Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
417 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 6 | REPLACE BRIDGE & APPROACHES | TRAVIS | 2019-05-08 | $1,133,450.25 | $1,078,645.16 |
| Rank 7of 11 | REPLACE BRIDGE AND APPROACHES | COMAL | 2019-05-07 | $2,084,871.15 | $1,589,567.35 |
| Rank 4of 5 | RETAINING WALL REPAIR | BEXAR | 2019-05-07 | $479,362.00 | $389,024.00 |
| Low bidof 7 | INSTALL CONCRETE TRAFFIC BARRIERS | TRAVIS | 2019-04-03 | $556,062.50 | $556,062.50 |
| Rank 2of 2 | ROADWAY POTHOLE REPAIR | CULBERSON | 2019-04-03 | $669,560.00 | $648,250.00 |
| Low bidof 2 | BRIDGE PREVENTIVE MAINTENANCE (BPM) | JEFF DAVIS | 2019-04-03 | $460,470.00 | $460,470.00 |
| Low bidof 7 | REPLACE BRIDGE OVERPASS AND TIE-IN APPROACHES | WILLIAMSON | 2019-03-06 | $15,048,229.93 | $15,048,229.93 |
| Rank 3of 11 | CONSTRUCT RIPRAP | BEXAR | 2019-03-06 | $409,360.00 | $371,427.00 |
| Low bidof 6 | RECONSTRUCT EXISTING CULVERT | BEXAR | 2019-02-06 | $2,107,961.75 | $2,107,961.75 |
| Rank 3of 3 | ROADWAY SPALL & FULL DEPTH REPAIR | EL PASO | 2019-02-06 | $963,850.00 | $542,136.54 |
| Rank 3of 3 | ROADWAY SPALL & FULL DEPTH REPAIR | EL PASO | 2019-02-06 | $1,209,110.00 | $689,827.35 |
| Low bidof 4 | ROADWAY REHABILITATION | CULBERSON | 2019-02-05 | $2,339,706.95 | $2,339,706.95 |
| Low bidof 6 | GRADING, BASE, HMACP, PVMRK & SIGNS | WILLIAMSON | 2019-01-09 | $13,145,762.51 | $13,145,762.51 |
| Rank 4of 4 | PATHOLE REPAIR | EL PASO | 2018-12-06 | $625,900.50 | $394,551.00 |
| Rank 3of 3 | ROADWAY POTHOLE REPAIR | EL PASO | 2018-12-06 | $652,743.00 | $458,333.99 |
| Low bidof 3 | ROADWAY REPAIR | REEVES | 2018-12-06 | $1,684,133.77 | $1,684,133.77 |
| Rank 3of 10 | INTERSECTION OPERATIONAL IMPROVEMENTS | BEXAR | 2018-12-05 | $2,142,117.97 | $1,936,000.26 |
| Rank 3of 7 | SCOUR AND SPALL REPAIR,UPGRADE RAIL & DELAMINATION | BURNET | 2018-12-05 | $509,771.00 | $406,051.08 |
| Low bidof 5 | REPLACE BRIDGES AND APPROACHES | HUDSPETH | 2018-11-07 | $5,693,876.60 | $5,693,876.60 |
| Low bidof 3 | INSTALL CONTINUOUS LTL & SHOULDERS | TRAVIS | 2018-11-06 | $617,104.85 | $617,104.85 |
| Rank 2of 12 | REPLACE BRIDGE AND APPROACHES | BASTROP | 2018-11-06 | $449,720.95 | $399,604.26 |
| Rank 3of 4 | LP 375 RAMPS & FRONTAGE ROADS | EL PASO | 2018-10-03 | $36,546,864.68 | $32,640,631.19 |
| Rank 2of 4 | DEBRIS REMOVAL, REPAIR EMBANKMENT | TRAVIS | 2018-10-03 | $426,424.00 | $401,923.00 |
| Rank 3of 8 | REPAIR SLOPE FAILURE | BEXAR | 2018-10-02 | $3,863,948.32 | $2,967,146.61 |
| Rank 2of 4 | REPLACE RCP | TRAVIS | 2018-09-11 | $157,855.65 | $132,299.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.