FRA-W. Broad Gas Lines
FRA County · est $0.4M
Bid dateFriday, October 12—
FRA County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 11 more items below.
| Item | Quantity | R1Premier Energy Services LLC | R2Swartz Mowing INC | R3Craig Edward Susany INC | % of bid |
|---|---|---|---|---|---|
| 690E98100 SPECIAL - CONDUIT, DRILLED, HDPE, 6" | 1,690 FT | $74.44 | $93.00 | $125 | 36% |
| 690E98100 SPECIAL - CONDUIT, DRILLED, HDPE, 4" | 701 FT | $74.44 | $53.00 | $100 | 15% |
| 690E98000 SPECIAL - CONNECTION (BUILDING SERVICE ENTRANCE) | 4 EACH | $7,999 | $3,000 | $8,000 | 9% |
| 690E98100 SPECIAL -CONDUIT, HDPE, DR 11, 6" | 1,690 FT | $15.20 | $15.50 | $125 | 7% |
| 690E98100 SPECIAL - CONDUIT, BLACK IRON, 4" | 125 FT | $145 | $38.50 | $100 | 5% |
| 690E98000 SPECIAL - CONNECTION (GAS METER HOUSE) | 1 EACH | $17,500 | $2,700 | $12,000 | 5% |
| 690E98100 SPECIAL -CONDUIT, HDPE, DR 11, 4" | 701 FT | $15.20 |
| Item | Quantity | R1Premier Energy Services LLC | R2Swartz Mowing INC | R3Craig Edward Susany INC |
|---|---|---|---|---|
| 201E23000 TREE REMOVED, 30"MISSING SUPP DESC | 1 EACH | $1,153 | $4,000 | $10,000 |
| 204E10000 SUBGRADE COMPACTION | 77 SY | $8.00 | $950 | $20.00 |
| 204E45000 PROOF ROLLING | 0.04 HOUR | $12,500 | $2,000 | $10,000 |
| 609E26000 CURB, TYPE 6 | 64 FT | $29.50 | $38.00 | $100 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 76 FT | $8.00 | $89.50 | $25.00 |
| 304E20000 AGGREGATE BASE |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $13.50 |
| $100 |
| 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $20,000 | $10,000 | 3% |
| 690E98100 SPECIAL - CONDUIT, DRILLED, HDPE, 2" | 123 FT | $74.44 | $28.00 | $75.00 | 3% |
| 201E21800 TREE REMOVED, 18"MISSING SUPP DESC | 7 EACH | $1,153 | $2,500 | $2,500 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,040 | $2,403 | $35,000 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $11,500 | $1,000 | 1% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 202E23000 PAVEMENT REMOVED | 154 SY | $29.85 | $56.00 | $75.00 | 1% |
| 614E18010 MAINTAINING TRAFFIC, MISC.:STEEL PLATES | 400 SF | $11.00 | $7.50 | $25.00 | 1% |
| 614E18010 MAINTAINING TRAFFIC, MISC.:STEEL PLATE | 400 SF | $11.00 | $7.50 | $25.00 | 1% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 9 CY | $467 | $1,300 | $1,000 | 1% |
| 202E32000 CURB REMOVED | 64 FT | $40.22 | $38.00 | $15.00 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $17,000 | $10,000 | 1% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (4 CY | $547 | $900 | $1,000 | 1% |
| 13 CY |
| $167 |
| $1,350 |
| $300 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 3 CY | $652 | $850 | $1,000 |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 15 CY | $125 | $250 | $300 |
| 690E98100 SPECIAL - CONDUIT, HDPE, DR 11, 2" | 123 FT | $15.20 | $10.50 | $75.00 |
| 644E01200 PARKING LOT STALL MARKING | 48 FT | $6.50 | $37.50 | $25.00 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $1,000 | $9,800 | $1,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 690E98100 SPECIAL - CONDUIT, DRILLED, HDPE, 6" | 1,690 FT | $74.44 | $126k | 34% |
| 690E98100 SPECIAL - CONDUIT, DRILLED, HDPE, 4" | 701 FT | $74.44 | $52k | 14% |
| 690E98000 SPECIAL - CONNECTION (BUILDING SERVICE ENTRANCE) | 4 EACH | $7,999 | $32k | 9% |
| 690E98100 SPECIAL -CONDUIT, HDPE, DR 11, 6" | 1,690 FT | $15.2 | $26k | 7% |
| 690E98100 SPECIAL - CONDUIT, BLACK IRON, 4" | 125 FT | $144.58 | $18k | 5% |
| 690E98000 SPECIAL - CONNECTION (GAS METER HOUSE) | 1 EACH | $17,500 | $18k | 5% |
| 690E98100 SPECIAL -CONDUIT, HDPE, DR 11, 4" | 701 FT | $15.2 | $11k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 3% |
| 690E98100 SPECIAL - CONDUIT, DRILLED, HDPE, 2" | 123 FT | $74.44 | $9k | 3% |
| 201E21800 TREE REMOVED, 18"MISSING SUPP DESC | 7 EACH | $1,153 | $8k | 2% |