Ohio DOT · bid history
Showing the 300 most recent of 466 bids. Stats above reflect the full history.
| Result | Project | County | Let | Their bid | Winning bid |
|---|---|---|---|---|---|
| Wonof 4 | CUY-IR 480-16.56 SlideEarthwork | CUY | Apr 2026 | $803k | $803k |
| Wonof 4 | MAH-Sheridan Rd (Poland)Safety | MAH | Apr 2026 | $350k | $350k |
| Rank 4of 5 | ASD-SR 60-14.97Drainage | ASD | Apr 2026 | $448k | $390k |
| Rank 3of 5 | ATB-/TRU Culverts FY2026Drainage | ATB | Apr 2026 | $674k | $546k |
| Rank 4of 6 | LOR-SR 18-01.60Signals | LOR | Mar 2026 | $2.13M | $1.88M |
| Rank 2of 6 | LAK-IR 90 Vacant Rest Areas TPPavement | LAK | Mar 2026 | $6.30M | $6.19M |
| Rank 5of 7 | CUY-York Rd/Bennett RoadMaintenance | CUY | Feb 2026 | $131k | $116k |
| Rank 7of 8 | JEF-US 22-06.99Earthwork | JEF | Jan 2026 | $712k | $508k |
| Rank 3of 4 | BEL-SR 149-15.10Earthwork | BEL | Jan 2026 | $600k | $558k |
| Rank 7of 8 | JEF-SR 213-04.51Earthwork | JEF | Jan 2026 | $2.30M | $1.42M |
| Rank 3of 9 | COL-SR 164-01.66Drainage | COL | Oct 2025 | $486k | $478k |
| Rank 2of 6 | JEF-SR 7-30.92Drainage | JEF | Oct 2025 | $1.57M | $1.47M |
| Rank 5of 6 | TRU-SR 46-07.81 (PARTS 1-4)Signals | TRU | Aug 2025 | $8.02M | $6.21M |
| Rank 3of 5 | HAS-SR 149-01.17Drainage | HAS | Jul 2025 | $1.00M | $711k |
| Rank 3of 3 | HAN-SR 15-20.26Signals | HAN | Jul 2025 | $276k | $222k |
| Rank 2of 4 | TUS-IR 77-01.21Drainage | TUS | Jul 2025 | $396k | $298k |
| Rank 3of 7 | BEL-SR 149-02.11Drainage | BEL | Jul 2025 | $1.35M | $879k |
| Rank 3of 3 | ALL-SR 81-22.23 (PART 1 AND PART 2)Pavement | ALL | May 2025 | $4.78M | $3.49M |
| Wonof 2 | WAY-SR 3/SR 301-07.15/01.60Drainage | WAY | May 2025 | $523k | $523k |
| Rank 2of 2 | WAY-SR 585-02.73Signals | WAY | May 2025 | $2.51M | $1.81M |
| Rank 2of 3 | RIC-US 42/SR 545-00.41/02.36Drainage | RIC | May 2025 | $410k | $370k |
| Rank 5of 5 | DEL-SR 315 Drainage ImprovementsDrainage | DEL | Apr 2025 | $292k | $236k |
| Rank 5of 5 | BEL-SR 149-12.20Earthwork | BEL | Apr 2025 | $225k | $119k |
| Rank 3of 3 | OTT-SR 2-17.69 Slope Stab.Earthwork | OTT | Apr 2025 | $663k | $525k |
| Rank 5of 5 | DEF-US 24-01.61/02.89Earthwork | DEF | Apr 2025 | $5.57M | $2.61M |
| Rank 8of 8 | BEL-SR 148-08.45Earthwork | BEL | Apr 2025 | $863k | $489k |
| Wonof 2 | D04-Culverts FY2025 (West)Drainage | D04 | Apr 2025 | $1.14M | $1.14M |
| Rank 4of 5 | STA-Sippo Valley Trail Bridge 11Bridge | STA | Apr 2025 | $659k | $331k |
| Rank 9of 9 | PER-MR 280-00.10 (Scotch Hill)Other | PER | Mar 2025 | $354k | $135k |
| Rank 4of 5 | JAC-SR 93-07.35Drainage | JAC | Mar 2025 | $528k | $388k |
| Wonof 2 | D12-West Woods Road ReplaceDrainage | D12 | Feb 2025 | $817k | $817k |
| Rank 6of 6 | WAY-SR 95-00.17Drainage | WAY | Feb 2025 | $468k | $245k |
| Rank 3of 4 | SUM-CR 111/CR 25-04.33/04.10Signals | SUM | Feb 2025 | $3.84M | $3.60M |
| Rank 5of 10 | LIC-CR 804-00.96 (Church St)Pavement | LIC | Feb 2025 | $2.67M | $2.14M |
| Rank 9of 10 | LIC-CR 134-02.06Pavement | LIC | Feb 2025 | $3.05M | $2.45M |
