Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
1,626 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 3 | HOT MIX | MEDINA | 2022-07-21 | $324,150.00 | $324,150.00 |
| Low bidof 1 | HOT MIX | MILAM | 2022-07-12 | $243,970.00 | $243,970.00 |
| Rank 3of 7 | WIDEN ROAD - ADD LANES | ATASCOSA | 2022-06-30 | $7,369,878.66 | $6,628,642.00 |
| Rank 2of 4 | REHABILITATE EXISTING ROADWAY | COLLIN | 2022-06-30 | $6,339,605.68 | $6,227,270.73 |
| Rank 4of 6 | BRIDGE REPLACEMENT | LAVACA | 2022-06-30 | $5,989,361.15 | $4,643,080.76 |
| Rank 2of 2 | HAZARD ELIMINATION & SAFETY | BRAZOS | 2022-06-30 | $2,441,244.25 | $1,790,660.92 |
| Low bidof 2 | BRIDGE REPLACEMENT | TYLER | 2022-06-30 | $746,699.95 | $746,699.95 |
| Low bidof 4 | SURFACING/ROADWAY RESTORATION | MONTGOMERY | 2022-06-30 | $4,740,080.60 | $4,740,080.60 |
| Rank 7of 8 | CONSTRUCT FRONTAGE ROADS | MONTGOMERY | 2022-06-29 | $8,863,320.10 | $7,473,853.32 |
| Rank 5of 5 | BRIDGE REPLACEMENT | WHARTON | 2022-06-29 | $7,037,843.68 | $5,657,394.78 |
| Low bidof 3 | CONSTRUCT RAMPS | DENTON | 2022-06-29 | $2,796,046.88 | $2,796,046.88 |
| Rank 2of 3 | BRIDGE REPLACEMENT | HARDIN | 2022-06-29 | $994,676.50 | $937,938.80 |
| Rank 3of 3 | BRIDGE REPLACEMENT | TYLER | 2022-06-29 | $928,275.80 | $659,766.00 |
| Rank 5of 5 | TRANSPORTATION NON-ROADWAY | LIVE OAK | 2022-06-29 | $1,614,867.35 | $1,030,452.14 |
| Rank 3of 3 | MILL AND INLAY | BRAZOS | 2022-06-29 | $1,697,912.77 | $1,289,907.65 |
| Rank 3of 4 | ASPHALT PAVEMENT REPAIR | GRIMES | 2022-06-29 | $1,784,826.48 | $1,743,869.29 |
| Rank 5of 5 | HOT-MIX COLD-LAID | VICTORIA | 2022-06-27 | $510,000.00 | $353,600.00 |
| Low bidof 3 | FLEXIBLE BASE | CHAMBERS | 2022-06-07 | $30,000.00 | $30,000.00 |
| Low bidof 2 | HOT-MIX COLD-LAID ASPH CONC PAV (MATERIALS ONLY) | COMANCHE | 2022-06-07 | $237,640.00 | $237,640.00 |
| Rank 3of 3 | HOT MIX | COLORADO | 2022-06-03 | $425,500.00 | $347,800.00 |
| Rank 2of 3 | BASE FAILURE PAVEMENT REPAIR | FALLS | 2022-05-05 | $1,082,037.69 | $1,065,443.70 |
| Rank 2of 3 | BASE FAILURE PAVEMENT REPAIR | LIMESTONE | 2022-05-05 | $1,074,347.34 | $896,110.25 |
| Rank 3of 4 | MILL AND INLAY | WALKER | 2022-05-04 | $2,291,072.00 | $1,656,940.00 |
| Rank 3of 3 | SPOT BASE REPAIR | BRAZOS | 2022-05-04 | $1,260,930.00 | $898,531.50 |
| Rank 3of 4 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | KAUFMAN | 2022-05-04 | $2,611,793.78 | $2,194,801.02 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.