Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
439 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 5 | BASE REPAIR,LEVEL UP,OVERLAY | KAUFMAN | 2017-02-03 | $5,019,221.63 | $4,016,437.41 |
| Rank 6of 7 | RECONSTRUCT BRIDGE & CHANNEL | TARRANT | 2017-02-03 | $6,949,766.52 | $5,252,178.37 |
| Low bidof 8 | CONSTRUCT WB 0 TO 2 LN FRONTAGE ROAD & RAMP MOD | DALLAS | 2017-01-05 | $3,939,023.45 | $3,939,023.45 |
| Rank 8of 9 | REPL BR & APPRS | MCLENNAN | 2017-01-05 | $695,000.00 | $453,594.10 |
| Rank 6of 6 | CONSTRUCT CURB RAMPS | TARRANT | 2017-01-05 | $2,890,246.19 | $1,617,402.20 |
| Rank 3of 7 | OFF SITE DRAINAGE REPLACEMENT | HOOD | 2017-01-04 | $3,549,336.50 | $2,899,083.65 |
| Rank 3of 6 | GR, BS, ASPHALT PAV, PAV MK, SIGN | TARRANT | 2017-01-04 | $1,369,632.27 | $1,173,740.01 |
| Rank 5of 6 | CONSTRUCT PAVED SHOULDERS | NAVARRO | 2016-12-01 | $4,693,656.47 | $3,875,212.20 |
| Rank 6of 8 | REPLACE BRIDGE AND APPROACHES | COOKE | 2016-12-01 | $1,269,616.50 | $837,893.66 |
| Rank 3of 4 | MILL, REPAIR AND RESURFACE | ELLIS | 2016-11-04 | $7,595,524.99 | $6,987,285.33 |
| Rank 7of 10 | GR, BS, STR & STRIPING | TARRANT | 2016-11-03 | $10,946,107.14 | $9,048,794.43 |
| Rank 7of 9 | REPLACE BRIDGES AND APPROACHES | TARRANT | 2016-11-03 | $3,297,910.96 | $2,474,990.19 |
| Low bidof 7 | GR,BS,DR,STR AND PAV | TARRANT | 2016-11-03 | $4,196,348.59 | $4,196,348.59 |
| Rank 7of 10 | CONST 2 LANES OF ULT 4 LANE DIVIDED HWY | HUNT | 2016-11-03 | $8,449,167.85 | $7,109,675.99 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.