Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
753 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 2 | DENSE-GRADED HOT-MIX ASPHALT(MATERIAL ONLY) | GRIMES | 2020-04-14 | $297,650.00 | $276,500.00 |
| Rank 2of 3 | DENSE-GRADED HOT-MIX ASPHALT(MATERIAL ONLY) | MILAM | 2020-04-14 | $258,800.00 | $234,000.00 |
| Low bidof 5 | SCOUR COUNTERMEASURES AT GRASSY CREEK | GRIMES | 2020-04-14 | $128,430.00 | $128,430.00 |
| Low bidof 5 | CONSTRUCT SUPER 2 HIGHWAY AND SURFACING | COMANCHE | 2020-04-09 | $13,793,112.53 | $13,793,112.53 |
| Rank 4of 9 | CONSTRUCTION OF PEDESTRIAN, SIDEWALKS & CURB RAMPS | MCLENNAN | 2020-04-09 | $909,466.85 | $862,612.40 |
| Rank 2of 7 | BRIDGE REPLACEMENT | BURLESON | 2020-04-09 | $1,574,341.29 | $1,458,197.95 |
| Low bidof 3 | COLD MIX - MATERAL ONLY | BELL | 2020-04-09 | $631,470.00 | $631,470.00 |
| Rank 2of 3 | HOT MIX - MATERIAL ONLY | BOSQUE | 2020-04-09 | $807,620.00 | $800,750.00 |
| Low bidof 2 | HOT MIX - MATERIAL ONLY | HAMILTON | 2020-04-09 | $916,653.00 | $916,653.00 |
| Rank 2of 4 | HOT MIX - MATERIAL ONLY | BELL | 2020-04-09 | $2,381,560.00 | $2,275,500.00 |
| Rank 2of 3 | HOT MIX - MATERIAL ONLY | CORYELL | 2020-04-09 | $533,270.50 | $519,000.00 |
| Low bidof 11 | BRIDGE REPLACEMENT | FREESTONE | 2020-04-08 | $479,340.50 | $479,340.50 |
| Rank 2of 7 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | NAVARRO | 2020-04-08 | $1,049,531.75 | $1,009,303.00 |
| Low bidof 4 | SH 75 TOM OVERLAY, WIDENING, RESTRIPING | WALKER | 2020-04-01 | $372,661.77 | $372,661.77 |
| Low bidof 3 | HOT MIX-MATERIAL ONLY | FALLS | 2020-03-04 | $1,108,250.00 | $1,108,250.00 |
| Rank 2of 3 | HOT MIX-MATERIAL ONLY | HILL | 2020-03-04 | $1,413,760.00 | $1,393,832.50 |
| Rank 2of 3 | HOT MIX-MATERIAL ONLY | LIMESTONE | 2020-03-04 | $2,013,600.00 | $2,010,250.00 |
| Rank 2of 3 | HOT MIX-MATERIAL ONLY | MCLENNAN | 2020-03-04 | $2,663,800.00 | $2,635,350.00 |
| Rank 2of 5 | REHAB & WIDEN ROADWAY | HAMILTON | 2020-02-07 | $5,664,838.55 | $5,387,759.04 |
| Low bidof 6 | INSTALL TWO-WAY LEFT TURN LANE | MILAM | 2020-02-07 | $376,466.30 | $376,466.30 |
| Rank 4of 5 | SURFACING/ROADWAY RESTORATION | WALLER | 2020-02-06 | $6,029,216.98 | $5,433,536.70 |
| Rank 2of 4 | ASPHALTIC CONCRETE OVERLAY | CORYELL | 2020-02-06 | $3,095,193.16 | $2,987,724.20 |
| Rank 5of 6 | SCOUR REPAIR | ROBERTSON | 2020-01-14 | $350,430.00 | $243,081.00 |
| Rank 3of 4 | REHABILITATE PAVEMENT STRUCTURE | LIMESTONE | 2019-12-04 | $7,427,957.07 | $7,107,478.07 |
| Low bidof 6 | REPL BR & APPRS | MCLENNAN | 2019-12-04 | $663,129.76 | $663,129.76 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.