| Rank 8of 8 | LIC-CR 327-00.00Safety | LIC | Feb 2025 | $1.43M | $939k |
| Rank 3of 5 | GEA-US 322/SR 44-08.63/14.93Drainage | GEA | Feb 2025 | $1.75M | $1.43M |
| Rank 5of 5 | LOR-US 20-02.05Signals | LOR | Jan 2025 | $2.45M | $1.89M |
| Rank 4of 4 | NOB-SR 821-08.31Pavement | NOB | Jan 2025 | $1.90M | $1.29M |
| Wonof 4 | D04-BH/CR FY2025 (East)Drainage | D04 | Jan 2025 | $2.04M | $2.04M |
| Rank 5of 7 | HUR-SR 18-17.10Signals | HUR | Jan 2025 | $1.85M | $1.52M |
| Rank 5of 8 | RIC-SR 314-02.75Drainage | RIC | Jan 2025 | $407k | $330k |
| Rank 3of 3 | SAN-US 6-17.66 Slide RepairEarthwork | SAN | Jan 2025 | $1.93M | $1.30M |
| Rank 5of 10 | COL-SR 170-20.03Drainage | COL | Jan 2025 | $750k | $600k |
| Rank 7of 7 | MUS-SR 376-05.09Earthwork | MUS | Dec 2024 | $1.07M | $540k |
| Rank 2of 3 | FRA-IR 70-07.38Drainage | FRA | Nov 2024 | $734k | $710k |
| Rank 5of 7 | HOC-US 33-10.12Drainage | HOC | Nov 2024 | $482k | $394k |
| Rank 3of 7 | COL-SR 172-10.80Drainage | COL | Oct 2024 | $390k | $359k |
| Rank 4of 9 | ATH-SR 682-06.07 RoundaboutSignals | ATH | Oct 2024 | $5.23M | $4.75M |
| Rank 4of 6 | WAS-SR 339-08.64Drainage | WAS | Oct 2024 | $1.09M | $844k |
| Rank 2of 3 | JAC-US 35-04.33Drainage | JAC | Oct 2024 | $1.15M | $889k |
| Rank 3of 3 | ERI-SR 2-21.23Drainage | ERI | Sep 2024 | $566k | $412k |
| Rank 5of 6 | CLE-Culverts FY25Drainage | CLE | Sep 2024 | $1.17M | $656k |
| Rank 7of 7 | MAR-SR 746-03.641Drainage | MAR | Aug 2024 | $227k | $140k |
| Rank 5of 6 | HOL-SR 39-14.32Drainage | HOL | Aug 2024 | $184k | $125k |
| Rank 6of 6 | MRG-SR 376-14.59Drainage | MRG | Jul 2024 | $385k | $336k |
| Rank 5of 6 | ERI-SR 4-00.45 GSMEarthwork | ERI | Jul 2024 | $710k | $529k |
| Rank 4of 6 | WAY-SR 57-06.73Drainage | WAY | Jul 2024 | $316k | $278k |
| Rank 3of 3 | WAS-IR 77-17.13Earthwork | WAS | May 2024 | $7.51M | $5.70M |
| Rank 3of 4 | TUS-SR 39-07.62Pavement | TUS | May 2024 | $1.39M | $1.26M |
| Rank 3of 4 | WOO-IR 280-05.07 Slide RepairEarthwork | WOO | May 2024 | $2.55M | $1.60M |
| Rank 5of 5 | WAY-SR 57-10.32Signals | WAY | Apr 2024 | $1.56M | $1.46M |
| Wonof 7 | LIC-MR 297-00.03 (Loop Rd.)Other | LIC | Apr 2024 | $798k | $798k |
| Rank 2of 6 | MED-SR 57/SR 94-09.78/18.84Drainage | MED | Apr 2024 | $566k | $554k |
| Rank 2of 4 | D05-CUL FY2024Drainage | D05 | Apr 2024 | $3.53M | $2.92M |
| Rank 3of 3 | OTT-SR 2-17.57 Landslide RepairEarthwork | OTT | Apr 2024 | $676k | $395k |
| Wonof 3 | GEA-West Woods Road ReplaceDrainage | GEA | Apr 2024 | $769k | $769k |
| Rank 5of 5 | WOO-SR 199-09.36 RoundaboutSignals | WOO | Apr 2024 | $1.96M | $1.43M |
| Rank 2of 4 | MAH-/POR Culverts FY2024Drainage | MAH | Mar 2024 | $709k | $690k |
| Rank 2of 6 | ASD-US 42-14.77 (PART 1 AND PART 2)Signals | ASD | Feb 2024 | $4.20M | $4.17M |
| Wonof 2 | LAK-IR 90/SR 528 SignalsSignals | LAK | Feb 2024 | $1.63M | $1.63M |
| Rank 5of 6 | WYA-US 23-Rest AreasPavement | WYA | Jan 2024 | $5.64M | $5.24M |
| Rank 3of 4 | POR-/TRU-SR 305/VAR-00.72/VARDrainage | POR | Jan 2024 | $2.56M | $2.16M |
