Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
419 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 2 | HAZARD ELIMINATION & SAFETY | RED RIVER | 2020-08-06 | $2,627,582.90 | $2,627,582.90 |
| Rank 3of 5 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | PALO PINTO | 2020-08-06 | $3,015,894.30 | $2,574,902.00 |
| Rank 4of 6 | REPLACE BRIDGE AND APPROACHES | HARRISON | 2020-08-06 | $3,229,891.50 | $2,545,187.72 |
| Rank 4of 8 | SIDEWALKS AND PEDESTRIAN BRIDGE | WOOD | 2020-08-06 | $395,780.00 | $339,130.60 |
| Rank 5of 5 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | TARRANT | 2020-08-06 | $633,806.00 | $395,565.10 |
| Low bidof 4 | HAZARD ELIMINATION & SAFETY | GRAYSON | 2020-08-05 | $1,740,801.09 | $1,740,801.09 |
| Rank 3of 5 | REHABILITATE EXISTING ROADWAY | FANNIN | 2020-07-09 | $4,292,011.30 | $3,637,497.58 |
| Rank 6of 8 | CONSTRUCTION OF PEDESTRIAN SIDEWALKS & CURB RAMPS | ANGELINA | 2020-07-09 | $2,284,160.50 | $1,630,093.42 |
| Rank 6of 8 | DRAINAGE IMPROVEMENTS, STRS, EMBANKMENT & SEEDING | SMITH | 2020-07-09 | $224,962.00 | $177,736.40 |
| Low bidof 8 | SIDEWALKS & ADA PED RAMPS | SMITH | 2020-07-08 | $3,512,938.50 | $3,512,938.50 |
| Rank 4of 7 | REHABILITATE EXISTING ROADWAY | LAMAR | 2020-07-08 | $2,645,162.48 | $2,265,145.83 |
| Rank 4of 6 | HIKE AND/OR BIKE | RED RIVER | 2020-07-08 | $1,077,875.24 | $682,513.10 |
| Rank 6of 7 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | RED RIVER | 2020-05-08 | $5,033,146.09 | $3,889,514.77 |
| Low bidof 5 | SAFETY TREAT FIXED OBJECTS | HOPKINS | 2020-05-08 | $2,754,447.02 | $2,754,447.02 |
| Rank 4of 8 | CONSTRUCT SIDEWALK AND PEDESTRIAN BRIDGE | BELL | 2020-05-08 | $2,716,929.00 | $2,447,065.10 |
| Rank 13of 13 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | HARRIS | 2020-05-07 | $11,573,578.75 | $5,499,459.69 |
| Rank 2of 3 | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | LAMAR | 2020-05-07 | $1,018,643.00 | $951,964.03 |
| Rank 9of 12 | CULVERT REPAIR | HENDERSON | 2020-05-07 | $393,231.10 | $298,122.75 |
| Rank 2of 7 | BPM-EROSION REPAIR | HUNT | 2020-04-16 | $93,515.00 | $92,220.00 |
| Rank 3of 8 | BPM-ABUTMENT & RIPRAP EROSION REPAIR | GRAYSON | 2020-04-16 | $288,765.00 | $264,124.00 |
| Rank 4of 6 | FOR THE CONSTRUCTION OF BRIDGE DECK REPAIR | DALLAS | 2020-04-09 | $5,759,828.68 | $4,328,705.98 |
| Rank 4of 5 | 2R REHABILITATION | HUNT | 2020-04-09 | $4,731,916.94 | $3,969,724.27 |
| Low bidof 4 | 2R REHABILITATION | FANNIN | 2020-04-08 | $5,973,029.70 | $5,973,029.70 |
| Rank 7of 8 | IMPROVE DRAINAGE, CULVERTS AND UPGRADE GUARD RAIL | GREGG | 2020-04-08 | $4,771,144.50 | $3,889,930.50 |
| Rank 2of 5 | 2R REHABILITATION | HOPKINS | 2020-04-08 | $3,766,080.11 | $3,763,142.16 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.