LAW-SR 7-02.17 Phase 2
LAW County · est $179M
Bid dateThursday, December 12—
LAW County · est $179M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 624 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2Trumbull Corporation/ruhlin Company | R3Triton Construction INC | R4Beaver Excavating Company | % of bid |
|---|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 4,929,854 CY | $4.69 | $5.05 | $5.50 | $8.22 | 31% |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 40,850 CY | $188 | $194 | $188 | $194 | 10% |
| 624E10000 MOBILIZATION | 1 LS | $6,430,000 | $6,649,258 | $7,150,000 | $8,375,000 | 9% |
| 203E20000 EMBANKMENT | 4,531,429 CY | $1.04 | $1.50 | $1.20 | $2.15 | 6% |
| 832E30000 EROSION CONTROL | 4,420,289 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 6% |
| 606E10210 SPECIAL - NOISE BARRIER (REFLECTIVE) | 114,072 SF | $33.00 | $28.50 |
| Item | Quantity | R1Kokosing Construction Company INC | R2Trumbull Corporation/ruhlin Company | R3Triton Construction INC | R4Beaver Excavating Company |
|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 1 EACH | $1,000 | $763 | $500 | $1,000 |
| 202E23000 PAVEMENT REMOVED | 50,306 SY | $2.50 | $1.59 | $10.00 | $5.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 2,536 FT | $25.00 | $19.78 | $25.00 | $33.00 |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 1,033 FT | $70.00 | $80.21 | $40.00 | $53.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $40.00 |
| $33.75 |
| 5% |
| 304E20000 AGGREGATE BASE | 42,620 CY | $85.00 | $74.66 | $56.80 | $87.17 | 5% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 15,343 CY | $208 | $208 | $208 | $208 | 4% |
| 513E10281 STRUCTURAL STEEL MEMBERS, LEVEL 4, AS PER PLAN | 907,132 LB | $2.80 | $2.35 | $2.35 | $2.75 | 3% |
| 611E97400 CONDUIT, MISC.: 22' DIA., TYPE A, 707.03, AS PER P | 452 FT | $5,500 | $4,572 | $5,700 | $3,955 | 3% |
| 442E10300 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 9,691 CY | $243 | $243 | $243 | $243 | 3% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $1,340,000 | $4,019,650 | $4,541,448 | $5,567,000 | 2% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 99,751 FT | $13.00 | $11.65 | $9.45 | $15.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,173,200 | $500,000 | $450,000 | $1,200,000 | 2% |
| 203E20001 EMBANKMENT, AS PER PLAN (TYPE C) | 582,155 CY | $1.93 | $3.50 | $2.50 | $3.00 | 2% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $1,100,000 | $2,210,825 | $725,000 | $1,500,000 | 1% |
| 601E21100 SLOPE PROTECTION, MISC.: SEEDING AND EROSION CONTR | 11,199 SY | $96.00 | $4.31 | $94.00 | $70.00 | 1% |
| 863E00801 REINFORCED EMBANKMENT, AS PER PLAN | 524,387 CY | $1.90 | $1.50 | $1.60 | $8.00 | 1% |
| 863E00100 GEOGRID, TYPE P1 | 482,309 SY | $1.85 | $2.04 | $3.00 | $2.00 | 1% |
| 659E00540 SEEDING AND MULCHING, CLASS 3C | 1,182,427 SY | $0.75 | $0.78 | $0.78 | $0.78 | 1% |
| 6,500 FT |
| $2.30 |
| $2.40 |
| $2.30 |
| $2.30 |
| 202E58000 MANHOLE REMOVED | 2 EACH | $1,000 | $944 | $1,000 | $950 |
| 202E58100 CATCH BASIN REMOVED | 6 EACH | $1,200 | $1,011 | $650 | $325 |
| 202E64000 SPECIAL - PLUGGING AND VENTING GAS AND/OR OIL WELL | 3 EACH | $14,000 | $10,000 | $160,000 | $100,000 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 21" AND | 99 FT | $67.00 | $48.57 | $150 | $36.00 |
| 202E75000 FENCE REMOVED | 6,799 FT | $3.07 | $3.00 | $5.80 | $3.00 |
| 202E75250 GATE REMOVED | 1 EACH | $195 | $195 | $350 | $200 |
| 203E07510 SPECIAL - PIEZOMETER | 12 EACH | $6,390 | $8,030 | $5,000 | $11,500 |
| 203E22000 EMBANKMENT, USING NATURAL SOILS, 703.16.A | 7,459 CY | $1.40 | $3.90 | $5.00 | $1.00 |
| 204E10000 SUBGRADE COMPACTION | 328,438 SY | $1.75 | $2.62 | $1.30 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 16,878 CY | $5.50 | $5.95 | $11.00 | $23.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 16,878 CY | $40.00 | $78.38 | $87.00 | $72.00 |
| 204E45000 PROOF ROLLING | 110 HOUR | $250 | $338 | $230 | $500 |
