Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
417 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 7 | EXPAND 2 TO 4 LN WITH MEDIAN, TURN LN, BIKE LN, SW | BEXAR | 2020-02-07 | $6,441,087.65 | $5,683,753.70 |
| Rank 2of 4 | PREVENTIVE MAINTENANCE | EL PASO | 2020-02-06 | $7,828,047.20 | $7,012,063.67 |
| Low bidof 4 | BRIDGE PREVENTATIVE MAINTENANCE | BASTROP | 2019-12-10 | $277,914.00 | $277,914.00 |
| Rank 2of 6 | REHABILITATION OF EXISTING ROAD | EL PASO | 2019-12-04 | $2,555,275.70 | $2,497,616.54 |
| Rank 5of 6 | SAFETY IMPROVEMENTS PROJECT | WILLIAMSON | 2019-12-03 | $845,461.60 | $776,375.30 |
| Low bidof 5 | CONCRETE RAIL AND RETAINING WALL REPAIR | BEXAR | 2019-11-13 | $127,075.00 | $127,075.00 |
| Rank 2of 4 | ROADWAY REHABILITATION | WARD | 2019-11-06 | $7,909,907.85 | $6,516,031.98 |
| Low bidof 3 | TRANSPORTATION NON-ROADWAY | PRESIDIO | 2019-11-06 | $4,630,960.30 | $4,630,960.30 |
| Rank 2of 5 | INFRASTRUCTURE IMPROVEMENTS | WILLIAMSON | 2019-10-03 | $344,979.55 | $287,073.15 |
| Low bidof 4 | ROADWAY REHABILITATION | REEVES | 2019-10-02 | $6,540,324.66 | $6,540,324.66 |
| Rank 3of 3 | GRADING,FLEX BASE,PAV,PAV MRK,SIGN,RETAIN WALL | TRAVIS | 2019-10-02 | $2,462,262.35 | $2,136,362.83 |
| Rank 3of 3 | METAL BEAM GUARDRAIL REPAIR | EL PASO | 2019-10-02 | $1,362,400.00 | $731,940.00 |
| Rank 2of 4 | REPAIR DRAINAGE PIPES | LEE | 2019-09-05 | $934,210.50 | $830,148.00 |
| Low bidof 4 | INSTALL MEDIAN BARRIERS | WARD | 2019-08-07 | $28,675,419.50 | $28,675,419.50 |
| Rank 3of 3 | MISCELLANEOUS CONCRETE REPAIR | EL PASO | 2019-08-07 | $1,429,300.00 | $720,085.00 |
| Low bidof 5 | INSTALL MEDIAN BARRIERS | REEVES | 2019-08-06 | $27,958,749.05 | $27,958,749.05 |
| Rank 3of 4 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | BASTROP | 2019-08-06 | $7,722,397.13 | $7,264,833.65 |
| Rank 6of 7 | PREVENTIVE MAINTENANCE | EL PASO | 2019-08-06 | $1,833,909.00 | $1,230,391.00 |
| Low bidof 3 | RECONSTRUCT EXIST 2LN RDWY TO 4 LN DIVIDED W/CLTL | TRAVIS | 2019-08-06 | $12,151,983.78 | $12,151,983.78 |
| Rank 2of 6 | CONSTRUCT POND SPILLWAY | TRAVIS | 2019-07-09 | $580,470.60 | $538,159.31 |
| Rank 2of 6 | INST PROTECTION, WIDEN SHLDRS & PAV MARKS | BANDERA | 2019-06-05 | $5,025,107.12 | $4,979,183.57 |
| Rank 3of 3 | OPERATIONAL IMPROVEMENTS | EL PASO | 2019-06-05 | $1,210,616.65 | $1,033,028.05 |
| Rank 4of 5 | IMPROVE GUARDRAIL, SAFETY TREAT FIXED OBJECTS | BASTROP | 2019-06-05 | $746,255.00 | $628,355.12 |
| Rank 3of 5 | BRIDGE MAINTENANCE | REEVES | 2019-06-04 | $450,498.00 | $415,240.00 |
| Rank 3of 5 | INSTALL LED FLASHING CHEVRON | HUDSPETH | 2019-05-08 | $1,361,375.75 | $1,232,441.25 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.