Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
417 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 6 | MODERNIZE BRIDGE RAIL/APR GUARDRAIL, ETC. | CULBERSON | 2017-04-05 | $3,901,386.10 | $3,783,684.49 |
| Rank 7of 12 | REHAB RDWY | WILLIAMSON | 2017-04-05 | $5,361,321.74 | $4,076,992.45 |
| Rank 2of 2 | ROADWAY SPALL & FULL DEPTH REPAIR | EL PASO | 2017-04-05 | $653,650.00 | $450,425.09 |
| Rank 4of 6 | REPAIR BEAMS AND REPLACE BENT CAPS | REEVES | 2017-04-04 | $1,187,640.00 | $936,605.40 |
| Rank 5of 9 | EXPAND 2 TO 4 LNS W/ LTL, SW, BK LN & EXTEND RDWY | BEXAR | 2017-03-08 | $8,325,943.87 | $7,388,905.60 |
| Rank 2of 5 | BRIDGE REPLACEMENT | REEVES | 2017-03-08 | $4,575,461.00 | $4,518,994.33 |
| Rank 4of 14 | CONC STRUCTURE REPAIR AND BRIDGE JOINTS | PECOS | 2017-03-08 | $411,250.00 | $318,869.50 |
| Rank 6of 12 | REPLACE EXIST BRIDGE, CONSTRUCT NEW TURNAROUNDS | COMAL | 2017-03-07 | $7,784,375.28 | $7,256,065.09 |
| Rank 3of 6 | UPGRADE BRIDGE AND APPROACH RAILING | TRAVIS | 2017-03-07 | $225,000.00 | $213,085.50 |
| Rank 3of 5 | BPM | JEFF DAVIS | 2017-02-03 | $887,727.00 | $739,781.00 |
| Low bidof 10 | REPLACE EXISTING CULVERT WITH BRIDGE | BEXAR | 2017-01-05 | $1,447,520.48 | $1,447,520.48 |
| Rank 5of 7 | INSTALL MEDIAN BARRIER | LIVE OAK | 2017-01-04 | $946,272.50 | $728,162.74 |
| Low bidof 6 | ROADWAY REHABILITATION | BREWSTER | 2017-01-04 | $4,010,557.70 | $4,010,557.70 |
| Rank 3of 8 | CONSTRUCT PEDESTRIAN BRIDGE OVER US 90 | BEXAR | 2017-01-04 | $2,503,646.54 | $2,331,043.05 |
| Rank 5of 9 | REHAB ROADWAY & ADD TWLTL & SHOULDERS | TRAVIS | 2017-01-04 | $7,969,692.05 | $6,648,303.62 |
| Rank 4of 7 | BRIDGE REPLACEMENT | REEVES | 2016-12-01 | $5,041,907.40 | $3,793,865.00 |
| Rank 2of 6 | REHAB EXISTING ROAD | PRESIDIO | 2016-11-03 | $1,292,453.00 | $1,271,914.40 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.