| 204E50000 GEOTEXTILE FABRIC | 68,575 SY | $1.80 | $1.84 | $2.30 | $2.00 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 258 STA | $185 | $624 | $300 | $900 |
| 606E15050 GUARDRAIL, TYPE MGS | 20,261.2 FT | $16.80 | $20.00 | $16.80 | $16.80 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 6,137.5 FT | $18.16 | $22.40 | $18.16 | $18.16 |
| 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS | 375 FT | $30.28 | $32.80 | $30.28 | $30.28 |
| 606E17350 GUARDRAIL, TYPE MGS, 25' LONG-SPAN | 150 FT | $17.92 | $24.40 | $17.92 | $17.92 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (MASH 2016) | 36 EACH | $2,240 | $2,950 | $2,240 | $2,240 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 22 EACH | $1,100 | $1,425 | $1,050 | $1,050 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 31 EACH | $2,000 | $2,920 | $2,000 | $2,000 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 5 EACH | $350 | $620 | $350 | $350 |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 2 EACH | $4,350 | $4,350 | $7,000 | $6,689 |
| 606E60022 IMPACT ATTENUATOR, TYPE 2 (UNIDIRECTIONAL) | 55 MP, (1 EACH | $60,166 | $58,000 | $50,000 | $60,339 |
| 607E15000 FENCE, TYPE 47 | 43,587 FT | $16.33 | $16.40 | $22.00 | $16.40 |
| 607E23000 FENCE, TYPE CLT | 15,174 FT | $26.30 | $26.30 | $38.00 | $26.30 |
| 607E98100 FENCE, MISC.: GATE, AS PER PLAN | 4 EACH | $1,825 | $1,825 | $3,000 | $1,825 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 8,076 FT | $75.00 | $88.57 | $100 | $90.00 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 4 EACH | $4,500 | $4,259 | $5,000 | $9,000 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 3 EACH | $1,500 | $1,629 | $1,400 | $1,600 |
| 623E40500 REFERENCE MONUMENT, TYPE A | 106 EACH | $600 | $575 | $1,400 | $450 |
| 623E40900 MONUMENT, MISC.: RIGHT-OF-WAY MONUMENT RESET | 30 EACH | $125 | $201 | $800 | $635 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $22,000 | $10,000 | $10,000 | $2,000 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $13,000 | $10,000 | $10,000 | $2,500 |
| 625E32000 GROUND ROD | 4 EACH | $350 | $285 | $285 | $285 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 4 EACH | $275 | $881 | $250 | $300 |
| 863E00300 GEOGRID, TYPE P3 | 171,133 SY | $2.00 | $2.41 | $3.00 | $2.10 |
| 863E00600 GEOGRID, TYPE S1 | 162,167 SY | $2.00 | $1.55 | $3.00 | $1.78 |
| 208E10000 PRE-BLAST CONDITION SURVEY | 1 LS | $130,000 | $134,708 | $200,000 | $70,000 |
| 208E12000 BLASTING CONSULTANT | 1 LS | $56,560 | $49,000 | $50,000 | $150,000 |
| 208E13000 AIR BLAST AND NOISE CONTROL | 1 LS | $14,700 | $1.37 | $83,000 | $25,000 |
| 208E14000 VIBRATION CONTROL AND MONITORING | 1 LS | $14,700 | $56,603 | $83,000 | $25,000 |
| 208E16000 HYDROLOGIST | 1 LS | $17,875 | $9,500 | $80,000 | $55,000 |
| 606E15200 GUARDRAIL, TYPE MGS HALF POST SPACING WITH LONG PO | 137.5 FT | $27.16 | $29.60 | $27.16 | $27.16 |
| 606E60028 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL) | 30 MPH, (1 EACH | $30,800 | $26,750 | $28,693 | $30,800 |
| 622E10121 CONCRETE BARRIER, SINGLE SLOPE, TYPE C, AS PER PLA | 34 FT | $475 | $448 | $350 | $600 |
| 622E24840 CONCRETE BARRIER END SECTION, TYPE B | 1 EACH | $10,000 | $8,092 | $5,000 | $10,500 |
| 601E11000 RIPRAP, TYPE D | 117 SY | $450 | $385 | $172 | $500 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 175 SY | $170 | $249 | $80.00 | $205 |
| 601E23000 ARTICULATING CONCRETE BLOCK REVETMENT SYSTEM, TYPE | 2,821 SY | $203 | $267 | $210 | $225 |
| 601E27001 DUMPED ROCK FILL, TYPE C, AS PER PLAN | 14 CY | $145 | $118 | $200 | $110 |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 525 CY | $200 | $229 | $105 | $155 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 3,163 CY | $105 | $110 | $100 | $130 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 3,407 CY | $105 | $128 | $100 | $133 |
| 601E32300 ROCK CHANNEL PROTECTION, TYPE D WITH FILTER | 78 CY | $105 | $101 | $170 | $115 |
| 601E34200 ROCK CHANNEL PROTECTION, TYPE C WITHOUT FILTER | 1,247 CY | $105 | $117 | $100 | $65.00 |
