Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
469 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 6of 10 | REPLACE CULVERTS AND IMPROVE DRAINAGE | GRAYSON | 2018-03-06 | $278,045.40 | $201,885.96 |
| Rank 10of 11 | SAFETY TREAT FIXED OBJECTS | BOWIE | 2018-03-06 | $2,635,098.00 | $1,463,551.05 |
| Rank 6of 11 | REPLACE BRIDGE AND APPROACHES | VAN ZANDT | 2018-03-06 | $1,054,933.80 | $904,834.79 |
| Low bidof 10 | REPLACE BRIDGE AND APPROACHES | PALO PINTO | 2018-03-06 | $826,138.00 | $826,138.00 |
| Rank 3of 8 | REPLACE EXISTING BRIDGE AND APPROACHES | ROBERTS | 2018-02-02 | $2,297,340.40 | $2,093,931.75 |
| Rank 11of 18 | REPLACE BRIDGE AND APPROACHES | COLLIN | 2018-02-01 | $2,724,953.84 | $1,885,537.10 |
| Rank 7of 8 | REPLACE BRIDGE AND APPROACHES | CORYELL | 2018-02-01 | $1,498,739.20 | $1,048,921.12 |
| Rank 8of 8 | CONSTRUCT CURB RAMPS | LAMAR | 2018-02-01 | $3,633,798.50 | $2,370,334.00 |
| Rank 5of 6 | REPLACE BRIDGE AND APPROACHES | GRAY | 2018-02-01 | $1,791,481.00 | $1,525,326.00 |
| Rank 7of 10 | BRIDGE PREVENTIVE MAINTENANCE | BOWIE | 2018-02-01 | $1,315,370.00 | $853,995.00 |
| Rank 3of 13 | REPLACE BRIDGE AND APPROACHES | NAVARRO | 2017-12-06 | $2,840,212.20 | $2,595,949.99 |
| Rank 7of 8 | DECK AND CONCRETE STRUCTURE REPAIR | WILBARGER | 2017-12-05 | $2,338,426.50 | $1,842,668.48 |
| Rank 6of 12 | BRIDGE MAINTENANCE | CORYELL | 2017-12-05 | $442,536.60 | $277,779.40 |
| Rank 4of 4 | BRIDGE PREVENTATIVE MAINTENANCE | ANGELINA | 2017-12-05 | $931,578.00 | $464,563.00 |
| Rank 4of 8 | TRUSS CLEANING AND PAINTING | BELL | 2017-11-03 | $1,722,469.80 | $1,599,937.89 |
| Rank 7of 9 | EROSION/DRAINAGE REPAIR | WICHITA | 2017-11-03 | $816,103.00 | $578,952.30 |
| Rank 4of 12 | DRAINAGE IMPROVEMENTS | STEPHENS | 2017-11-02 | $251,371.00 | $223,073.50 |
| Rank 7of 11 | CONSTRUCT SIDEWALKS | CAMP | 2017-10-04 | $417,844.00 | $309,168.00 |
| Low bidof 6 | BRIDGE REPAIR | HOUSTON | 2017-10-04 | $1,384,827.00 | $1,384,827.00 |
| Rank 8of 11 | REPLACE BRIDGE AND APPROACHES | KENDALL | 2017-10-04 | $625,417.00 | $514,522.70 |
| Rank 4of 6 | BRIDGE REHAB & EROSION REPAIR | LLANO | 2017-10-04 | $1,085,510.00 | $890,245.00 |
| Low bidof 10 | REPLACE BRIDGE AND APPROACHES | STEPHENS | 2017-10-03 | $676,266.50 | $676,266.50 |
| Rank 3of 8 | REPLACE BRIDGE AND APPROACHES | TOM GREEN | 2017-10-03 | $1,295,783.50 | $1,177,930.30 |
| Rank 9of 10 | BRIDGE REPLACEMENT | MONTGOMERY | 2017-10-03 | $1,757,567.00 | $1,488,885.75 |
| Rank 7of 7 | CONSTRUCT SHARED USE PATH | LAMAR | 2017-09-07 | $1,709,608.40 | $679,839.40 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.