Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
439 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 5 | GR, BS, DR, PAV | TARRANT | 2017-08-08 | $1,385,693.14 | $997,337.74 |
| Rank 4of 4 | GR, DR AND PAVEMENT | TARRANT | 2017-08-08 | $5,139,985.32 | $3,732,867.33 |
| Low bidof 2 | CONSTRUCT RAMP REVERSAL | GRAYSON | 2017-08-08 | $3,798,996.97 | $3,798,996.97 |
| Rank 5of 6 | WIDEN, OVERLAY, BASE REPAIR | COLLIN | 2017-08-08 | $1,595,658.10 | $1,442,556.40 |
| Low bidof 7 | PROVIDE ADDITIONAL PAVEMENT SURFACE AND OVERLAY | ROCKWALL | 2017-07-12 | $11,599,739.37 | $11,599,739.37 |
| Rank 4of 8 | GR, BS, DR, STR, PAV | WISE | 2017-07-11 | $3,565,101.29 | $3,268,105.61 |
| Rank 5of 7 | WIDEN 2 LANE RURAL ROADWAY TO 6 LANES DIVIDED URBA | DENTON | 2017-07-11 | $43,176,243.51 | $37,641,150.13 |
| Rank 4of 4 | RESTORE EXISTING PAVEMENT | ELLIS | 2017-07-11 | $4,292,305.74 | $2,889,061.76 |
| Rank 7of 8 | REPLACE BRIDGE AND APPROACHES | KAUFMAN | 2017-07-11 | $1,679,097.03 | $1,359,589.42 |
| Rank 3of 6 | BASE REPAIR, LEVEL UP, OVERLAY | COLLIN | 2017-07-11 | $1,656,498.74 | $1,562,281.63 |
| Rank 3of 7 | RECONSTRUCT PARK ROAD INCLUDING PARKING LOTS | DALLAS | 2017-07-11 | $1,095,090.57 | $1,037,211.25 |
| Rank 6of 7 | GRADING,BASE,DRAINAGE,STRUCTURE,PAV | WISE | 2017-07-11 | $8,838,065.64 | $7,015,561.58 |
| Low bidof 6 | CONSTRUCT 2 LANE NORTHBOUND FRONTAGE ROAD | DENTON | 2017-06-07 | $15,229,273.88 | $15,229,273.88 |
| Rank 5of 10 | REPLACE BRIDGE AND APPROACHES | COLLIN | 2017-06-07 | $1,919,437.20 | $1,597,549.75 |
| Rank 4of 7 | REPLACE BRIDGE AND APPROACHES | DENTON | 2017-06-07 | $1,849,980.49 | $1,648,413.60 |
| Rank 5of 7 | CONSTRUCTION OF FRONTAGE ROADS | DALLAS | 2017-06-06 | $59,656,982.56 | $54,241,512.22 |
| Rank 5of 9 | RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS | KAUFMAN | 2017-06-06 | $4,796,248.60 | $4,087,837.40 |
| Rank 4of 5 | REPLACE RAILROAD OVERPASS & APPROACHES | VAN ZANDT | 2017-06-06 | $1,926,544.53 | $1,498,798.05 |
| Rank 7of 7 | BASE REPAIR, LEVEL UP, OVERLAY | COLLIN | 2017-06-06 | $3,349,701.20 | $2,697,083.13 |
| Low bidof 8 | GRADING, STRUCTURES AND PAVEMENT | PARKER | 2017-06-06 | $29,849,945.95 | $29,849,945.95 |
| Rank 2of 6 | REHABILITATE BRIDGE | PALO PINTO | 2017-04-05 | $5,069,207.25 | $4,656,945.55 |
| Rank 7of 8 | GR, BS, STRUC, AND PAVEMENT | HOOD | 2017-04-04 | $4,419,577.05 | $3,211,241.96 |
| Rank 8of 10 | REPLACE BR AND APPRS | KAUFMAN | 2017-04-04 | $894,930.03 | $696,776.52 |
| Rank 2of 3 | REHABILITATION OF EXISTING ROADWAY | KAUFMAN | 2017-04-04 | $6,309,375.09 | $5,676,173.14 |
| Rank 6of 7 | REHABILITATION OF EXISTING ROAD | GRAYSON | 2017-02-03 | $11,949,469.56 | $9,962,020.60 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.