| 601E45030 DETENTION BASIN FILTER | 2,157 SY | $34.00 | $20.64 | $33.00 | $26.50 |
| 659E00100 SOIL ANALYSIS TEST | 14 EACH | $200 | $25.00 | $25.00 | $25.00 |
| 659E00300 TOPSOIL | 468 CY | $21.00 | $60.00 | $30.00 | $45.00 |
| 659E00301 TOPSOIL, AS PER PLAN | 1,741 CY | $37.00 | $60.00 | $45.00 | $30.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 59,221 SY | $0.75 | $0.78 | $0.78 | $0.78 |
| 659E15000 INTER-SEEDING | 59,221 SY | $0.75 | $0.01 | $0.01 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 166 TON | $1,300 | $250 | $250 | $250 |
| 659E31000 LIME | 244.71 ACRE | $150 | $25.00 | $25.00 | $25.00 |
| 659E35000 WATER | 6,556 MGAL | $1.00 | $0.01 | $0.01 | $0.01 |
| 659E40000 MOWING | 2,665 MSF | $12.00 | $18.00 | $1.50 | $3.75 |
| 670E00500 SLOPE EROSION PROTECTION | 9,135 SY | $2.50 | $1.25 | $1.25 | $1.25 |
| 670E00700 DITCH EROSION PROTECTION | 10,580 SY | $2.50 | $1.25 | $1.25 | $1.25 |
| 670E00720 DITCH EROSION PROTECTION MAT, TYPE B | 13,207 SY | $2.50 | $1.25 | $1.25 | $1.25 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $30,000 | $47,000 | $89,000 | $100,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $142,600 | $394,108 | $6,000 | $26,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $36,671 | $30,839 | $30,839 | $27,000 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 18,348 SY | $5.00 | $4.00 | $4.00 | $4.00 |
| 836E10020 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 9,192 SY | $5.50 | $4.00 | $4.00 | $4.00 |
| 836E10030 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 6,406 SY | $5.00 | $5.00 | $5.00 | $5.00 |
| 602E20000 CONCRETE MASONRY | 37.6 CY | $3,200 | $3,210 | $5,500 | $3,600 |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 32,781 FT | $18.00 | $15.07 | $13.75 | $11.75 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 3,870 FT | $38.00 | $25.55 | $11.50 | $13.00 |
| 605E13301 6" UNCLASSIFIED PIPE UNDERDRAINS, AS PER PLAN | 215 FT | $65.00 | $50.26 | $25.00 | $14.50 |
| 605E13402 6" UNCLASSIFIED PIPE UNDERDRAINS FOR SPRINGS | 750 FT | $42.00 | $54.66 | $25.00 | $32.00 |
| 605E13500 6" ROCK CUT UNDERDRAINS | 19,922 FT | $23.00 | $24.40 | $18.75 | $10.00 |
| 605E31100 AGGREGATE DRAINS | 5,041 FT | $22.00 | $42.94 | $16.50 | $28.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 3,567 FT | $42.00 | $37.19 | $23.50 | $27.00 |
| 611E00900 6" CONDUIT, TYPE B | 2,345 FT | $89.00 | $26.32 | $25.00 | $32.00 |
| 611E01400 6" CONDUIT, TYPE E | 150 FT | $129 | $59.36 | $25.00 | $57.00 |
| 611E01500 6" CONDUIT, TYPE F | 250 FT | $130 | $37.48 | $25.00 | $44.00 |
| 611E04900 12" CONDUIT, TYPE D | 76 FT | $120 | $84.15 | $150 | $69.00 |
| 611E05700 15" CONDUIT, TYPE A, 706.02, 707.33 | 92 FT | $275 | $131 | $188 | $120 |
| 611E05900 15" CONDUIT, TYPE B | 1,476 FT | $225 | $105 | $175 | $146 |
| 611E06100 15" CONDUIT, TYPE C | 1,122 FT | $165 | $112 | $155 | $114 |
| 611E06700 15" CONDUIT, TYPE F | 307 FT | $180 | $95.47 | $175 | $115 |
| 611E06700 15" CONDUIT, TYPE F, 707.21, 707.33 | 953 FT | $148 | $114 | $180 | $115 |
| 611E07400 18" CONDUIT, TYPE B | 125 FT | $168 | $125 | $170 | $110 |
| 611E07600 18" CONDUIT, TYPE C | 777 FT | $154 | $106 | $163 | $175 |
| 611E08900 21" CONDUIT, TYPE B | 392 FT | $274 | $135 | $178 | $158 |
| 611E09400 21" CONDUIT, TYPE D | 88 FT | $197 | $127 | $195 | $95.00 |
| 611E09700 21" CONDUIT, TYPE F | 20 FT | $300 | $171 | $230 | $125 |
| 611E09700 21" CONDUIT, TYPE F, 707.21 | 65 FT | $243 | $211 | $240 | $146 |
| 611E10200 24" CONDUIT, TYPE A, 707.01, 707.02, 707.33 | 384 FT | $192 | $145 | $195 | $250 |
| 611E10400 24" CONDUIT, TYPE B | 69 FT | $275 | $156 | $185 | $125 |
| 611E10600 24" CONDUIT, TYPE C | 10 FT | $330 | $233 | $220 | $161 |
| 611E11200 24" CONDUIT, TYPE F | 20 FT | $386 | $133 | $217 | $146 |
| 611E11200 24" CONDUIT, TYPE F, 707.21 | 224 FT | $238 | $148 | $224 | $141 |
| 611E11900 27" CONDUIT, TYPE B | 91 FT | $274 | $184 | $246 | $130 |
| 611E12100 27" CONDUIT, TYPE C | 405 FT | $349 | $214 | $230 | $248 |
