Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
419 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 12 | REPLACE BRIDGE AND APPROACHES | KAUFMAN | 2019-01-08 | $1,456,654.88 | $1,387,159.00 |
| Rank 6of 7 | REPLACE CHEVRONS AND CURVE SIGNS | LAMAR | 2019-01-08 | $2,385,650.00 | $1,962,838.00 |
| Rank 6of 10 | BRIDGE PROVENTATIVE MAINTENANCE | CHEROKEE | 2018-12-11 | $330,492.15 | $255,590.17 |
| Rank 4of 6 | BRIDGE PROVENTATIVE MAINTENANCE | WOOD | 2018-12-11 | $258,040.00 | $200,576.00 |
| Rank 7of 8 | CONSTRUCT SIDEWALKS | WHARTON | 2018-12-05 | $259,845.00 | $144,419.82 |
| Rank 7of 15 | REPLACE BRIDGE AND APPROACHES | NAVARRO | 2018-11-07 | $9,018,202.88 | $7,969,999.98 |
| Rank 4of 10 | BRIDGE PREVENTIVE MAINTENANCE | TITUS | 2018-11-06 | $733,664.00 | $623,721.00 |
| Rank 5of 7 | UPGRADE MBGF | CAMP | 2018-10-03 | $1,082,125.00 | $934,655.00 |
| Low bidof 3 | CROSS DRAINAGE STRUCTURE REPAIR | RAINS | 2018-09-20 | $165,494.00 | $165,494.00 |
| Low bidof 4 | CONSTRUCT CURB RAMPS AND SIDEWALKS | DALLAS | 2018-09-07 | $2,237,635.19 | $2,237,635.19 |
| Rank 2of 9 | REPLACE BRIDGE AND APPROACHES | COLLIN | 2018-09-06 | $4,429,686.05 | $4,119,000.00 |
| Rank 10of 10 | RIPRAP SLOPE REPAIR | TARRANT | 2018-09-06 | $989,615.00 | $655,000.00 |
| Rank 4of 8 | SLOPE REPAIR | JOHNSON | 2018-09-06 | $1,331,605.00 | $756,360.61 |
| Rank 3of 7 | BRIDGE REPLACEMENT | LAMAR | 2018-08-08 | $1,125,762.50 | $1,097,243.75 |
| Rank 4of 6 | CONSTRUCT CURB RAMPS | TARRANT | 2018-08-07 | $3,081,822.00 | $2,419,003.00 |
| Rank 3of 9 | HAZARD ELIMINATION & SAFETY | GRAYSON | 2018-08-07 | $3,669,412.50 | $3,461,445.00 |
| Rank 3of 11 | REPLACE BRIDGE AND APPROACHES | KAUFMAN | 2018-07-11 | $3,108,609.20 | $2,718,727.83 |
| Rank 7of 7 | REHABILITATION OF EXISTING ROAD | LAMAR | 2018-07-11 | $5,727,848.81 | $4,044,598.86 |
| Rank 6of 7 | MISCELLANEOUS CONCRETE REPAIR | DALLAS | 2018-07-11 | $441,065.00 | $324,270.00 |
| Low bidof 9 | BRIDGE REPLACEMENT | HOPKINS | 2018-07-10 | $253,519.42 | $253,519.42 |
| Low bidof 6 | GR,FLX BS,ACP,CULV EXT&RPLCMT,SIGNS,PV MK | SMITH | 2018-07-10 | $14,458,790.48 | $14,458,790.48 |
| Rank 3of 9 | CROSS DRAINAGE STRUCTURE REPAIR | DELTA | 2018-07-10 | $577,457.00 | $519,836.80 |
| Rank 4of 5 | MISCELLANEOUS CONCRETE REPAIR | DALLAS | 2018-07-10 | $474,735.00 | $335,413.00 |
| Rank 2of 8 | CONSTRUCT CURB RAMPS | ANGELINA | 2018-06-06 | $2,380,963.00 | $2,105,750.30 |
| Rank 2of 7 | BRIDGE REPLACEMENT | GRAYSON | 2018-06-06 | $1,086,952.10 | $1,074,079.50 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.