Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
1,626 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 3 | BRIDGE REPLACEMENT | TYLER | 2020-03-04 | $2,224,209.50 | $1,955,026.71 |
| Rank 2of 3 | HOT MIX-MATERIAL ONLY | FALLS | 2020-03-04 | $1,116,100.00 | $1,108,250.00 |
| Low bidof 3 | HOT MIX-MATERIAL ONLY | HILL | 2020-03-04 | $1,393,832.50 | $1,393,832.50 |
| Low bidof 3 | HOT MIX-MATERIAL ONLY | LIMESTONE | 2020-03-04 | $2,010,250.00 | $2,010,250.00 |
| Low bidof 3 | HOT MIX-MATERIAL ONLY | MCLENNAN | 2020-03-04 | $2,635,350.00 | $2,635,350.00 |
| Rank 3of 5 | REHAB & WIDEN ROADWAY | HAMILTON | 2020-02-07 | $6,400,666.78 | $5,387,759.04 |
| Rank 3of 3 | RESURFACE ROADWAY | ERATH | 2020-02-07 | $3,758,251.94 | $3,111,771.94 |
| Rank 4of 5 | OV-OVERLAY | LIBERTY | 2020-02-07 | $3,527,066.96 | $2,133,678.32 |
| Rank 6of 8 | OVERLAY | GILLESPIE | 2020-02-07 | $3,271,726.07 | $2,725,725.31 |
| Rank 3of 5 | PLANING, PVT REPAIR, OCST, ACP, MBGF & PV MK | ANDERSON | 2020-02-07 | $1,760,214.53 | $1,534,652.75 |
| Rank 2of 6 | INSTALL TWO-WAY LEFT TURN LANE | MILAM | 2020-02-07 | $402,599.20 | $376,466.30 |
| Rank 2of 3 | OV-OVERLAY | CHAMBERS | 2020-02-07 | $2,883,278.36 | $2,844,750.22 |
| Low bidof 6 | STABILIZE BANK OF TRINITY RIVER | LIBERTY | 2020-02-07 | $15,552,095.94 | $15,552,095.94 |
| Low bidof 5 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | JOHNSON | 2020-02-07 | $750,411.40 | $750,411.40 |
| Rank 2of 7 | PREVENTIVE MAINTENANCE | JOHNSON | 2020-02-06 | $9,559,752.51 | $9,368,281.51 |
| Rank 3of 4 | ASPHALTIC CONCRETE OVERLAY | CORYELL | 2020-02-06 | $3,188,713.12 | $2,987,724.20 |
| Rank 2of 3 | RESURFACE ROADWAY | WISE | 2020-02-06 | $1,061,308.00 | $1,052,231.59 |
| Rank 4of 4 | MILL, SEAL & THIN OV FRONTAGE ROADS | TRAVIS | 2020-02-06 | $2,768,363.20 | $1,998,095.87 |
| Rank 6of 6 | LEVEL UP, FDR AND OVERLAY | TRAVIS | 2020-02-06 | $1,272,045.41 | $931,784.13 |
| Rank 4of 4 | OVERLAY | TRAVIS | 2020-02-06 | $2,134,706.40 | $1,367,723.80 |
| Rank 2of 6 | OVERLAY | BASTROP | 2020-02-06 | $2,836,374.24 | $2,787,166.88 |
| Rank 5of 6 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | CLAY | 2020-02-06 | $4,938,029.52 | $4,202,296.72 |
| Rank 6of 7 | FULL DEPTH REPAIR AND SEAL COAT | CALDWELL | 2020-02-06 | $1,997,931.76 | $1,550,816.64 |
| Low bidof 5 | MILL & INLAY (CALL-OUT) | BROWN | 2020-02-06 | $1,576,676.90 | $1,576,676.90 |
| Rank 2of 4 | MILL & OVERLAY | HARDIN | 2020-01-10 | $1,445,330.60 | $1,306,780.29 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.