Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
1,626 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 4 | DENSE GRADED HOT MIX | WISE | 2022-05-04 | $1,120,500.00 | $984,675.00 |
| Rank 3of 3 | BASE FAILURE PAVEMENT REPAIR | MCLENNAN | 2022-05-04 | $1,410,976.43 | $991,978.75 |
| Rank 3of 4 | BASE FAILURE PAVEMENT REPAIR | HILL | 2022-05-04 | $1,060,748.89 | $889,845.10 |
| Rank 5of 5 | HOT MIX | FAYETTE | 2022-04-26 | $444,000.00 | $296,000.00 |
| Low bidof 3 | HOT MIX | MEDINA | 2022-04-20 | $252,000.00 | $252,000.00 |
| Rank 2of 5 | HOT-MIX COLD-LAID | KARNES | 2022-04-19 | $279,500.00 | $270,000.00 |
| Rank 2of 5 | HOT-MIX COLD-LAID | LIVE OAK | 2022-04-19 | $312,000.00 | $309,000.00 |
| Low bidof 2 | SEAL COAT | LIMESTONE | 2022-04-12 | $425,408.40 | $425,408.40 |
| Rank 2of 3 | ASPHALT | GALVESTON | 2022-04-12 | $416,643.00 | $386,662.20 |
| Low bidof 2 | FLEXIBLE BASE MATERIAL | HARRIS | 2022-04-12 | $52,000.00 | $52,000.00 |
| Low bidof 2 | HOT-MIX COLD-LAID | TYLER | 2022-04-12 | $66,241.00 | $66,241.00 |
| Rank 2of 3 | MILL, TOM INLAY, AND FULL DEPTH RECONSTRUCTION | TRAVIS | 2022-04-07 | $1,479,180.09 | $1,011,169.04 |
| Rank 3of 3 | MILL AND INLAY, BONDING COURSE, FDR, AND TOM | WILLIAMSON | 2022-04-07 | $7,726,905.80 | $7,085,848.79 |
| Low bidof 2 | HOT-MIX AND ASB | FORT BEND | 2022-04-07 | $569,840.00 | $569,840.00 |
| Rank 2of 2 | DENSE GRADED HOT MIX | HUNT | 2022-04-06 | $642,000.00 | $587,125.00 |
| Rank 2of 4 | ASPHALT | GRIMES | 2022-04-05 | $200,500.00 | $200,000.00 |
| Low bidof 2 | HOT MIX | SABINE | 2022-03-29 | $264,727.50 | $264,727.50 |
| Rank 2of 5 | HOT-MIX COLD-LAID | BEXAR | 2022-03-17 | $283,010.00 | $272,400.00 |
| Low bidof 5 | DENSE GRADED HOT MIX | COMAL | 2022-03-17 | $279,025.00 | $279,025.00 |
| Low bidof 1 | HOT MIX | HAMILTON | 2022-03-15 | $392,732.50 | $392,732.50 |
| Rank 3of 3 | HOT MIX | MCLENNAN | 2022-03-15 | $350,212.50 | $318,250.00 |
| Rank 3of 3 | HOT MIX | BELL | 2022-03-15 | $371,312.50 | $328,375.00 |
| Rank 3of 6 | BASE REPAIR, PLANING, SEAL COAT, 1.5" PFC OL | WALLER | 2022-03-04 | $3,673,910.17 | $3,607,335.29 |
| Rank 3of 3 | SURFACING/ROADWAY RESTORATION | FORT BEND | 2022-03-04 | $2,274,795.68 | $2,089,681.98 |
| Rank 2of 2 | BRIDGE REPLACEMENT | HARDIN | 2022-03-04 | $980,168.00 | $935,311.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.