Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
1,626 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 6of 6 | BASE REPAIR, MILL, OVERLAY | DENTON | 2019-10-03 | $2,039,691.08 | $1,435,083.86 |
| Rank 4of 8 | PAVEMENT REPAIR | GUADALUPE | 2019-10-03 | $2,645,847.75 | $2,304,494.47 |
| Rank 4of 4 | OVERLAY | WILLIAMSON | 2019-10-02 | $7,221,843.68 | $5,739,917.20 |
| Rank 6of 6 | FULL DEPTH CONCRETE REPAIR | DENTON | 2019-10-02 | $2,328,358.19 | $1,486,329.30 |
| Rank 4of 4 | FULL DEPTH FLEXIBLE PAVEMENT REP | CHAMBERS | 2019-10-02 | $1,156,534.00 | $641,296.00 |
| Rank 3of 6 | PAVEMENT REPAIR | BEXAR | 2019-10-02 | $3,747,314.25 | $3,393,669.30 |
| Rank 3of 5 | SEAL COAT | BASTROP | 2019-09-06 | $3,073,970.79 | $2,735,017.09 |
| Low bidof 3 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | HARDIN | 2019-09-06 | $607,253.30 | $607,253.30 |
| Low bidof 2 | MILL & OVERLAY | TYLER | 2019-09-06 | $921,180.09 | $921,180.09 |
| Rank 4of 4 | BRIDGE REPLACEMENT | LIBERTY | 2019-09-05 | $2,978,082.32 | $1,811,809.50 |
| Low bidof 4 | GR, BS, DR, PAV | JOHNSON | 2019-08-07 | $4,345,364.38 | $4,345,364.38 |
| Rank 2of 3 | MILL/OVLY | BELL | 2019-08-07 | $3,465,480.40 | $3,284,016.20 |
| Rank 3of 3 | RESURFACE ROADWAY | TARRANT | 2019-08-07 | $1,564,161.25 | $1,243,381.45 |
| Rank 2of 4 | BRIDGE MAINTENANCE | JEFFERSON | 2019-08-07 | $144,687.00 | $113,770.00 |
| Rank 4of 4 | RESURFACE ROADWAY | TARRANT | 2019-08-07 | $4,599,628.32 | $3,540,605.35 |
| Rank 2of 5 | BASE FAILURE PAYMENT REPAIR | BELL | 2019-08-07 | $1,334,956.77 | $1,314,218.90 |
| Rank 2of 4 | BASE FAILURE PAVEMENT REPAIR | CORYELL | 2019-08-07 | $555,081.29 | $512,219.15 |
| Rank 2of 4 | BASE FAILURE PAVEMENT REPAIR | HAMILTON | 2019-08-07 | $978,887.00 | $879,594.00 |
| Rank 3of 3 | BASE FAILURE PAVEMENT REPAIR | HILL | 2019-08-07 | $1,484,322.67 | $1,425,925.50 |
| Rank 2of 3 | CONSTRUCT FRONTAGE ROADS | JOHNSON | 2019-08-06 | $2,072,185.93 | $1,990,741.76 |
| Low bidof 2 | ADD TURN LANES | BELL | 2019-08-06 | $3,063,791.61 | $3,063,791.61 |
| Rank 5of 5 | PREVENTATIVE MAINTENANCE | TARRANT | 2019-08-06 | $8,171,886.03 | $6,436,651.58 |
| Rank 2of 4 | FLEXIBLE PAVEMENT REPAIR | PALO PINTO | 2019-08-06 | $1,481,260.00 | $977,100.45 |
| Rank 3of 4 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | JOHNSON | 2019-08-06 | $4,129,617.41 | $3,662,171.00 |
| Low bidof 2 | MILL & INLAY | JASPER | 2019-07-10 | $798,730.00 | $798,730.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.