| Rank 5of 8 | NOB-SR 145/SR 147-00.38/18.41Drainage | NOB | Jan 2024 | $1.28M | $1.08M |
| Rank 6of 6 | HOC-SR 278-05.47Drainage | HOC | Jan 2024 | $512k | $328k |
| Rank 5of 6 | JAC-SR 139-03.17Drainage | JAC | Jan 2024 | $468k | $345k |
| Rank 2of 3 | KNO-SR 229/SR 308-13.06/00.00Signals | KNO | Jan 2024 | $3.27M | $3.27M |
| Rank 6of 7 | VIN-SR 328-06.42Drainage | VIN | Jan 2024 | $296k | $217k |
| Rank 5of 5 | RIC-SR 61/SR 598-12.74/00.71Drainage | RIC | Jan 2024 | $418k | $322k |
| Rank 7of 8 | NOB-SR 513/SR 564-07.03/00.26Drainage | NOB | Jan 2024 | $1.21M | $868k |
| Rank 2of 3 | WYA-US 23-13.60Pavement | WYA | Jan 2024 | $3.25M | $3.16M |
| Rank 2of 3 | VAN-SR 81-02.55Pavement | VAN | Jan 2024 | $1.42M | $1.41M |
| Rank 3of 4 | MAR-US 23-03.32/03.93, MAR-SR 423-01.60Signals | MAR | Jan 2024 | $1.11M | $999k |
| Rank 5of 5 | LIC-SR 13-00.42Signals | LIC | Jan 2024 | $831k | $738k |
| Rank 7of 7 | HOC-SR 328-06.22Drainage | HOC | Jan 2024 | $427k | $258k |
| Rank 3of 3 | MRG-SR 60-14.11 Center LanePavement | MRG | Dec 2023 | $2.20M | $1.80M |
| Rank 5of 6 | WAS-SR 26-19.32Drainage | WAS | Dec 2023 | $947k | $682k |
| Rank 6of 7 | PRE-MR 112-01.316 N. Maple St.Pavement | PRE | Dec 2023 | $3.29M | $2.65M |
| Rank 8of 9 | NOB-SR 146-01.95Drainage | NOB | Nov 2023 | $426k | $336k |
| Rank 4of 6 | JEF-US 22-13.83/14.71Drainage | JEF | Nov 2023 | $913k | $849k |
| Rank 4of 5 | WOO-IR 475-00.39 Slide RepairEarthwork | WOO | Nov 2023 | $493k | $269k |
| Rank 5of 5 | BUT-SR 122/SR 177-00.56/09.69Drainage | BUT | Nov 2023 | $632k | $496k |
| Rank 6of 6 | HAS-SR 342-03.88Earthwork | HAS | Oct 2023 | $718k | $316k |
| Rank 5of 5 | WAS-SR 339-07.32Drainage | WAS | Oct 2023 | $328k | $236k |
| Rank 2of 4 | CRA-US 30 VAR CULVERTS FY2024Drainage | CRA | Oct 2023 | $488k | $335k |
| Rank 2of 2 | WIL-SR 34-15.50 RelineDrainage | WIL | Sep 2023 | $544k | $533k |
| Rank 3of 7 | MUS-IR 70-07.36Earthwork | MUS | Sep 2023 | $619k | $482k |
| Rank 4of 4 | BEL-US 40-27.30Drainage | BEL | Sep 2023 | $1.15M | $818k |
| Rank 4of 7 | MUS-SR 16-06.70Earthwork | MUS | Aug 2023 | $2.62M | $1.81M |
| Rank 3of 3 | BEL-SR 7-14.49Drainage | BEL | Aug 2023 | $1.56M | $1.43M |
| Wonof 5 | ATB-SR 307-03.21Signals | ATB | Jun 2023 | $2.74M | $2.74M |
| Rank 3of 4 | MOE-SR 78-06.78Drainage | MOE | Jun 2023 | $423k | $318k |
| Rank 2of 5 | D04-Culverts FY2023 (East)Drainage | D04 | May 2023 | $1.10M | $1.09M |
| Wonof 6 | POR-/STA Culverts FY2023Drainage | POR | May 2023 | $768k | $768k |
| Rank 2of 4 | MED-SR 301-05.48Drainage | MED | May 2023 | $328k | $318k |
| Rank 3of 3 | CUY-IR 480-00.09 ReplaceDrainage | CUY | May 2023 | $1.11M | $1.09M |
| Rank 4of 5 | CUY-Building Demo FY2023Building | CUY | May 2023 | $171k | $118k |
| Rank 2of 2 | LAK-Metroparks Lakefront PathSafety | LAK | May 2023 | $723k | $709k |
| Wonof 3 | LIC-CR 813/MR 491-01.03/00.43Drainage | LIC | Apr 2023 | $1.11M | $1.11M |
| Rank 3of 4 | HOL-US 62-20.66Drainage | HOL | Apr 2023 | $152k | $108k |
| Rank 2of 3 | RIC-BH FY2023Drainage | RIC | Apr 2023 | $530k | $436k |
