Ponce De Leon Maint - Remove and Replace Thermoplastic
Bid dateThursday, April 9—
Low bidTRP CONSTRUCTION GROUP, LLC$366,925
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
Bid tab · FDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 0713103101 PERMANENT TAPE, WHITE, SOLID, 6" FOR CONCRETE BRIDGES | 2 GM | $31,500 | $63k | 17% |
| 0713103201 PERMANENT TAPE, YELLOW, SOLID, 6" FOR CONCRETE BRIDGES | 2 GM | $31,500 | $63k | 17% |
| 0711 17 1 THERMOPLASTIC, REMOVE EXISTING THERMOPLASTIC PAVEMENT MARKINGS- SURFACE TO REMAIN | 20,000 SF | $1.25 | $25k | 7% |
| 0713103141 PERMANENT TAPE, WHITE, 6-10 SKIP/DOTTED, 6" FOR CONCRETE SURFACES | 2 GM | $12,500 | $25k | 7% |
| 0713103281 PERMANENT TAPE, YELLOW, 10-30 SKIP, 6" WIDE, FOR CONCRETE SURFACES | 2 GM | $10,000 | $20k | 5% |
| 0711 16102 THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 8" | 2 GM | $6,500 | $13k | 4% |
| 0711 15102 THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES, WHITE, SOLID, 8" | 2 GM | $6,000 | $12k | 3% |
| 0711 15133 THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES, WHITE, SKIP, 12"- APPROACH TO TOLL PLAZA OR 3-9 LANE DROP | 2 GM | $4,900 | $10k | 3% |
| 0711 15101 THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES WHITE, SOLID, 6" |
| 2 GM |
| $4,300 |
| $9k |
| 2% |
| 0711 15201 THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES, YELLOW, SOLID, 6" | 2 GM | $4,300 | $9k | 2% |