| 611E12700 27" CONDUIT, TYPE F | 18 FT | $300 | $166 | $285 | $175 |
| 611E12700 27" CONDUIT, TYPE F, 707.21 | 24 FT | $350 | $415 | $335 | $226 |
| 611E13400 30" CONDUIT, TYPE B | 229 FT | $229 | $228 | $230 | $250 |
| 611E13600 30" CONDUIT, TYPE C | 240 FT | $216 | $245 | $228 | $295 |
| 611E16200 36" CONDUIT, TYPE A, 707.18, 706.01, 707.33 OR 48" | 181 FT | $397 | $227 | $290 | $189 |
| 611E16400 36" CONDUIT, TYPE B | 270 FT | $431 | $223 | $340 | $257 |
| 611E16600 36" CONDUIT, TYPE C | 12 FT | $373 | $287 | $340 | $196 |
| 611E17200 36" CONDUIT, TYPE F | 83 FT | $310 | $263 | $325 | $239 |
| 611E19200 42" CONDUIT, TYPE A, 707.01, 707.02, 707.33 | 128 FT | $322 | $280 | $300 | $185 |
| 611E19400 42" CONDUIT, TYPE B | 441 FT | $354 | $249 | $253 | $438 |
| 611E19600 42" CONDUIT, TYPE C | 967 FT | $327 | $266 | $375 | $360 |
| 611E19904 42" CONDUIT, TYPE F | 47 FT | $393 | $345 | $370 | $322 |
| 611E22400 54" CONDUIT, TYPE B | 426 FT | $540 | $462 | $380 | $300 |
| 611E22600 54" CONDUIT, TYPE C | 325 FT | $474 | $333 | $400 | $278 |
| 611E23600 60" CONDUIT, TYPE A, 707.01, 707.04, 707.18 | 428 FT | $495 | $457 | $575 | $653 |
| 611E23600 60" CONDUIT, TYPE A, 707.02, 707.04 | 1,582 FT | $479 | $520 | $700 | $510 |
| 611E23600 60" CONDUIT, TYPE A, 707.02, 707.33 | 100 FT | $678 | $496 | $750 | $475 |
| 611E25000 66" CONDUIT, TYPE A, 707.02, 707.04 | 377 FT | $535 | $600 | $730 | $500 |
| 611E98180 CATCH BASIN, NO. 3A | 8 EACH | $5,900 | $5,406 | $3,400 | $3,700 |
| 611E98230 CATCH BASIN, NO. 4 | 6 EACH | $9,800 | $8,222 | $8,000 | $6,500 |
| 611E98260 CATCH BASIN, NO. 4 WITHOUT APRON | 3 EACH | $7,430 | $6,602 | $5,300 | $4,000 |
| 611E98270 CATCH BASIN, NO. 4A | 3 EACH | $11,000 | $13,487 | $11,200 | $9,600 |
| 611E98300 CATCH BASIN, NO. 5 | 8 EACH | $9,000 | $7,094 | $7,000 | $5,200 |
| 611E98341 CATCH BASIN, NO. 5A | 3 EACH | $14,000 | $13,797 | $16,200 | $11,400 |
| 611E98350 CATCH BASIN, NO. 5A, AS PER PLAN | 3 EACH | $19,300 | $16,004 | $12,000 | $15,500 |
| 611E98410 CATCH BASIN, NO. 8 | 17 EACH | $9,500 | $8,342 | $7,500 | $7,100 |
| 611E98434 CATCH BASIN, NO. 8A | 1 EACH | $14,100 | $13,575 | $12,300 | $11,000 |
| 611E98435 CATCH BASIN, NO. 8A, AS PER PLAN | 1 EACH | $17,500 | $13,575 | $12,300 | $11,000 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $4,600 | $4,752 | $5,800 | $5,000 |
| 611E98511 CATCH BASIN, NO. 2-3, AS PER PLAN | 4 EACH | $8,000 | $7,740 | $4,200 | $3,100 |
| 611E99114 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D | 14 EACH | $14,000 | $16,432 | $16,000 | $12,400 |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $8,200 | $4,993 | $6,000 | $4,800 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 37 EACH | $970 | $630 | $425 | $500 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 4,770 FT | $1.47 | $3.10 | $4.50 | $2.50 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.25" | 21,747 SY | $4.75 | $4.75 | $4.75 | $4.75 |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,678 CY | $198 | $198 | $198 | $198 |
| 407E10000 TACK COAT | 29,793 GAL | $3.01 | $3.01 | $3.01 | $3.01 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 70 CY | $300 | $138 | $110 | $165 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 679 CY | $225 | $225 | $225 | $225 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (951 CY | $208 | $208 | $208 | $208 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $330 | $330 | $330 | $330 |
| 441E70801 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (796 CY | $310 | $310 | $310 | $310 |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 25,147 CY | $6.50 | $6.50 | $6.50 | $6.50 |
| 443E12000 STONE MATRIX ASPHALT CONCRETE, 12.5 MM, PG76-22M, | 423 CY | $318 | $318 | $318 | $318 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 455 SY | $120 | $125 | $125 | $125 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 2,656 FT | $45.00 | $34.98 | $34.00 | $36.68 |
| 609E26000 CURB, TYPE 6 | 2,126 FT | $30.00 | $41.62 | $28.00 | $30.56 |
