How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$319k
9%
0102 1MAINTENANCE OF TRAFFIC 43589135201
150 DA (LS)
$250,000
$250k
7%
0400 0 11CONCRETE CLASS NS, GRAVITY WALL INDEX 400-011
194.9 CY
$1,200
$234k
7%
0649 1 15STEEL STRAIN POLE, F&I, TYPE PS- VIII
2 EA
$105,000
$210k
6%
0522 1CONCRETE SIDEWALK AND DRIVEWAYS, 4" THICK
1,703 SY
$85
$145k
4%
1000 7UTILITY WORK- JPA/UTILITY AGREEMENT, POWER 43589135201
1 LS
$140,397
$140k
4%
0110 4 10REMOVAL OF EXISTING CONCRETE
1,839 SY
$45
$83k
2%
0670 5161TRAFFIC CONTROLLER ASSEMBLY, F&I, NEMA W/STANDARD LOCK, 1 PREEMPTION