Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
417 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 8of 9 | PEDESTRIAN TRAIL- SIDEWALKS | LLANO | 2017-09-07 | $1,397,689.71 | $1,011,049.85 |
| Rank 11of 12 | REHABILITATE EXISTING ROAD | MILAM | 2017-09-07 | $2,299,462.20 | $1,428,673.97 |
| Rank 3of 3 | STRUCTURE IMPROVEMENTS | MATAGORDA | 2017-09-07 | $972,760.00 | $827,505.00 |
| Rank 2of 4 | NEW TWO-LANE TWIN BRIDGE STRUCTURE | PRESIDIO | 2017-08-09 | $7,310,837.30 | $6,854,362.50 |
| Low bidof 6 | INSTALL MEDIAN BARRIER | LEE | 2017-08-09 | $1,336,982.72 | $1,336,982.72 |
| Low bidof 5 | WIDEN BY ADDING TWO INSIDE LANES, ETC. | EL PASO | 2017-08-08 | $33,676,148.91 | $33,676,148.91 |
| Rank 2of 4 | RAMP IMPROVEMENTS | EL PASO | 2017-08-08 | $19,582,007.77 | $16,837,592.06 |
| Rank 5of 8 | WIDEN ROADWAY TO PROVIDE PASSING LANES | ATASCOSA | 2017-08-08 | $3,249,665.49 | $2,924,983.58 |
| Low bidof 2 | CHANNELIZATION(STRIPING) | TRAVIS | 2017-08-08 | $355,908.71 | $355,908.71 |
| Low bidof 4 | INTERCHANGE IMPROVEMENTS | EL PASO | 2017-07-12 | $25,376,264.25 | $25,376,264.25 |
| Low bidof 5 | INSTALL MEDIAN BARRIER | CULBERSON | 2017-07-12 | $957,145.00 | $957,145.00 |
| Rank 6of 8 | REPLACE BRIDGE AND APPROACHES | TRAVIS | 2017-07-12 | $452,931.78 | $377,671.08 |
| Rank 9of 10 | CONSTRUCT CURB RAMPS_(VARIOUS LOC IN BEXAR CO) | BEXAR | 2017-07-12 | $5,252,910.42 | $3,495,290.12 |
| Rank 10of 10 | REPLACE BRIDGE & APPROACHES | MEDINA | 2017-07-12 | $629,523.10 | $422,407.29 |
| Rank 2of 9 | CHANNEL IMPROVEMENTS | HUDSPETH | 2017-07-12 | $606,825.00 | $603,661.00 |
| Low bidof 3 | REPLACE BRIDGES AND APPROACHES | EL PASO | 2017-07-11 | $2,025,296.00 | $2,025,296.00 |
| Low bidof 6 | REHAB PAVEMENT, ADD SHOULDERS & SAFETY TREAT | WILLIAMSON | 2017-06-07 | $3,320,330.51 | $3,320,330.51 |
| Rank 3of 7 | INTERSECTION OPERATIONAL IMPROVEMENTS | BEXAR | 2017-06-07 | $8,333,969.63 | $8,000,083.18 |
| Rank 2of 2 | SPALL AND FULL DEPTH REPAIR | EL PASO | 2017-06-07 | $1,073,825.00 | $596,949.30 |
| Rank 3of 3 | MISC. CONCRETE REPAIR | EL PASO | 2017-06-06 | $1,629,530.00 | $1,311,766.43 |
| Rank 3of 7 | INSTALL CONCRETE RIPRAP AND GABIONS | BEXAR | 2017-05-24 | $299,148.00 | $260,354.32 |
| Rank 4of 5 | TRAMWAY PARK REHABILITATION | EL PASO | 2017-04-20 | $207,688.01 | $178,717.70 |
| Rank 3of 11 | BRIDGE PREVENTIVE MAINTENANCE | GUADALUPE | 2017-04-12 | $320,403.20 | $270,769.97 |
| Low bidof 10 | CONSTRUCT 2 LANE ROADWAY ON NEW LOCATION | BEXAR | 2017-04-05 | $3,419,684.60 | $3,419,684.60 |
| Rank 4of 8 | SAFETY TREAT FIXED OBJECTS | CALDWELL | 2017-04-05 | $1,410,141.50 | $986,625.98 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.