| 609E31000 COMBINATION CURB AND GUTTER, TYPE 9 | 382 FT | $60.00 | $32.69 | $32.00 | $34.56 |
| 609E72000 CONCRETE MEDIAN | 778 SY | $100 | $125 | $125 | $128 |
| 625E00450 CONNECTION, FUSED PULL APART | 84 EACH | $210 | $110 | $110 | $110 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 54 EACH | $165 | $110 | $110 | $110 |
| 625E10490 LIGHT POLE, CONVENTIONAL: AT10B40 | 1 EACH | $4,500 | $3,600 | $3,600 | $3,600 |
| 625E10490 LIGHT POLE, CONVENTIONAL: AT12B40 | 4 EACH | $4,500 | $3,650 | $3,650 | $3,650 |
| 625E10490 LIGHT POLE, CONVENTIONAL: AT15B40 | 6 EACH | $4,600 | $3,800 | $3,800 | $3,800 |
| 625E10490 LIGHT POLE, CONVENTIONAL: AT16B40 | 10 EACH | $4,700 | $3,850 | $3,850 | $3,850 |
| 625E10490 LIGHT POLE, CONVENTIONAL: AT18B40 | 1 EACH | $5,000 | $4,150 | $4,150 | $4,150 |
| 625E10490 LIGHT POLE, CONVENTIONAL: AT6B40 | 2 EACH | $4,400 | $3,500 | $3,500 | $3,500 |
| 625E10490 LIGHT POLE, CONVENTIONAL: AT8B40 | 8 EACH | $4,400 | $3,550 | $3,550 | $3,550 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 32 EACH | $2,700 | $2,200 | $2,200 | $2,200 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 6,318 FT | $3.50 | $4.00 | $4.00 | $4.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 5,046 FT | $2.00 | $2.00 | $2.00 | $2.00 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 9,246 FT | $12.40 | $13.00 | $13.00 | $13.00 |
| 625E25400 CONDUIT, 2", 725.04 | 974 FT | $32.70 | $26.00 | $26.00 | $26.00 |
| 625E25500 CONDUIT, 3", 725.04 | 184 FT | $52.25 | $34.00 | $34.00 | $34.00 |
| 625E25900 CONDUIT, JACKED OR DRILLED; 3" | 735 FT | $112 | $58.00 | $58.00 | $58.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 32 EACH | $627 | $425 | $425 | $425 |
| 625E29002 TRENCH, 24" DEEP | 8,332 FT | $8.10 | $14.00 | $14.00 | $14.00 |
| 625E29900 JUNCTION BOX | 4 EACH | $2,425 | $2,400 | $2,400 | $2,400 |
| 625E30700 PULL BOX, 725.08, 18" | 17 EACH | $1,525 | $1,100 | $1,100 | $1,100 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $2,560 | $1,250 | $1,250 | $1,250 |
| 625E32000 GROUND ROD | 32 EACH | $320 | $285 | $285 | $285 |
| 625E34001 POWER SERVICE, AS PER PLAN | 3 EACH | $14,000 | $8,800 | $8,800 | $8,800 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 8,332 FT | $1.60 | $2.95 | $2.95 | $2.95 |
| 625E75510 POWER SERVICE REMOVED | 1 EACH | $1,600 | $700 | $700 | $700 |
| 625E75800 DISCONNECT CIRCUIT | 21 EACH | $140 | $50.00 | $50.00 | $50.00 |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 10.99 MILE | $1,050 | $1,325 | $1,325 | $2,375 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 3.44 MILE | $1,050 | $1,325 | $1,325 | $2,375 |
| 621E00100 RPM | 1,100 EACH | $48.70 | $37.00 | $37.00 | $37.00 |
| 625E32000 GROUND ROD | 4 EACH | $375 | $285 | $575 | $285 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 180 EACH | $11.25 | $10.00 | $20.00 | $10.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, UNIDIRECTIONAL | 158 EACH | $11.25 | $10.00 | $15.00 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 2,915 FT | $15.20 | $14.00 | $14.00 | $14.00 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 103.1 FT | $35.00 | $18.50 | $18.50 | $18.50 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 42.6 FT | $40.00 | $18.50 | $18.50 | $18.50 |
| 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18 | 96.6 FT | $55.00 | $32.50 | $32.50 | $32.50 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 179.5 FT | $46.00 | $24.00 | $24.00 | $24.00 |
| 630E08000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W12X30 | 331.7 FT | $85.00 | $52.00 | $52.00 | $52.00 |
| 630E08004 ONE WAY SUPPORT, NO. 3 POST | 73 FT | $17.00 | $18.00 | $18.00 | $18.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 111 FT | $18.00 | $18.00 | $18.00 | $18.00 |
| 630E08600 SIGN POST REFLECTOR | 76 EACH | $50.00 | $50.00 | $50.00 | $50.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 32 EACH | $785 | $425 | $425 | $425 |
| 630E72420 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 2 | 1 EACH | $88,750 | $82,500 | $82,500 | $82,500 |
