Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
469 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 7of 7 | CONSTRUCT SHARED USE PATH | RED RIVER | 2017-09-07 | $1,575,991.10 | $967,747.60 |
| Rank 6of 8 | RPLC BR&APPR,GRADING,ACP BS&SURF,MBGF,PV MK | SMITH | 2017-08-09 | $1,177,662.50 | $1,077,661.37 |
| Rank 9of 9 | REPLACE EXISTING BRIDGE | MILAM | 2017-08-09 | $974,598.80 | $668,667.60 |
| Rank 7of 7 | GR,STR,BASE,SURFACING | HARRISON | 2017-08-09 | $3,303,028.20 | $2,284,633.31 |
| Rank 2of 6 | MISCELLANEOUS BRIDGE REPAIR | BROWN | 2017-08-09 | $616,640.00 | $564,232.00 |
| Rank 4of 6 | BRIDGE REPLACEMENT | CALLAHAN | 2017-08-08 | $1,556,492.10 | $1,472,447.50 |
| Rank 6of 7 | CLEAN/PAINT STEEL GRDRS,REPL BR RAIL,CONC DK OVLY | ANDERSON | 2017-08-08 | $2,167,358.10 | $1,646,254.33 |
| Rank 8of 8 | BRIDGE REPLACEMENT | SHELBY | 2017-07-12 | $1,042,858.60 | $619,833.67 |
| Rank 7of 7 | REPL BR & APPRS | FALLS | 2017-07-12 | $2,912,508.60 | $1,598,158.58 |
| Rank 6of 7 | REPLACE BRIDGE AND APPROACHES | HARRISON | 2017-07-12 | $558,622.00 | $444,410.70 |
| Rank 2of 6 | REPLACE BRIDGE AND APPROACHES | WICHITA | 2017-07-12 | $2,503,519.34 | $2,398,060.27 |
| Rank 5of 8 | REPLACE BRIDGE AND APPROACHES | KAUFMAN | 2017-07-11 | $1,598,325.90 | $1,359,589.42 |
| Rank 4of 8 | THE REPLACEMENT OF A BRIDGE FACILITY | HALL | 2017-07-11 | $609,562.24 | $557,176.20 |
| Rank 6of 10 | REPLACE BRIDGE AND APPROACHES | COLLIN | 2017-06-07 | $1,951,121.50 | $1,597,549.75 |
| Rank 7of 7 | REPLACE BRIDGE AND APPROACHES | DENTON | 2017-06-07 | $2,403,160.00 | $1,648,413.60 |
| Rank 5of 7 | REPLACE EXISTING BRIDGE FACILITY | WALKER | 2017-06-06 | $724,111.00 | $504,029.64 |
| Rank 8of 11 | REPLACE EXISTING BRIDGE FACILITY | MILAM | 2017-06-06 | $601,828.00 | $447,590.00 |
| Rank 8of 10 | CONCRETE STRUCTURE REPAIR | BOWIE | 2017-06-06 | $1,888,310.48 | $1,398,421.50 |
| Rank 3of 8 | BRIDGE REPLACEMENT | DELTA | 2017-06-06 | $1,822,023.70 | $1,665,295.93 |
| Rank 3of 6 | REPLACE BRIDGE AND APPROACHES | JASPER | 2017-05-02 | $1,752,265.90 | $1,409,475.08 |
| Low bidof 9 | REPLACE BRIDGE AND APPROACHES | BOSQUE | 2017-04-05 | $1,451,177.00 | $1,451,177.00 |
| Low bidof 6 | REHABILITATE BRIDGE | PALO PINTO | 2017-04-05 | $4,656,945.55 | $4,656,945.55 |
| Rank 7of 7 | REPLACE BRIDGE AND APPROACHES | SHELBY | 2017-04-05 | $512,541.50 | $432,714.00 |
| Rank 8of 10 | REPLACE BRIDGE & APPROACHES | BELL | 2017-04-05 | $3,518,981.10 | $2,950,399.18 |
| Rank 4of 8 | CULVERT REPAIR | FANNIN | 2017-04-05 | $756,552.00 | $620,554.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.