Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
1,626 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 3 | HOT MIX | FALLS | 2022-08-30 | $306,210.00 | $283,160.00 |
| Rank 2of 2 | HOT-MIX COLD-LAID | BROWN | 2022-08-30 | $266,587.50 | $240,000.00 |
| Low bidof 2 | HOT MIX | SABINE | 2022-08-23 | $205,980.00 | $205,980.00 |
| Rank 3of 4 | HOT MIX | DEWITT | 2022-08-23 | $336,875.00 | $294,000.00 |
| Low bidof 1 | HOT-MIX COLD-LAID | JEFFERSON | 2022-08-09 | $152,250.00 | $152,250.00 |
| Rank 2of 2 | ASPHALTIC PATCHING MATERIAL | JEFFERSON | 2022-08-09 | $24,150.00 | $21,701.50 |
| Low bidof 4 | BASE REPAIR, OCST, 1.5" HMA LEVEL-UP AND 1.5" HMA | MONTGOMERY | 2022-08-04 | $10,866,955.64 | $10,866,955.64 |
| Rank 2of 3 | SURFACING/ROADWAY RESTORATION | JEFFERSON | 2022-08-04 | $11,214,278.15 | $10,175,549.20 |
| Rank 2of 5 | WIDEN ROAD - ADD LANES | BRAZOS | 2022-08-04 | $5,977,563.12 | $5,909,647.30 |
| Rank 4of 8 | WIDEN ROAD - ADD LANES AND SHOULDERS | HAYS | 2022-08-04 | $3,641,105.46 | $3,199,566.89 |
| Low bidof 1 | HAZARD ELIMINATION & SAFETY | BELL | 2022-08-04 | $709,467.86 | $709,467.86 |
| Rank 5of 9 | CONSTRUCT FRONTAGE ROADS | WALLER | 2022-08-04 | $11,923,617.12 | $10,998,208.70 |
| Rank 3of 3 | SURFACING/ROADWAY RESTORATION | WALLER | 2022-08-04 | $13,218,317.09 | $13,133,459.07 |
| Low bidof 2 | ACP OVERLAY | ORANGE | 2022-08-04 | $1,387,550.10 | $1,387,550.10 |
| Rank 5of 7 | WIDEN ROAD - ADD LANES | HAYS | 2022-08-03 | $5,507,960.80 | $5,093,342.85 |
| Rank 2of 4 | HAZARD ELIMINATION & SAFETY | JOHNSON | 2022-08-03 | $5,154,584.78 | $4,410,629.30 |
| Rank 3of 3 | RESURFACE ROADWAY | BEE | 2022-08-03 | $11,076,909.13 | $9,794,885.95 |
| Low bidof 3 | SURFACING/ROADWAY RESTORATION | HARRIS | 2022-08-03 | $3,261,336.96 | $3,261,336.96 |
| Rank 3of 4 | PREVENTIVE MAINTENANCE | LAMPASAS | 2022-08-03 | $7,704,891.35 | $6,287,281.00 |
| Rank 2of 4 | HAZARD ELIMINATION & SAFETY | LIBERTY | 2022-08-03 | $1,976,787.66 | $1,615,491.38 |
| Rank 4of 4 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T | SMITH | 2022-08-03 | $2,617,266.84 | $2,208,247.24 |
| Low bidof 1 | HOT MIX | JEFFERSON | 2022-08-03 | $2,560,250.00 | $2,560,250.00 |
| Low bidof 1 | HOT MIX | JASPER | 2022-08-03 | $2,934,900.00 | $2,934,900.00 |
| Low bidof 1 | HOT MIX | LIBERTY | 2022-08-03 | $2,976,725.00 | $2,976,725.00 |
| Rank 3of 6 | HOT-MIX COLD-LAID | BEXAR | 2022-07-21 | $320,150.00 | $281,834.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.