| 630E76530 SPAN WIRE SIGN SUPPORT, TYPE TC-17.11, DESIGN 10 | 1 EACH | $36,975 | $29,500 | $29,500 | $29,500 |
| 630E79600 SIGN SUPPORT ASSEMBLY, BRIDGE MOUNTED, TYPE 1 | 2 EACH | $1,950 | $1,250 | $1,250 | $1,250 |
| 630E80100 SIGN, FLAT SHEET | 1,476.8 SF | $17.50 | $18.50 | $18.50 | $18.50 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 1,519 SF | $25.00 | $22.54 | $22.50 | $22.50 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 1,028 SF | $25.00 | $22.50 | $22.50 | $22.50 |
| 630E80400 SIGN, PERMANENT OVERLAY | 35 SF | $20.00 | $50.00 | $50.00 | $50.00 |
| 630E80500 SIGN, DOUBLE FACED, STREET NAME | 8 EACH | $285 | $225 | $225 | $225 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 32 EACH | $1,150 | $1,500 | $1,500 | $1,500 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 2 EACH | $11,550 | $12,500 | $12,500 | $12,500 |
| 630E84520 SPAN WIRE SIGN SUPPORT FOUNDATION | 2 EACH | $8,850 | $7,500 | $7,500 | $7,500 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 103 EACH | $15.00 | $20.00 | $20.00 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $65.00 | $250 | $250 | $250 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 67 EACH | $20.00 | $20.00 | $20.00 | $20.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 4 EACH | $285 | $400 | $400 | $400 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 6 EACH | $345 | $400 | $400 | $400 |
| 630E89702 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL | 1 EACH | $1,950 | $3,000 | $3,000 | $3,000 |
| 644E00104 EDGE LINE, 6" | 19.89 MILE | $4,485 | $4,865 | $4,485 | $4,485 |
| 644E00204 LANE LINE, 6" | 5.86 MILE | $2,025 | $2,925 | $2,025 | $2,025 |
| 644E00300 CENTER LINE | 5.59 MILE | $5,850 | $8,480 | $5,850 | $5,850 |
| 644E00404 CHANNELIZING LINE, 12" | 7,145 FT | $1.75 | $3.15 | $1.75 | $1.75 |
| 644E00500 STOP LINE | 338 FT | $9.15 | $9.00 | $9.15 | $9.15 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 2,077 FT | $8.90 | $9.00 | $8.90 | $8.90 |
| 644E00720 CHEVRON MARKING | 394 FT | $8.90 | $9.00 | $8.90 | $8.90 |
| 644E00900 ISLAND MARKING | 55 SF | $8.65 | $4.50 | $8.65 | $8.65 |
| 644E01300 LANE ARROW | 20 EACH | $150 | $125 | $150 | $150 |
| 644E01350 LANE REDUCTION ARROW | 12 EACH | $350 | $280 | $350 | $350 |
| 644E01360 WRONG WAY ARROW | 2 EACH | $340 | $200 | $340 | $340 |
| 644E01410 WORD ON PAVEMENT, 96" | 2 EACH | $180 | $180 | $180 | $180 |
| 644E01510 DOTTED LINE, 6" | 10,459 FT | $1.70 | $1.10 | $1.70 | $1.70 |
| 644E20800 YIELD LINE | 57 FT | $15.00 | $14.00 | $15.00 | $15.00 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 1,735 FT | $3.35 | $2.65 | $3.35 | $3.35 |
| 646E10010 EDGE LINE, 6" | 1.12 MILE | $7,205 | $12,775 | $7,205 | $7,205 |
| 646E10110 LANE LINE, 6" | 0.21 MILE | $2,820 | $12,000 | $2,820 | $2,820 |
| 646E10200 CENTER LINE | 0.32 MILE | $10,060 | $21,650 | $10,060 | $10,060 |
| 646E10310 CHANNELIZING LINE, 12" | 633 FT | $3.95 | $4.50 | $3.95 | $3.95 |
| 646E20300 LANE ARROW | 5 EACH | $300 | $200 | $300 | $300 |
| 646E20504 DOTTED LINE, 6" | 808 FT | $3.55 | $1.65 | $3.55 | $3.55 |
| 625E18100 BRACKET ARM, 12' | 4 EACH | $760 | $1,000 | $1,000 | $1,000 |
| 625E23306 NO. 10 AWG 600 VOLT DISTRIBUTION CABLE | 882 FT | $3.75 | $2.00 | $2.00 | $2.00 |
| 625E25400 CONDUIT, 2", 725.04 | 22 FT | $26.00 | $23.00 | $23.00 | $23.00 |
| 625E26250 LUMINAIRE, CONVENTIONAL, OBSOLETE | 4 EACH | $635 | $425 | $425 | $425 |
| 625E29000 TRENCH | 22 FT | $15.00 | $14.00 | $14.00 | $14.00 |
| 625E32000 GROUND ROD | 10 EACH | $320 | $285 | $285 | $285 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 14 EACH | $1,220 | $1,225 | $1,225 | $1,225 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $2,080 | $2,000 | $2,000 | $2,000 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 16 EACH | $175 | $70.00 | $70.00 | $70.00 |