| Rank 3of 5 | WAS-SR 530-05.04Drainage | WAS | Mar 2023 | $351k | $292k |
| Rank 4of 7 | HIG-SR 134-07.82Drainage | HIG | Mar 2023 | $588k | $497k |
| Rank 3of 7 | HIG-SR 753-12.00Drainage | HIG | Mar 2023 | $568k | $475k |
| Rank 3of 7 | NOB-Appalachian Hills WLAPavement | NOB | Mar 2023 | $1.14M | $1.07M |
| Rank 2of 2 | WAY-US 250-28.64Drainage | WAY | Mar 2023 | $219k | $121k |
| Rank 5of 5 | JAC-SR 279-08.76 Culvert ReplaceDrainage | JAC | Mar 2023 | $186k | $149k |
| Rank 4of 4 | CUY-Wolf Road IntersectionSignals | CUY | Mar 2023 | $470k | $330k |
| Rank 8of 10 | HOC-SR 664-16.51Drainage | HOC | Mar 2023 | $639k | $449k |
| Rank 3of 3 | COL-SR 39-20.81Drainage | COL | Feb 2023 | $897k | $798k |
| Rank 8of 8 | NOB-SR 821-18.71Drainage | NOB | Feb 2023 | $314k | $196k |
| Rank 2of 3 | LAK-SR 44-06.05/VAR SlopeEarthwork | LAK | Feb 2023 | $521k | $447k |
| Rank 2of 2 | D01-BM FY23Drainage | D01 | Feb 2023 | $1.22M | $741k |
| Rank 7of 9 | GUE-SR 265-05.68Earthwork | GUE | Feb 2023 | $169k | $124k |
| Rank 3of 3 | COL-SR 7-02.91Earthwork | COL | Feb 2023 | $273k | $198k |
| Rank 2of 5 | POR-IR 76-20.05 SlideEarthwork | POR | Jan 2023 | $2.60M | $2.45M |
| Rank 4of 5 | TRU-US 62-07.47Signals | TRU | Jan 2023 | $2.45M | $1.93M |
| Rank 2of 5 | POR-SR 14-06.43Pavement | POR | Jan 2023 | $1.44M | $1.33M |
| Rank 4of 7 | TUS-SR 800-03.82Other | TUS | Jan 2023 | $841k | $546k |
| Rank 2of 3 | CUY-IR 480-05.40/10.54 RampClear (PART 1 AND PART 2)Pavement | CUY | Jan 2023 | $810k | $675k |
| Rank 3of 6 | CUY-Bennett Road Path TLCISafety | CUY | Jan 2023 | $294k | $278k |
| Rank 3of 3 | MUS-US 22-09.95Drainage | MUS | Jan 2023 | $918k | $704k |
| Rank 6of 6 | BEL-SR 9-18.70Earthwork | BEL | Jan 2023 | $375k | $269k |
| Wonof 5 | CUY-IR 480-18.26 SlopeEarthwork | CUY | Jan 2023 | $272k | $272k |
| Rank 3of 6 | CUY-US 20-03.49 ReplaceDrainage | CUY | Jan 2023 | $1.35M | $977k |
| Rank 6of 6 | MRW-SR 229-00.72Drainage | MRW | Jan 2023 | $483k | $379k |
| Rank 6of 8 | HOL-SR 39/SR 754-11.17/00.16,TUS-SR 93-10.80Drainage | HOL | Dec 2022 | $2.04M | $1.58M |
| Rank 5of 5 | BEL-SR 149-01.92Maintenance | BEL | Dec 2022 | $1.33M | $942k |
| Rank 3of 5 | COL-East Lincoln St Conn TrailSafety | COL | Dec 2022 | $1.17M | $1.06M |
| Rank 2of 2 | D01-Erosion Repair FY23Earthwork | D01 | Dec 2022 | $4.84M | $3.19M |
| Rank 6of 6 | MOT-Olentangy Drive Bridge ReplBridge | MOT | Dec 2022 | $782k | $480k |
| Rank 3of 7 | STA-SR 43-20.20Pavement | STA | Dec 2022 | $1.39M | $1.23M |
| Rank 5of 5 | SAN-SR 600-03.02Drainage | SAN | Nov 2022 | $489k | $387k |
| Rank 4of 4 | SAN-SR 510-01.17 Brdg ReplDrainage | SAN | Nov 2022 | $449k | $338k |
| Rank 6of 7 | COL-SR 14-05.71Drainage | COL | Nov 2022 | $621k | $377k |
| Rank 2of 2 | PUT-SR 65-10.73Drainage | PUT | Nov 2022 | $689k | $524k |
| Rank 6of 6 | BUT-CULVERTS FY23Drainage | BUT | Nov 2022 | $902k | $476k |
| Rank 2of 7 | POR-SR 43-18.65Pavement | POR | Oct 2022 | $6.23M | $5.90M |
| Rank 5of 10 | CUY-US 422-18.74/VAR SlideEarthwork | CUY | Sep 2022 | $1.02M | $846k |
