Handrail Repair
Lake, Orange, County
Bid dateTuesday, May 5—
Low bidSOUTHEAST HIGHWAY GUARDRAIL & ATTENUATORS, LLC$152,400
Lake, Orange, County
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
Bid tab · FDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 0515 1 2 PIPE HANDRAIL - GUIDERAIL, ALUMINUM | 500 LF | $85 | $43k | 28% |
| 0515 1 1 PIPE HANDRAIL - GUIDERAIL, STEEL | 200 LF | $165 | $33k | 22% |
| 0515 2311 PEDESTRIAN/ BICYCLE RAILING, ALUMINUM ONLY,42" TYPE 1 | 100 LF | $240 | $24k | 16% |
| 0515 2211 PEDESTRIAN / BICYCLE RAILING, STEEL, 42" TYPE 1 | 50 LF | $280 | $14k | 9% |
| 0110 4 10 REMOVAL OF EXISTING CONCRETE | 175 SY | $50 | $9k | 6% |
| 0522 1 CONCRETE SIDEWALK AND DRIVEWAYS, 4" THICK | 75 SY | $80 | $6k | 4% |
| 0522 2 CONCRETE SIDEWALK AND DRIVEWAYS, 6" THICK | 50 SY | $115 | $6k | 4% |
| 0515 4 2 BULLET RAIL, DOUBLE RAIL | 50 LF | $105 | $5k | 3% |
| 0527 2 DETECTABLE WARNINGS | 50 SF | $75 | $4k | 2% |
| 0515 4 1 BULLET RAIL, SINGLE RAIL | 50 LF | $70 | $4k | 2% |