JAC-D09 JAC Oak Hill Salt Barn
JAC County · est $0.4M
Bid dateFriday, February 2—
JAC County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1R K J Fabrication & Construction LLC | R2Distel Construction INC | R3Allard Excavation LLC | % of bid |
|---|---|---|---|---|---|
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 148 CY | $404 | $570 | $513 | 21% |
| 451E13011 8" REINFORCED CONCRETE PAVEMENT, CLASS QC1, AS PER | 310 SY | $136 | $105 | $94.75 | 15% |
| 950E50000 SPECIAL - FACILITIES GALV STL TRUSSES W/ FABRIC ME | 1 LS | $34,320 | $38,115 | $37,680 | 12% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 35,563 LB | $0.86 | $0.65 | $1.00 | 11% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 140 CY | $206 | $196 |
| Item | Quantity | R1R K J Fabrication & Construction LLC | R2Distel Construction INC | R3Allard Excavation LLC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,602 | $600 | $5,200 |
| 202E30700 CONCRETE BARRIER REMOVED | 122 FT | $13.80 | $20.36 | $9.00 |
| 204E50000 GEOTEXTILE FABRIC | 254 SY | $2.09 | $2.28 | $1.72 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 3 EACH | $759 | $1,733 | $636 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $71.06 | $173 | $50.00 |
| 832E30000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $240 |
| 10% |
| 624E10000 MOBILIZATION | 1 LS | $12,367 | $14,000 | $37,991 | 4% |
| 950E50000 SPECIAL - FACILITIES ELECTRICAL, COMPLETE | 1 LS | $12,078 | $11,500 | $8,100 | 4% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 421 SY | $28.59 | $8.71 | $14.88 | 4% |
| 503E21100 UNCLASSIFIED EXCAVATION | 380 CY | $22.27 | $23.10 | $13.00 | 3% |
| 202E23000 PAVEMENT REMOVED | 364 SY | $20.66 | $11.55 | $2.65 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,108 | $6,661 | $7,907 | 2% |
| 203E35140 GRANULAR MATERIAL, TYPE E No. 57 AGGREGATE | 67 CY | $75.87 | $63.53 | $60.00 | 2% |
| 690E50600 SPECIAL - BOLLARD | 6 EACH | $780 | $515 | $695 | 2% |
| 518E62200 STRUCTURE DRAINAGE, MISC.: CLEAN-OUT | 5 EACH | $928 | $139 | $244 | 2% |
| 203E10000 EXCAVATION | 185 CY | $22.02 | $19.64 | $19.00 | 1% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 41 CY | $97.11 | $139 | $72.00 | 1% |
| 304E20000 AGGREGATE BASE | 50 CY | $78.41 | $63.53 | $65.00 | 1% |
| 950E50000 SPECIAL - FACILITIES RED EPOXY 6" STRIPE | 1 LS | $3,230 | $1,300 | $1,898 | 1% |
| 518E42000 8" PERFORATED CORRUGATED PLASTIC PIPE | 220 FT | $13.03 | $28.88 | $12.00 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,818 | $6,353 | $6,875 | 1% |
| 1,200 EACH |
| $1.00 |
| $1.16 |
| $1.00 |
| 518E42010 8" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 121 FT | $15.92 | $28.88 | $15.64 |
| 601E34200 ROCK CHANNEL PROTECTION, TYPE C WITHOUT FILTER | 3 CY | $283 | $75.00 | $97.00 |
| 204E10000 SUBGRADE COMPACTION | 520 SY | $3.43 | $2.31 | $2.10 |
| 204E45000 PROOF ROLLING | 4 HOUR | $116 | $202 | $75.00 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 338 SY | $4.79 | $7.27 | $3.26 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 7 SF | $15.58 | $18.65 | $1.71 |
| 516E31250 SPECIAL - SAWING AND SEALING CONCRETE JOINTS516 | 464 FT | $3.49 | $7.47 | $4.57 |
| 690E50600 SPECIAL - BOLLARD | 2 EACH | $854 | $515 | $687 |
| 950E50000 SPECIAL - FACILITIES WATER STOP (VERTICAL AND HORI | 1 LS | $2,071 | $1,836 | $7,590 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $1,091 | $1,000 | $2,587 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 148 CY | $404.27 | $60k | 19% |
| 451E13011 8" REINFORCED CONCRETE PAVEMENT, CLASS QC1, AS PER | 310 SY | $136.14 | $42k | 14% |
| 950E50000 SPECIAL - FACILITIES GALV STL TRUSSES W/ FABRIC ME | 1 LS | $34,320 | $34k | 11% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 35,563 LB | $0.86 | $31k | 10% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 140 CY | $205.66 | $29k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $12,367 | $12k | 4% |
| 950E50000 SPECIAL - FACILITIES ELECTRICAL, COMPLETE | 1 LS | $12,078 | $12k | 4% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 421 SY | $28.59 | $12k | 4% |
| 503E21100 UNCLASSIFIED EXCAVATION | 380 CY | $22.27 | $8k | 3% |
| 202E23000 PAVEMENT REMOVED | 364 SY | $20.66 | $8k | 2% |