| Rank 2of 2 | GEA-SR 306-04.45Pavement | GEA | Sep 2022 | $2.35M | $2.28M |
| Rank 8of 8 | HOC-SR 180-05.36Drainage | HOC | Sep 2022 | $1.31M | $799k |
| Rank 2of 4 | PIC-SR 56-28.27Drainage | PIC | Sep 2022 | $530k | $478k |
| Rank 8of 8 | MAR-SR 423-02.14Drainage | MAR | Sep 2022 | $926k | $556k |
| Rank 2of 2 | GEA-US 322-01.64/VARDrainage | GEA | Sep 2022 | $4.55M | $3.82M |
| Rank 4of 4 | HAS-SR 646-06.33Pavement | HAS | Sep 2022 | $879k | $684k |
| Rank 3of 5 | GAL-SR 553-00.61Earthwork | GAL | Aug 2022 | $289k | $196k |
| Wonof 1 | D07-BH-FY23Maintenance | D07 | Aug 2022 | $382k | $382k |
| Rank 6of 7 | D10-CR FY2023Drainage | D10 | Aug 2022 | $330k | $106k |
| Rank 3of 3 | LUC-SR 2-13.77 DemolitionOther | LUC | Aug 2022 | $188k | $80k |
| Rank 4of 5 | JEF-SR 7-03.49Drainage | JEF | Aug 2022 | $280k | $256k |
| Rank 10of 10 | MUS-IR 70-25.90Earthwork | MUS | Aug 2022 | $948k | $642k |
| Rank 6of 6 | KNO-SR 229-14.80Maintenance | KNO | Aug 2022 | $1.92M | $1.09M |
| Rank 2of 2 | WAY-IR 71-(03.98)(05.49), MED-SR 57-03.41Drainage | WAY | Jul 2022 | $910k | $690k |
| Rank 4of 4 | CRA-SR 96-03.88/04.18Drainage | CRA | Jul 2022 | $488k | $310k |
| Rank 2of 3 | TUS-IR 77-31.54Pavement | TUS | Jun 2022 | $641k | $556k |
| Rank 2of 2 | OTT-SR 269-04.55 CulvertDrainage | OTT | Jun 2022 | $383k | $295k |
| Rank 2of 6 | D04-Culverts FY2022 (PART 1 AND PART 2)Drainage | D04 | May 2022 | $1.78M | $1.55M |
| Rank 2of 3 | CUY-IR 480-21.38 SlopeEarthwork | CUY | May 2022 | $141k | $134k |
| Wonof 2 | LOR-SR 57-06.58Drainage | LOR | May 2022 | $343k | $343k |
| Rank 4of 5 | JEF-SR 7-04.00 Truck Parking AreaPavement | JEF | May 2022 | $716k | $594k |
| Rank 6of 7 | MAH-McGaffney St Extension Ph 2Other | MAH | May 2022 | $421k | $344k |
| Rank 2of 6 | COL-SR 45-03.36Drainage | COL | May 2022 | $615k | $557k |
| Rank 2of 2 | WAY-US 30/SR 57-(06.63)(06.98)/01.80Drainage | WAY | May 2022 | $294k | $233k |
| Rank 5of 5 | HOL-SR 520-09.83Drainage | HOL | Apr 2022 | $532k | $406k |
| Rank 3of 3 | STA-US 62-05.10 SRTSSafety | STA | Apr 2022 | $403k | $326k |
| Rank 3of 3 | CUY-IR 480-12.07 WB SlideEarthwork | CUY | Mar 2022 | $263k | $188k |
| Rank 5of 5 | ASD-/HUR-US 250/SR 13-24.67/02.47Drainage | ASD | Mar 2022 | $762k | $485k |
| Wonof 3 | STA-SR 21-02.80Drainage | STA | Mar 2022 | $617k | $617k |
| Rank 5of 5 | TUS-SR 212-10.80Drainage | TUS | Feb 2022 | $824k | $608k |
| Wonof 1 | MED-US 42/SR 252-06.10/05.51Drainage | MED | Feb 2022 | $534k | $534k |
| Rank 3of 3 | GEA-SR 528-15.26 ReplaceDrainage | GEA | Jan 2022 | $676k | $544k |
| Rank 4of 6 | CUY-Ashton Lane BridgeBridge | CUY | Jan 2022 | $797k | $534k |
| Rank 2of 2 | CUY-SR 82-09.66 ReplaceDrainage | CUY | Jan 2022 | $1.64M | $1.23M |
| Rank 6of 7 | STA-SR 43-09.08 DrainageDrainage | STA | Jan 2022 | $444k | $336k |
| Rank 2of 3 | LOR-SR 83-21.40Bridge | LOR | Jan 2022 | $1.19M | $1.11M |
| Wonof 3 | VAN-SR 116-02.16/11.67Drainage | VAN | Jan 2022 | $636k | $636k |
| Rank 5of 5 | CHP-ODNR Kiser Lake State ParkDrainage | CHP | Dec 2021 | $97k | $45k |