| 632E29900 MESSENGER WIRE, 7 STRAND, 1/4" DIAMETER WITH ACCES | 728 FT | $9.50 | $22.00 | $22.00 | $22.00 |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 728 FT | $5.30 | $22.00 | $22.00 | $22.00 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 860 FT | $3.75 | $3.00 | $3.00 | $3.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 458 FT | $4.50 | $3.20 | $3.20 | $3.20 |
| 632E64000 STRAIN POLE FOUNDATION | 8 EACH | $6,000 | $6,450 | $6,450 | $6,450 |
| 632E70000 POWER SERVICE | 2 EACH | $12,000 | $2,700 | $2,700 | $2,700 |
| 632E86120 STRAIN POLE, TYPE TC-81.11, DESIGN 8 | 2 EACH | $12,000 | $8,200 | $8,200 | $8,200 |
| 632E87120 COMBINATION STRAIN POLE, TYPE TC-81.11, DESIGN 8 | 3 EACH | $12,000 | $8,250 | $8,250 | $8,250 |
| 632E87130 COMBINATION STRAIN POLE, TYPE TC-81.11, DESIGN 10 | 1 EACH | $13,400 | $9,295 | $9,295 | $9,295 |
| 632E90400 SIGNALIZATION, MISC.:COMBINATION STRAIN POLE, TC 8 | 2 EACH | $21,000 | $17,000 | $17,000 | $17,000 |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 2 EACH | $20,000 | $17,350 | $17,350 | $17,350 |
| 633E67100 CABINET FOUNDATION | 2 EACH | $4,300 | $3,110 | $3,100 | $3,100 |
| 633E67200 CONTROLLER WORK PAD | 2 EACH | $4,900 | $650 | $650 | $650 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 2 EACH | $8,725 | $7,700 | $7,700 | $7,700 |
| 644E00500 STOP LINE | 70 FT | $9.15 | $9.15 | $9.15 | $9.15 |
| 809E69000 ADVANCE RADAR DETECTION | 4 EACH | $9,852 | $9,750 | $9,750 | $9,750 |
| 809E69100 STOP LINE RADAR DETECTION | 3 EACH | $9,489 | $9,450 | $9,450 | $9,450 |
| 815E30000 SPREAD SPECTRUM RADIO | 2 EACH | $6,937 | $3,550 | $3,550 | $3,550 |
| 661E20080 DECIDUOUS SHRUB, 4' HEIGHT, RHUS AROMATICA | 7 EACH | $155 | $1,250 | $160 | $1,250 |
| 661E99930 PLANTING, MISC.:, 10" GRAY WASHED RIVER STONE MULC | 796 SY | $43.95 | $44.00 | $45.00 | $40.00 |
| 662E31000 LANDSCAPE WATERING | 49 GAL | $12.00 | $245 | $15.00 | $5.00 |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, ABANDONED 1 - S | 1 LS | $8,000 | $12,958 | $15,000 | $19,500 |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, (2) 1 - STORY FR | 1 LS | $8,000 | $23,332 | $25,000 | $19,500 |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, 1 - STORY FRAME | 1 LS | $10,000 | $27,206 | $55,000 | $19,500 |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, 1 - STORY FRAME | 1 LS | $8,000 | $11,666 | $25,000 | $19,500 |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, 1.5 - STORY FRAM | 1 LS | $9,000 | $12,958 | $25,000 | $19,500 |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, 1.5 - STORY FRAM | 1 LS | $9,000 | $19,754 | $33,000 | $19,500 |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, 1.5 - STORY FRAM | 1 LS | $9,000 | $12,958 | $45,000 | $19,500 |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, 2 - STORY BRICK | 1 LS | $12,000 | $19,754 | $30,000 | $19,500 |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, 2 - STORY BRICK | 1 LS | $12,000 | $14,249 | $25,000 | $19,500 |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, 2 - STORY METAL | 1 LS | $9,000 | $6,797 | $18,000 | $19,500 |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, GARAGE, CAR PORT | 1 LS | $2,000 | $6,797 | $15,000 | $19,500 |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, (2) 1-STORY FRAM | 1 LS | $9,000 | $6,797 | $50,000 | $19,500 |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, SEPTIC TANK, WEL | 1 LS | $1,000 | $1,946 | $6,000 | $19,500 |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, SHED | 1 LS | $1,000 | $324 | $6,000 | $19,500 |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN, WOOD SHED, BARN | 1 LS | $1,000 | $6,797 | $6,000 | $19,500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $125 | $85.00 | $70.00 | $75.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 1,396 FT | $2.20 | $2.00 | $2.00 | $0.70 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,340 | $3,240 | $3,000 | $2,300 |
