Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
753 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 4 | BRIDGE PREVENTIVE MAINTENANCE | BELL | 2019-12-04 | $1,099,792.50 | $943,121.86 |
| Rank 6of 8 | SLOPE REPAIR TO NORTH/SOUTH SH 6 | GRIMES | 2019-12-03 | $2,693,278.42 | $1,445,358.55 |
| Rank 3of 3 | ADD PASS LNS, MILL/INLY | BOSQUE | 2019-11-06 | $20,671,365.70 | $19,873,560.72 |
| Rank 2of 5 | REPAIR AND RESURFACE HIGHWAY | NAVARRO | 2019-11-06 | $12,359,604.17 | $12,342,946.36 |
| Low bidof 3 | OVERLAY | BRAZOS | 2019-11-06 | $1,595,061.65 | $1,595,061.65 |
| Low bidof 5 | REHABILITATE EXISTING ROADWAY | LEON | 2019-11-05 | $9,543,192.09 | $9,543,192.09 |
| Rank 4of 6 | REPLACE BRIDGE AND APPROACHES | AUSTIN | 2019-11-05 | $948,069.50 | $725,918.90 |
| Rank 2of 5 | PAVEMENT REPAIR, OVERLAY AND PAVEMENT MARKINGS | NAVARRO | 2019-11-05 | $2,887,472.31 | $2,787,386.38 |
| Low bidof 3 | INCREASE SUPERELEVATION | BOSQUE | 2019-11-05 | $1,514,248.15 | $1,514,248.15 |
| Low bidof 3 | BRIDGE RAIL AND DECK REPAIR | WALKER | 2019-10-08 | $142,716.98 | $142,716.98 |
| Rank 5of 6 | STONE RIP RAP AND SCOUR COUNTERMEASURES | BRAZOS | 2019-10-08 | $186,989.00 | $125,777.00 |
| Low bidof 4 | REHABILITATE EXISTING ROAD | FREESTONE | 2019-10-03 | $14,892,846.02 | $14,892,846.02 |
| Rank 2of 6 | CONSTRUCTION OF ADDITIONAL PAVED SURFACE WIDTH | LEE | 2019-10-03 | $7,892,390.81 | $7,577,299.42 |
| Low bidof 5 | REPLACE BRIDGE AND APPROACH RAILING | BRAZOS | 2019-10-02 | $1,471,134.30 | $1,471,134.30 |
| Rank 2of 6 | REPL BR & APPRS | FALLS | 2019-10-02 | $386,256.79 | $362,831.10 |
| Rank 2of 4 | CULVERT AND STORM DRAINAGE WORK | LEON | 2019-09-05 | $3,818,900.75 | $3,722,168.95 |
| Rank 2of 5 | REHABILITATION OF EXISTING ROAD | MILAM | 2019-08-07 | $17,958,616.26 | $17,254,988.40 |
| Rank 5of 5 | BASE FAILURE PAYMENT REPAIR | BELL | 2019-08-07 | $1,607,216.50 | $1,314,218.90 |
| Rank 4of 4 | BASE FAILURE PAVEMENT REPAIR | CORYELL | 2019-08-07 | $654,864.40 | $512,219.15 |
| Rank 3of 4 | BASE FAILURE PAVEMENT REPAIR | HAMILTON | 2019-08-07 | $990,608.10 | $879,594.00 |
| Rank 2of 3 | BASE FAILURE PAVEMENT REPAIR | HILL | 2019-08-07 | $1,448,102.80 | $1,425,925.50 |
| Rank 4of 8 | PEDESTRIAN, SIDEWALKS AND CURB RAMPS | BRAZOS | 2019-08-06 | $1,150,493.54 | $1,105,702.15 |
| Rank 2of 2 | INSTALLATION OF DRIVEWAY PIPE | BRAZOS | 2019-07-10 | $1,279,945.00 | $715,533.00 |
| Rank 2of 4 | BASE FAILURE PAVEMENT REPAIR | BOSQUE | 2019-07-10 | $801,667.40 | $790,262.72 |
| Low bidof 4 | BASE FAILURE PAVEMENT REPAIR | FALLS | 2019-07-10 | $507,127.80 | $507,127.80 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.