| Rank 3of 4 | WYA-SR 37-09.74/10.48(MAR)Drainage | WYA | Dec 2021 | $557k | $395k |
| Wonof 3 | TRU-SR 5-06.41/06.63Earthwork | TRU | Dec 2021 | $583k | $583k |
| Rank 2of 3 | HUR-SR 162-17.42Drainage | HUR | Dec 2021 | $368k | $309k |
| Rank 4of 4 | GEA-Building Demo FY2022Building | GEA | Dec 2021 | $70k | $39k |
| Rank 3of 8 | PIK-US 23-15.35 LinerDrainage | PIK | Dec 2021 | $177k | $113k |
| Rank 7of 7 | BEL-SR 800-13.15Earthwork | BEL | Nov 2021 | $255k | $167k |
| Rank 4of 5 | BUT-Culverts FY22Drainage | BUT | Nov 2021 | $476k | $272k |
| Rank 3of 4 | GEA-US 322-04.36 CulvertDrainage | GEA | Nov 2021 | $496k | $367k |
| Rank 6of 6 | BEL-SR 800-00.70Earthwork | BEL | Nov 2021 | $344k | $206k |
| Rank 8of 8 | BEL-SR 147-00.07Earthwork | BEL | Nov 2021 | $218k | $126k |
| Rank 4of 5 | WAS-IR 77-03.45Pavement | WAS | Oct 2021 | $2.16M | $1.97M |
| Rank 7of 8 | CLI-SR 28/SR 124-04.52/05.47/00.54Drainage | CLI | Oct 2021 | $897k | $749k |
| Rank 6of 6 | DEF-US 24-03.20Earthwork | DEF | Oct 2021 | $1.13M | $711k |
| Rank 4of 5 | CUY-IR 90-18.22/VARDrainage | CUY | Sep 2021 | $5.16M | $3.59M |
| Rank 3of 4 | CAR-SR 542-04.20/04.28Drainage | CAR | Sep 2021 | $430k | $347k |
| Rank 4of 10 | CLE-/WAR-SR 132/SR 123-21.21/01.51Drainage | CLE | Sep 2021 | $744k | $668k |
| Rank 4of 4 | D05-CUL FY2022Drainage | D05 | Sep 2021 | $1.14M | $740k |
| Rank 4of 7 | ATB-SR 45-19.47Signals | ATB | Sep 2021 | $1.56M | $1.40M |
| Rank 4of 4 | HOC-SR 664-15.65Signals | HOC | Sep 2021 | $759k | $692k |
| Rank 2of 7 | STA-SR 687-03.03Signals | STA | Sep 2021 | $1.26M | $1.15M |
| Rank 4of 6 | GEA-US 422-00.30 SlopeEarthwork | GEA | Sep 2021 | $321k | $284k |
| Rank 5of 7 | SCI-SR 104-08.15 LandslideDrainage | SCI | Aug 2021 | $938k | $723k |
| Rank 4of 5 | HAM-SR 264-Culverts FY22Drainage | HAM | Aug 2021 | $195k | $163k |
| Rank 4of 5 | COL-SR 7-17.74Earthwork | COL | Aug 2021 | $288k | $242k |
| Rank 3of 3 | CUY-US 422-04.34 SafetySignals | CUY | Aug 2021 | $3.17M | $2.50M |
| Rank 4of 5 | HOL-US 62/SR 60-05.24/06.60Drainage | HOL | Aug 2021 | $576k | $447k |
| Rank 5of 8 | ATH-US 33-18.48Earthwork | ATH | Aug 2021 | $2.90M | $2.25M |
| Rank 6of 7 | GUE-US 40-14.31Earthwork | GUE | Jul 2021 | $1.59M | $836k |
| Rank 4of 8 | MOE-CR 12-18.00Bridge | MOE | Jul 2021 | $346k | $329k |
| Wonof 6 | POR-SR 82-05.84Signals | POR | Jul 2021 | $1.95M | $1.95M |
| Rank 8of 9 | ATH-Embrey StreetBridge | ATH | Jul 2021 | $817k | $472k |
| Rank 3of 5 | CRA-SR 598-00.46 (Galion)Pavement | CRA | Jul 2021 | $4.94M | $4.24M |
| Rank 5of 5 | MED-SR 18-15.99Signals | MED | Jul 2021 | $9.15M | $7.59M |
| Rank 3of 5 | PUT-SR 109-02.63Maintenance | PUT | Jul 2021 | $272k | $223k |
| Rank 5of 6 | BRO-US 68-30.82 SafetySignals | BRO | Jun 2021 | $2.19M | $1.96M |
| Rank 5of 7 | HAS-SR 151-21.12/25.34Drainage | HAS | May 2021 | $573k | $454k |
| Rank 4of 9 | CLE-Bike Trail Culvert FY21Drainage | CLE | May 2021 | $205k | $163k |
| Rank 7of 8 | SCI-SR 348-06.55Bridge | SCI | May 2021 | $633k | $434k |
