Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
1,626 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 7of 7 | SEAL COAT | CALDWELL | 2021-02-05 | $4,914,738.83 | $4,094,875.13 |
| Rank 5of 6 | LEVEL UP, FDR, & OVERLAY | HAYS | 2021-02-05 | $2,397,193.79 | $2,276,991.23 |
| Rank 7of 10 | RESTORE EXSISTING PAVEMT, ADD SHOULDERS | COLLIN | 2021-02-05 | $8,061,973.29 | $5,929,503.18 |
| Rank 2of 5 | MILL & IN-LAY | JASPER | 2021-02-05 | $587,224.98 | $577,252.35 |
| Rank 3of 7 | RAMP MODIFICATIONS, BRIDGE & PAVEMENT REPAIRS | LEON | 2021-02-04 | $1,801,661.59 | $1,382,171.20 |
| Rank 2of 8 | RESURFACE ROADWAY | TARRANT | 2021-02-04 | $1,281,865.56 | $1,193,706.58 |
| Rank 4of 6 | HAZARD ELIMINATION & SAFETY | KAUFMAN | 2021-02-04 | $1,697,841.96 | $1,399,629.03 |
| Low bidof 3 | SURFACING/ROADWAY RESTORATION | NEWTON | 2021-02-04 | $1,498,772.65 | $1,498,772.65 |
| Rank 2of 5 | RESURFACE ROADWAY | WILLIAMSON | 2021-02-04 | $1,068,894.85 | $976,594.31 |
| Rank 6of 6 | WIDEN ROAD - ADD SHOULDERS | WOOD | 2021-02-04 | $2,892,745.25 | $899,810.96 |
| Low bidof 2 | HOT MIX_(MATERIAL ONLY) | HARDIN | 2021-02-04 | $763,250.00 | $763,250.00 |
| Rank 5of 5 | BASE REPAIR MILL-OVERLAY | LIBERTY | 2021-02-04 | $601,019.51 | $573,577.25 |
| Low bidof 4 | ASPHALTIC PATCHING MATERIAL ONLY | JASPER | 2021-01-13 | $92,600.00 | $92,600.00 |
| Rank 2of 4 | ASPHALTIC PATCHING MATERIAL ONLY | JEFFERSON | 2021-01-13 | $27,688.00 | $24,006.74 |
| Rank 2of 4 | ASPHALTIC PATCHING MATERIAL ONLY | LIBERTY | 2021-01-13 | $19,136.00 | $15,267.76 |
| Rank 2of 3 | FLEXIBLE BASE MATERIAL ONLY | JEFFERSON | 2021-01-13 | $24,500.00 | $22,050.00 |
| Low bidof 2 | FLEXIBLE BASE MATERIAL ONLY | LIBERTY | 2021-01-13 | $54,000.00 | $54,000.00 |
| Rank 5of 7 | FULL DEPTH REPAIR, LEVEL-UP & TOM | LEE | 2021-01-08 | $3,365,195.67 | $2,887,592.71 |
| Rank 6of 6 | PAVEMENT REPAIR AND OVERLAY | MONTAGUE | 2021-01-08 | $2,058,143.86 | $1,628,157.52 |
| Rank 4of 8 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | JOHNSON | 2021-01-08 | $957,818.00 | $879,001.77 |
| Rank 6of 9 | FLEXIBLE PAVEMENT REPAIR | WISE | 2021-01-08 | $2,379,015.18 | $1,985,755.38 |
| Rank 5of 5 | MILL AND OVERLAY | CLAY | 2021-01-07 | $3,176,926.12 | $2,554,472.70 |
| Rank 5of 5 | SURFACING ROADWAY RESTORATION | TYLER | 2021-01-07 | $4,415,967.56 | $3,877,452.10 |
| Low bidof 7 | REHABILITATE EXISTING ROADWAY | BASTROP | 2021-01-07 | $1,022,332.81 | $1,022,332.81 |
| Low bidof 4 | MILL AND OVERLAY | TYLER | 2021-01-07 | $387,405.92 | $387,405.92 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.