Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
1,626 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 4 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | DALLAS | 2019-07-10 | $452,843.08 | $422,344.00 |
| Rank 3of 4 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | DALLAS | 2019-07-10 | $596,812.62 | $511,923.25 |
| Rank 3of 4 | BASE FAILURE PAVEMENT REPAIR | BOSQUE | 2019-07-10 | $822,601.90 | $790,262.72 |
| Rank 2of 4 | BASE FAILURE PAVEMENT REPAIR | FALLS | 2019-07-10 | $589,561.32 | $507,127.80 |
| Low bidof 4 | BASE FAILURE PAVEMENT REPAIR | LIMESTONE | 2019-07-10 | $212,367.00 | $212,367.00 |
| Low bidof 2 | SEAL COAT AND PAVEMENT RERAIRS | LIMESTONE | 2019-07-10 | $297,981.10 | $297,981.10 |
| Low bidof 3 | BASE FAILURE PAVEMENT REPAIR | MCLENNAN | 2019-07-10 | $1,041,147.35 | $1,041,147.35 |
| Rank 2of 4 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | DALLAS | 2019-07-09 | $1,301,105.50 | $1,255,241.50 |
| Rank 3of 4 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | DALLAS | 2019-07-09 | $1,234,726.45 | $989,553.05 |
| Rank 3of 5 | MILL, FDR AND ACP OVERLAY ON FRONTAGE ROADS | DALLAS | 2019-06-05 | $3,515,256.67 | $3,063,097.80 |
| Rank 2of 2 | GR, BS, DR, PAV | TARRANT | 2019-06-05 | $1,678,417.65 | $1,477,579.91 |
| Low bidof 2 | PROVIDE ADD'L PAVED SURFACE WID, ADD RUMBLE STRIPS | BELL | 2019-06-05 | $2,672,893.94 | $2,672,893.94 |
| Rank 3of 3 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | NAVARRO | 2019-06-05 | $3,737,334.65 | $1,923,118.61 |
| Rank 4of 4 | WDN, BS, STR, SURF | BELL | 2019-06-04 | $53,636,864.03 | $44,733,665.56 |
| Rank 3of 6 | OVERLAY AND PAVEMENT MARKINGS | KAUFMAN | 2019-06-04 | $1,263,559.63 | $1,098,460.50 |
| Rank 4of 4 | SAFETY TRT FXD OBJ, ADDL SURF WIDTH, RUMBLE STRIPS | MONTAGUE | 2019-06-04 | $4,242,651.86 | $3,337,756.50 |
| Rank 5of 5 | GR, BS, DR, PAV | JACK | 2019-06-04 | $6,842,542.76 | $5,282,831.64 |
| Rank 3of 3 | OVERLAY | PALO PINTO | 2019-06-04 | $3,858,590.37 | $3,283,418.88 |
| Rank 5of 5 | OVERLAY | PARKER | 2019-06-04 | $4,036,210.67 | $2,799,918.92 |
| Rank 4of 4 | CONCRETE REPAIR_AND OVERLAY | TRAVIS | 2019-06-04 | $12,822,534.76 | $8,481,874.53 |
| Rank 3of 3 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | ELLIS | 2019-06-04 | $3,744,880.62 | $2,987,208.00 |
| Rank 3of 3 | ADD PASS LNS | HAMILTON | 2019-05-08 | $15,214,439.04 | $12,587,706.09 |
| Rank 3of 3 | SFTY TR FX OBJS | MCLENNAN | 2019-05-08 | $10,312,191.39 | $9,304,002.22 |
| Rank 4of 4 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | COLLIN | 2019-05-08 | $8,657,508.58 | $6,073,071.05 |
| Low bidof 4 | TRNARND UNDRPS | BELL | 2019-05-08 | $8,482,505.85 | $8,482,505.85 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.