| Rank 3of 3 | FRA-SR 104-04.43Pavement | FRA | May 2021 | $1.25M | $1.09M |
| Rank 4of 5 | TUS-IR 77-11.52/12.84Drainage | TUS | May 2021 | $953k | $778k |
| Rank 4of 7 | MED-SR 94-07.66Bridge | MED | May 2021 | $745k | $686k |
| Rank 6of 8 | FAY-SR 41-00.47/02.32Drainage | FAY | May 2021 | $820k | $648k |
| Rank 5of 5 | SCI-US 23-03.71Drainage | SCI | May 2021 | $257k | $196k |
| Rank 3of 5 | BRO-US 52-02.51Earthwork | BRO | May 2021 | $409k | $310k |
| Rank 6of 6 | ALL-US 30-16.19Signals | ALL | May 2021 | $2.54M | $2.29M |
| Rank 3of 3 | WAY-US 30-20.15Signals | WAY | May 2021 | $1.04M | $886k |
| Rank 5of 8 | MED-SR 3-09.04Signals | MED | Apr 2021 | $1.17M | $1.09M |
| Rank 3of 3 | MER-SR 117/SR 707-07.21/06.37Drainage | MER | Apr 2021 | $417k | $343k |
| Rank 4of 4 | ROS-US 35-32.62 OH20-01Earthwork | ROS | Apr 2021 | $1.69M | $1.29M |
| Rank 6of 6 | MIA-CR 25A-03.54Pavement | MIA | Apr 2021 | $1.62M | $1.36M |
| Rank 7of 8 | MOE-SR 537-03.40Other | MOE | Apr 2021 | $13.7M | $9.46M |
| Rank 3of 4 | GEA-US 422-00.03 SlideEarthwork | GEA | Apr 2021 | $263k | $212k |
| Rank 3of 5 | ASD-US 42/SR 60-15.05/27.40Drainage | ASD | Apr 2021 | $356k | $314k |
| Wonof 1 | DAR-SR 705-05.60/12.04Drainage | DAR | Apr 2021 | $554k | $554k |
| Wonof 4 | STA-/POR Culverts FY2021Drainage | STA | Apr 2021 | $637k | $637k |
| Rank 2of 3 | COL-SR 45-01.51Drainage | COL | Apr 2021 | $265k | $249k |
| Rank 2of 6 | ATB-Culverts FY2021Drainage | ATB | Apr 2021 | $1.22M | $1.06M |
| Wonof 3 | GEA-US 422-14.90 CulvertDrainage | GEA | Apr 2021 | $423k | $423k |
| Rank 5of 7 | STA-SR 241-09.71Pavement | STA | Apr 2021 | $8.37M | $7.19M |
| Rank 7of 8 | SEN-SR 19/SR 101-09.96/11.82/10.15 Stru (PART 1 AND PART 2)Drainage | SEN | Apr 2021 | $1.03M | $837k |
| Rank 3of 6 | LOR-SR 113-03.75 Baumhart SftySignals | LOR | Apr 2021 | $1.80M | $1.51M |
| Rank 5of 7 | SUM-IR 77-31.97Maintenance | SUM | Apr 2021 | $514k | $316k |
| Rank 5of 5 | PAU-SR 111-23.69Earthwork | PAU | Apr 2021 | $443k | $298k |
| Rank 5of 5 | MOT-US 35-07.21/08.01Drainage | MOT | Apr 2021 | $255k | $176k |
| Rank 4of 7 | BUT-SR 4-13.90Signals | BUT | Apr 2021 | $771k | $648k |
| Wonof 8 | STA-IR 77-01.27Earthwork | STA | Apr 2021 | $387k | $387k |
| Wonof 4 | TRU-Culverts FY2021Drainage | TRU | Apr 2021 | $1.04M | $1.04M |
| Rank 3of 4 | ATB-US 20-21.86 (PART 1, PART 2, PART 3)Pavement | ATB | Mar 2021 | $5.18M | $4.80M |
| Rank 7of 7 | BUT-SR 4-10.83Signals | BUT | Mar 2021 | $2.69M | $1.75M |
| Rank 5of 6 | CLE-R Culverts FY21Drainage | CLE | Mar 2021 | $568k | $446k |
| Wonof 4 | STA-SR 687-00.91Pavement | STA | Mar 2021 | $2.50M | $2.50M |
| Rank 9of 9 | MRG-SR 266-11.46Drainage | MRG | Mar 2021 | $769k | $661k |
| Rank 6of 7 | LAW-SR 775-(15.45)(15.70)Bridge | LAW | Mar 2021 | $1.70M | $1.61M |
| Wonof 2 | MAH-SR 164-00.88/02.84Drainage | MAH | Mar 2021 | $765k | $765k |
| Rank 3of 5 | ASD-SR 302-01.19Drainage | ASD | Mar 2021 | $264k | $255k |
| Rank 5of 5 | ATH-SR 56-04.97Earthwork | ATH | Mar 2021 | $282k | $191k |
| Rank 4of 4 | STA-SR 183-09.84Pavement | STA | Mar 2021 | $1.33M | $1.13M |
