06 | $3,441,192.86 | $2,885,701.50 |
| Rank 8of 8 | BRIDGE CONSTRUCTION | SWISHER | 2018-12-05 | $786,802.50 | $503,110.00 |
| Rank 5of 6 | CULVERT EXTENSIONS & SAFETY END TREATMENTS | HALL | 2018-11-07 | $1,631,801.44 | $774,679.70 |
| Low bidof 5 | REHABILIATION | FLOYD | 2018-11-06 | $9,844,109.88 | $9,844,109.88 |
| Rank 4of 4 | CULVERT/STRUCTURE REPAIR | ECTOR | 2018-11-06 | $2,147,630.01 | $1,239,673.05 |
| Rank 5of 6 | EBL - FULL DEPTH REPAIR, MILL AND FILL | CARSON | 2018-10-03 | $17,779,297.98 | $16,196,034.33 |
| Rank 3of 3 | MEDIANS | LUBBOCK | 2018-10-03 | $3,530,747.20 | $2,576,443.65 |
| Rank 2of 2 | ASPHALTICE CONCRETE PAVEMENT OVERLAY | DICKENS | 2018-10-03 | $3,255,763.90 | $2,969,974.51 |
| Rank 2of 4 | CALL OUT CONCRETE PAV REPAIR | WHEELER | 2018-10-03 | $1,043,500.00 | $975,435.00 |
| Rank 5of 5 | OVERLAY | GRAY | 2018-10-02 | $19,366,285.02 | $16,401,396.63 |
| Low bidof 5 | EBL - MILL, REHAB AND OVERLAY | CARSON | 2018-09-07 | $15,103,094.12 | $15,103,094.12 |
| Low bidof 3 | FULL DEPTH REHAB | CULBERSON | 2018-09-07 | $20,059,666.10 | $20,059,666.10 |
| Rank 5of 7 | CONSTRUCT SUPER TWO | JONES | 2018-09-07 | $11,784,468.36 | $10,819,113.52 |
| Rank 5of 6 | OVERLAY | ARMSTRONG | 2018-09-07 | $7,698,011.66 | $6,591,547.92 |
| Rank 4of 4 | CRCP REPAIR | LUBBOCK | 2018-09-06 | $1,971,848.00 | $1,273,974.55 |
| Rank 6of 6 | REPLACEMENT OF EXISTING BRIDGE | DICKENS | 2018-09-06 | $1,916,142.00 | $1,626,092.36 |
| Rank 2of 5 | ASPHALTIC CONCRETE PAVEMENT OVERLAY | KING | 2018-09-06 | $3,487,111.72 | $3,231,944.54 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.