Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
347 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 5 | REPLACE EXISTING BRIDGES | HEMPHILL | 2020-03-05 | $21,519,020.20 | $16,941,869.76 |
| Rank 5of 6 | SUPER 2 - SUBGRADE WIDENING, STRUCTURES & ACP | COLLINGSWORTH | 2020-03-04 | $12,854,469.66 | $11,250,760.60 |
| Rank 4of 6 | EXCAVATION, EMBANKMENT, FLEX BASE, STRUCTURES AND | HOWARD | 2020-02-06 | $6,069,518.16 | $5,693,174.52 |
| Rank 7of 8 | FY 2020 BPM PROJECT | POTTER | 2020-01-10 | $1,049,034.00 | $660,194.32 |
| Rank 3of 5 | 2" ACP OVERLAY, PAVEMENT REPAIR | ARMSTRONG | 2019-12-04 | $10,554,061.76 | $8,973,976.38 |
| Low bidof 6 | CRCP REPAIR, OVERLAY AND BRIDGE RAIL REPLACEMENT F | GRAY | 2019-12-03 | $10,924,179.85 | $10,924,179.85 |
| Rank 2of 5 | OVERLAY AND PAVEMENT REPAIR | DALLAM | 2019-11-05 | $12,176,951.50 | $11,978,029.64 |
| Rank 2of 2 | REPLACE BRIDGE AND APPROACHES, RELOCATE RAMP | CARSON | 2019-10-02 | $5,959,892.88 | $5,732,295.93 |
| Rank 5of 5 | MILL, OVERLAY AND SAFETY | SHACKELFORD | 2019-09-06 | $16,920,697.97 | $12,663,688.29 |
| Rank 3of 6 | BRIDGE MAINTENANCE AND IMPROVEMENT | GARZA | 2019-09-05 | $1,622,851.60 | $1,306,629.40 |
| Rank 4of 4 | THICK OVERLAY AND PAVEMENT REPAIR | DALLAM | 2019-08-06 | $16,911,193.25 | $14,364,733.87 |
| Low bidof 2 | 2018 BMIP REPAIR BRIDGE | OLDHAM | 2019-05-08 | $7,204,392.00 | $7,204,392.00 |
| Rank 4of 6 | MILL & SMA OVRLAY | CALLAHAN | 2019-05-07 | $11,282,965.23 | $10,684,704.91 |
| Rank 3of 3 | REPLACE BRIDGE RAIL | POTTER | 2019-05-07 | $3,216,703.25 | $1,849,686.20 |
| Rank 5of 5 | REPLACE EXISTING OFF SYSTEM BRIDGE | HANSFORD | 2019-04-03 | $2,851,605.26 | $1,745,583.16 |
| Rank 4of 4 | SUPER 2 | WHEELER | 2019-04-02 | $12,648,589.86 | $9,862,939.49 |
| Rank 4of 4 | BRIDGE PREVENTATIVE MAINTENANCE | GARZA | 2019-04-02 | $2,523,200.50 | $1,523,850.00 |
| Rank 3of 4 | REHABILITAION OF EXISTING ROADWAY | HARDEMAN | 2019-03-06 | $4,940,959.94 | $3,994,436.14 |
| Low bidof 7 | 2019 BRIDGE PREVENTATIVE MAINTENANCE | RANDALL | 2019-03-06 | $1,009,428.00 | $1,009,428.00 |
| Rank 7of 7 | OVERLAY | OCHILTREE | 2019-03-05 | $17,975,791.37 | $13,814,377.45 |
| Low bidof 3 | BRIDGE MAINTENANCE | WHEELER | 2019-03-05 | $5,409,042.32 | $5,409,042.32 |
| Low bidof 5 | DRAINAGE WORK | HOWARD | 2019-03-05 | $1,866,062.30 | $1,866,062.30 |
| Rank 3of 4 | INSTALL SIDEWALKS | WILBARGER | 2019-03-05 | $891,414.60 | $739,514.50 |
| Rank 6of 6 | REPAIR SETS | LUBBOCK | 2019-03-05 | $400,650.00 | $277,650.00 |
| Rank 4of 4 | MISCELLANEOUS BRIDGE REPAIR | TAYLOR | 2019-03-05 | $998,700.07 | $763,458.19 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.