Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
419 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 9of 11 | BRIDGE REPLACEMENT | HOUSTON | 2018-06-06 | $751,649.29 | $584,116.65 |
| Rank 5of 5 | BRIDGE DECK REPAIR AND ABUT & BENT WORK | DALLAS | 2018-06-06 | $1,481,594.30 | $906,208.75 |
| Rank 3of 11 | HAZARD ELIMINATION & SAFETY | RED RIVER | 2018-06-05 | $3,005,926.36 | $2,961,890.31 |
| Rank 4of 6 | UPGRADE BRIDGE & APPROACH RAILING | TARRANT | 2018-06-05 | $1,712,400.00 | $1,213,542.00 |
| Rank 9of 11 | CULVERT EXTENSION & CROSS DRAINAGE | KAUFMAN | 2018-06-05 | $762,246.75 | $550,868.00 |
| Rank 6of 6 | REPAIR AND RESURFACE HIGHWAY | NAVARRO | 2018-05-02 | $18,898,126.40 | $12,773,111.87 |
| Low bidof 7 | CONC DECK REPAIR & CONC STR REPAIR | HARRISON | 2018-05-02 | $2,087,956.00 | $2,087,956.00 |
| Low bidof 9 | MISCELLANEOUS CONCRETE REPAIR | KAUFMAN | 2018-05-02 | $280,600.00 | $280,600.00 |
| Rank 5of 7 | PEDESTRIAN IMPROVEMENTS | DALLAS | 2018-05-01 | $420,405.00 | $350,140.33 |
| Rank 7of 9 | REPLACE AND RELOCATE BRIDGE | TARRANT | 2018-05-01 | $3,010,907.47 | $2,379,000.00 |
| Rank 4of 7 | SAFETY_TREAT_FIXED OBJECTS_CONSTRUCT_PAVED SHDLRS | ELLIS | 2018-05-01 | $1,531,985.70 | $1,003,410.95 |
| Rank 8of 9 | CONSTRUCT SIDEWALKS ALONG FRONTAGE ROADS | BEXAR | 2018-05-01 | $5,139,620.00 | $4,561,840.84 |
| Rank 8of 10 | DRAINAGE STRUCTURE MAINTENANCE | TITUS | 2018-05-01 | $543,196.43 | $398,912.75 |
| Rank 9of 11 | BPM-ABUTMENT EROSION REPAIR | GRAYSON | 2018-03-22 | $138,190.00 | $95,594.00 |
| Low bidof 11 | HAZARD ELIMINATION & SAFETY | RED RIVER | 2018-03-07 | $841,028.20 | $841,028.20 |
| Rank 5of 7 | REPLACE BRIDGE & APPROACHES | SMITH | 2018-03-07 | $2,330,410.40 | $2,029,446.31 |
| Rank 2of 10 | REPLACE BRIDGE & APPROACHES | SMITH | 2018-03-07 | $868,800.73 | $833,389.25 |
| Rank 2of 10 | SLOPE FAILURE REPAIR | ROCKWALL | 2018-03-07 | $2,321,621.40 | $2,226,102.00 |
| Rank 4of 6 | SFTY TR FX OBJS | LIMESTONE | 2018-03-06 | $838,192.38 | $698,267.33 |
| Low bidof 10 | REPLACE CULVERTS AND IMPROVE DRAINAGE | GRAYSON | 2018-03-06 | $201,885.96 | $201,885.96 |
| Rank 8of 11 | SAFETY TREAT FIXED OBJECTS | BOWIE | 2018-03-06 | $1,924,575.97 | $1,463,551.05 |
| Rank 5of 11 | REPLACE BRIDGE AND APPROACHES | VAN ZANDT | 2018-03-06 | $1,035,687.14 | $904,834.79 |
| Rank 3of 10 | REPLACE BRIDGE AND APPROACHES | PALO PINTO | 2018-03-06 | $852,979.00 | $826,138.00 |
| Rank 6of 11 | BRIDGE PREVENTIVE MAINTENANCE | GREGG | 2018-02-06 | $295,141.00 | $210,592.00 |
| Rank 7of 10 | BRIDGE PREVENTIVE MAINTENANCE | ANDERSON | 2018-02-06 | $337,116.60 | $232,132.65 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.