| Rank 9of 9 | BRO-SR 505-05.97Drainage | BRO | Feb 2021 | $608k | $444k |
| Rank 3of 4 | BEL-SR 147-04.45Signals | BEL | Feb 2021 | $197k | $186k |
| Rank 3of 8 | FAI-TR 201-01.10Pavement | FAI | Feb 2021 | $1.55M | $1.34M |
| Rank 5of 5 | PAU-SR 49-00.00Pavement | PAU | Feb 2021 | $1.66M | $1.28M |
| Rank 3of 10 | POR-SR 14-03.65Pavement | POR | Feb 2021 | $4.97M | $4.63M |
| Rank 4of 4 | RIC-US 30-17.11Pavement | RIC | Feb 2021 | $568k | $430k |
| Rank 3of 3 | WOO-SR 199-17.68 Brdg Repl.Drainage | WOO | Feb 2021 | $358k | $289k |
| Rank 3of 7 | OTT-SR 105-04.11 Slide repairEarthwork | OTT | Feb 2021 | $231k | $166k |
| Wonof 5 | KNO-SR 13-11.71 (Mt Vern Safety)Safety | KNO | Feb 2021 | $1.55M | $1.55M |
| Rank 3of 3 | CUY-US 322-15.59 SafetySignals | CUY | Feb 2021 | $624k | $542k |
| Rank 2of 6 | ROS-SR 327-03.88Drainage | ROS | Feb 2021 | $244k | $233k |
| Rank 7of 10 | SCI-Shawnee State Forest CulvertDrainage | SCI | Feb 2021 | $282k | $133k |
| Rank 2of 2 | PRE-IR 70 Culverts FY21Drainage | PRE | Feb 2021 | $480k | $325k |
| Rank 5of 9 | STA-SR 619-13.15Signals | STA | Feb 2021 | $1.91M | $1.73M |
| Rank 5of 5 | POR-Tallmadge Rd (CR 18)Pavement | POR | Feb 2021 | $7.46M | $5.69M |
| Rank 3of 6 | HUR-CULVERT FY2021Drainage | HUR | Feb 2021 | $550k | $419k |
| Rank 6of 10 | MOE-WNF Drainage Improvement Ph1Drainage | MOE | Feb 2021 | $486k | $350k |
| Rank 6of 6 | D10-Culverts FY2021Drainage | D10 | Feb 2021 | $448k | $198k |
| Rank 3of 4 | GAL-SR 7-05.22Pavement | GAL | Jan 2021 | $9.26M | $8.18M |
| Rank 3of 4 | VIN-SR 677-03.02Drainage | VIN | Jan 2021 | $488k | $356k |
| Rank 4of 5 | JAC-SR 139-02.70Drainage | JAC | Jan 2021 | $297k | $218k |
| Rank 7of 9 | SCI-SR 348-09.42Drainage | SCI | Jan 2021 | $582k | $456k |
| Rank 6of 6 | NOB-SR 821-18.31Earthwork | NOB | Jan 2021 | $2.66M | $1.64M |
| Rank 3of 9 | LIC-US 40-14.90Drainage | LIC | Jan 2021 | $523k | $444k |
| Rank 10of 10 | HOL-US 62/VAR-05.06/VARDrainage | HOL | Jan 2021 | $542k | $356k |
| Rank 8of 8 | HAM-IR 275-34.70Earthwork | HAM | Jan 2021 | $859k | $645k |
| Rank 5of 6 | CUY-SR 175-13.31 SafetySafety | CUY | Jan 2021 | $998k | $790k |
| Rank 7of 9 | FAI-CR 56-00.23 (SRTS)Safety | FAI | Jan 2021 | $420k | $316k |
| Rank 6of 8 | D09-CR-FY2021Drainage | D09 | Jan 2021 | $1.03M | $575k |
| Rank 5of 6 | CLE-IR 275-07.71Earthwork | CLE | Jan 2021 | $1.24M | $839k |
| Rank 4of 6 | WAR-US 22-07.12Pavement | WAR | Jan 2021 | $1.29M | $1.25M |
| Rank 4of 4 | GRE-Culverts FY21Drainage | GRE | Jan 2021 | $612k | $244k |
| Wonof 6 | GEA-US 322-07.78 SafetySafety | GEA | Jan 2021 | $1.89M | $1.89M |
| Rank 4of 7 | PRE-SR 177 -00.70Signals | PRE | Jan 2021 | $684k | $599k |
| Wonof 4 | MER-SR 219-12.10Drainage | MER | Jan 2021 | $272k | $272k |
| Rank 5of 10 | GEA-SR 166-01.08Drainage | GEA | Jan 2021 | $234k | $188k |
Source: public.bid_results, ODOT bid tabs. Bidder strings are normalized to upper-case but not yet entity-resolved, so related firms (e.g. "Shelly Company" vs "Shelly & Sands") are shown separately.