Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
1,626 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 5 | MATERIAL ONLY DELIVERY OF HMA | BEXAR | 2020-04-14 | $273,850.00 | $270,600.00 |
| Rank 3of 3 | DENSE-GRADED HOT-MIX ASPHALT(MATERIAL ONLY) | FREESTONE | 2020-04-14 | $270,245.00 | $232,500.00 |
| Rank 3of 3 | DENSE-GRADED HOT-MIX ASPHALT(MATERIAL ONLY) | MILAM | 2020-04-14 | $264,560.00 | $234,000.00 |
| Low bidof 2 | TBPFC SURF, ACP SURF, PLANING, SHLDR TEXT, PV MK | SMITH | 2020-04-09 | $3,079,236.01 | $3,079,236.01 |
| Rank 2of 6 | OV- OVERLAY | TYLER | 2020-04-09 | $7,599,977.41 | $7,554,649.35 |
| Rank 3of 3 | COLD MIX - MATERAL ONLY | BELL | 2020-04-09 | $762,150.00 | $631,470.00 |
| Rank 3of 3 | HOT MIX - MATERIAL ONLY | BOSQUE | 2020-04-09 | $868,580.00 | $800,750.00 |
| Rank 2of 2 | HOT MIX - MATERIAL ONLY | HAMILTON | 2020-04-09 | $1,025,465.00 | $916,653.00 |
| Rank 4of 4 | HOT MIX - MATERIAL ONLY | BELL | 2020-04-09 | $2,556,420.00 | $2,275,500.00 |
| Rank 3of 3 | HOT MIX - MATERIAL ONLY | CORYELL | 2020-04-09 | $593,816.00 | $519,000.00 |
| Rank 4of 4 | RESURFACE ROADWAY | TARRANT | 2020-04-08 | $3,950,822.55 | $3,418,266.67 |
| Rank 3of 3 | REPAIR AND RESURFACE ROADWAY | SMITH | 2020-04-08 | $2,109,470.38 | $2,060,599.80 |
| Low bidof 4 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | KAUFMAN | 2020-04-08 | $3,633,670.00 | $3,633,670.00 |
| Rank 3of 5 | HOT-MIX COLD-LAID (MATERIAL ONLY) | DEWITT | 2020-03-25 | $311,850.00 | $289,800.00 |
| Rank 2of 5 | HOT-MIX COLD-LAID (MATERIAL ONLY) | GONZALES | 2020-03-25 | $308,250.00 | $292,500.00 |
| Rank 2of 5 | HOT-MIX COLD-LAID (MATERIAL ONLY) | FAYETTE | 2020-03-25 | $294,800.00 | $286,000.00 |
| Rank 7of 7 | PAVEMENT REPAIR AND OVERLAY | CLAY | 2020-03-05 | $2,514,072.97 | $1,945,126.66 |
| Rank 4of 4 | REPAIR & RESURFACE ROADWAY | WOOD | 2020-03-05 | $5,480,667.96 | $4,511,805.59 |
| Rank 4of 6 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | MONTAGUE | 2020-03-05 | $3,831,999.95 | $3,163,722.22 |
| Rank 3of 5 | RESURFACE ROADWAY | TARRANT | 2020-03-05 | $2,871,620.12 | $2,691,548.85 |
| Rank 5of 6 | BRIDGE REPLACEMENT | TYLER | 2020-03-05 | $889,392.50 | $783,916.45 |
| Low bidof 3 | OV - OVERLAY | JEFFERSON | 2020-03-05 | $6,712,910.47 | $6,712,910.47 |
| Low bidof 2 | MILL & OVERLAY, PAVEMENT REPAIR AND MARKINGS | DENTON | 2020-03-05 | $5,910,402.34 | $5,910,402.34 |
| Rank 3of 4 | ASPHALTIC PAVEMENT REPAIRS | TRAVIS | 2020-03-05 | $4,367,860.00 | $3,486,391.00 |
| Rank 4of 4 | MILL AND INLAY | WILLIAMSON | 2020-03-05 | $949,920.65 | $770,514.50 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.