Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
1,626 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 3 | SUPERPAVE MIXTURES (MATERIAL ONLY) | KAUFMAN | 2020-12-09 | $242,000.00 | $242,000.00 |
| Low bidof 1 | HOT MIX COLD LAY MATERIALS ONLY | HENDERSON | 2020-12-08 | $194,250.00 | $194,250.00 |
| Rank 2of 2 | HOT MIX COLD LAY MATERIALS ONLY | SMITH | 2020-12-08 | $381,000.00 | $337,000.00 |
| Low bidof 6 | RECONSTRUCT EXISTING ROADWAY & LANDSCAPE WORK | MCCULLOCH | 2020-12-03 | $7,056,081.05 | $7,056,081.05 |
| Rank 4of 5 | FRONTAGE OVERLAYS | TRAVIS | 2020-12-03 | $3,625,621.79 | $3,389,908.66 |
| Rank 2of 3 | OVERLAY | NEWTON | 2020-12-03 | $380,850.79 | $337,381.76 |
| Rank 2of 3 | OVERLAY ROADWAY | HARDIN | 2020-12-03 | $926,403.00 | $893,784.70 |
| Low bidof 2 | OVERLAY | JEFFERSON | 2020-12-03 | $797,913.14 | $797,913.14 |
| Low bidof 10 | REHABILITATE EXISTING ROADWAY AND ADD SHOULDERS | DENTON | 2020-12-02 | $6,587,193.41 | $6,587,193.41 |
| Rank 5of 6 | OVERLAY | BLANCO | 2020-12-02 | $3,227,765.83 | $2,768,423.25 |
| Rank 3of 3 | DENSE GRADE HOT MIX - MATERIALS ONLY | GRAYSON | 2020-12-02 | $751,000.00 | $578,000.00 |
| Rank 2of 5 | HOT-MIX COLD-LAID ASPHALT CONC (MATERIAL ONLY) | BROWN | 2020-11-19 | $54,087.50 | $48,962.50 |
| Rank 2of 3 | HOT-MIX COLD-LAID ASPHALT PAV (MATERIAL ONLY) | COMANCHE | 2020-11-19 | $133,840.00 | $114,890.00 |
| Rank 2of 5 | HOT-MIX COLD-LAID ASPHALT CONC (MATERIAL ONLY) | LAMPASAS | 2020-11-19 | $48,000.00 | $44,125.00 |
| Rank 5of 5 | RIPRAP/SCOUR/MISC BRIDGE REPAIR | ORANGE | 2020-11-17 | $207,229.50 | $110,744.00 |
| Rank 7of 7 | FULL DEPTH REPAIR, LEVEL-UP & TOM | LEE | 2020-11-05 | $4,415,367.46 | $3,551,104.16 |
| Rank 2of 5 | REHABILITATION OF EXISTING ROAD | HILL | 2020-11-05 | $1,076,845.56 | $1,051,927.65 |
| Rank 6of 8 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | TARRANT | 2020-11-05 | $4,751,122.00 | $3,972,278.79 |
| Rank 4of 5 | BASE REPAIR & OVERLAY | CHAMBERS | 2020-11-05 | $312,466.75 | $235,487.35 |
| Rank 3of 3 | OVERLAY | NEWTON | 2020-11-05 | $949,237.24 | $878,620.85 |
| Rank 2of 2 | HOT MIX - MATERIAL ONLY | HAMILTON | 2020-11-05 | $658,450.00 | $591,000.00 |
| Rank 3of 3 | HOT MIX - MATERIAL ONLY | CORYELL | 2020-11-05 | $623,500.00 | $555,000.00 |
| Rank 3of 3 | HOT MIX - MATERIAL ONLY | MCLENNAN | 2020-11-05 | $1,387,450.00 | $1,187,500.00 |
| Rank 3of 4 | RESTORE EXIST PAV, ADD SHLDR, BASE REPAIR AND OV | COLLIN | 2020-11-04 | $12,439,438.23 | $9,596,783.18 |
| Rank 6of 6 | OVERLAY | BURNET | 2020-11-04 | $2,753,436.31 | $2,046,868.15 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.