Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
419 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 6 | RIPRAP/EROSION REPAIR | LAMAR | 2020-03-19 | $178,760.00 | $167,089.00 |
| Rank 8of 9 | BPM-CONCRETE BEAM AND STRUCTURE REPAIR | HOPKINS | 2020-03-19 | $275,640.00 | $182,140.00 |
| Rank 6of 6 | SUBGRADE WDN, ACP BS, OCST, ACP SURF, STRS, MBGF, | CHEROKEE | 2020-03-05 | $6,962,582.46 | $5,515,687.82 |
| Rank 2of 9 | REPLACE BRIDGE & APPROACHES | VAN ZANDT | 2020-03-05 | $1,075,349.20 | $1,069,893.40 |
| Low bidof 7 | HAZARD ELIMINATION & SAFETY | HUNT | 2020-03-05 | $1,046,859.98 | $1,046,859.98 |
| Rank 3of 8 | REPLACE BRIDGES & APPROACHES | ANDERSON | 2020-03-04 | $1,601,724.25 | $1,452,726.81 |
| Rank 3of 8 | REPLACE BRIDGE & APPROACHES | CHEROKEE | 2020-03-04 | $2,153,979.32 | $1,943,346.80 |
| Rank 3of 7 | REPLACE BRIDGE & APPROACHES | WOOD | 2020-03-04 | $1,511,739.01 | $1,332,153.39 |
| Rank 6of 12 | SAFETY TREAT FIXED OBJECTS | HARRISON | 2020-03-04 | $2,038,713.00 | $1,847,139.90 |
| Rank 2of 13 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | PARKER | 2020-03-04 | $778,860.00 | $772,789.00 |
| Rank 4of 9 | BRIDGE REPLACEMENT | VAN ZANDT | 2020-03-04 | $580,651.69 | $552,443.00 |
| Rank 4of 5 | FULL DEPTH CONCRETE REPAIR | HOPKINS | 2020-02-07 | $2,206,272.00 | $1,777,711.00 |
| Rank 2of 9 | IMPROVING DRAINAGE, CULVERTS, UPGRADE GUARD RAIL | VAN ZANDT | 2020-02-06 | $2,712,298.00 | $2,544,980.75 |
| Rank 5of 5 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | GRAYSON | 2020-02-06 | $2,793,294.00 | $1,493,869.88 |
| Rank 5of 6 | COLLAPSE APPR SLABS & ERORDED EMBANKMENT | HOOD | 2020-01-09 | $1,395,195.00 | $839,137.68 |
| Rank 3of 5 | CULVERT REPAIR | CHEROKEE | 2020-01-07 | $289,757.90 | $266,617.90 |
| Rank 4of 5 | CULVERT REPLACEMENT | ARCHER | 2019-12-04 | $745,034.50 | $587,035.21 |
| Low bidof 7 | GUARD RAIL, DRAINAGE STRUCTURES, BRIDGE RAIL | VAN ZANDT | 2019-12-03 | $4,537,223.82 | $4,537,223.82 |
| Rank 2of 10 | DRAINAGE STRUCTURE | ANDERSON | 2019-11-12 | $182,627.00 | $167,162.40 |
| Rank 4of 5 | UPGRADE BRIDGE RAILING AND APPROACH RAILING | DENTON | 2019-11-06 | $1,643,949.00 | $1,398,590.15 |
| Rank 2of 7 | REHABILITATION OF EXISTING ROAD | FANNIN | 2019-11-06 | $3,790,965.99 | $3,715,011.16 |
| Low bidof 5 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | HUNT | 2019-10-03 | $167,672.90 | $167,672.90 |
| Rank 4of 5 | 10-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDO | LAMAR | 2019-10-02 | $1,790,758.25 | $1,331,649.70 |
| Rank 4of 6 | 10-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDO | RED RIVER | 2019-10-02 | $1,491,140.86 | $941,217.04 |
| Low bidof 4 | BICYCLE INFRASTRUCTURE IMPROVEMENTS | GRAYSON | 2019-09-06 | $1,074,743.15 | $1,074,743.15 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.