| 614E12420 DETOUR SIGNING | 1 LS | $34,000 | $15,650 | $15,650 | $17,500 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 298 EACH | $85.81 | $17.75 | $17.75 | $37.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 25 SNMT | $1,100 | $2,135 | $1,650 | $1,650 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 4.2 MILE | $2,350 | $1,775 | $1,775 | $1,775 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 8.34 MILE | $1,790 | $1,350 | $1,350 | $1,350 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 421 FT | $0.90 | $3.00 | $3.00 | $3.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 24 FT | $7.25 | $14.00 | $14.00 | $14.00 |
| 614E30000 WORK ZONE ARROW, CLASS I | 2 EACH | $125 | $200 | $300 | $300 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $10,000 | $16,827 | $10,000 | $15,000 |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 437 SY | $68.00 | $68.00 | $68.00 | $143 |
| 616E10000 WATER | 20,000 MGAL | $18.00 | $86.23 | $18.00 | $70.50 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,396 FT | $45.00 | $75.35 | $42.00 | $35.00 |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 4,811 CY | $67.00 | $62.49 | $60.00 | $110 |
| 509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN | 101,808 LB | $1.52 | $1.51 | $2.00 | $2.00 |
| 511E46012 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL | 465 CY | $1,036 | $1,323 | $840 | $1,200 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 371 CY | $625 | $621 | $800 | $650 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 700 SY | $26.13 | $28.00 | $28.00 | $30.00 |
| 512E33000 TYPE 2 WATERPROOFING | 46 SY | $32.00 | $51.26 | $60.00 | $65.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 440 SF | $36.00 | $12.22 | $6.00 | $6.00 |
| 518E20000 PREFABRICATED GEOCOMPOSITE DRAIN | 362 SY | $24.00 | $50.83 | $40.00 | $9.00 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 310 FT | $75.00 | $223 | $160 | $225 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 1 EACH | $5,000 | $5,215 | $4,500 | $8,500 |
| 518E21050 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 55 SY | $109 | $146 | $130 | $112 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 375 FT | $19.00 | $16.63 | $12.00 | $3.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 26 FT | $19.00 | $25.40 | $50.00 | $25.00 |
| 203E65000 SPECIAL - SETTLEMENT PLATFORM | 2 EACH | $1,080 | $1,955 | $1,200 | $1,500 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $260,000 | $1.00 | $1.00 | $1.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $150,000 | $107,115 | $250,000 | $150,000 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $30,000 | $24,525 | $50,000 | $30,000 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 3,120 FT | $44.00 | $38.40 | $50.00 | $45.00 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 2,880 FT | $20.00 | $24.66 | $18.00 | $19.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 210,079 LB | $1.45 | $1.51 | $2.00 | $1.50 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 9,071 FT | $1.45 | $1.44 | $2.50 | $1.40 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 454 CY | $975 | $1,102 | $1,500 | $1,040 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 80 CY | $725 | $741 | $700 | $1,040 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 280 CY | $885 | $1,076 | $920 | $715 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,459 SY | $22.33 | $26.00 | $26.00 | $28.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 44 SY | $45.00 | $70.34 | $75.00 | $30.50 |
| 512E33000 TYPE 2 WATERPROOFING | 54 SY | $32.00 | $51.26 | $70.00 | $33.00 |
| 515E15030 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $55,000 | $63,708 | $55,000 | $70,000 |
| 515E15030 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $55,000 | $63,721 | $55,000 | $70,000 |
| 515E15030 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $55,000 | $63,868 | $65,000 | $70,000 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 36 EACH | $2,500 | $2,556 | $2,500 | $2,250 |
| 516E12300 STRIP SEAL EXPANSION JOINT ANCHORED WITH ELASTOMER | 100 FT | $1,050 | $547 | $350 | $450 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 30 EACH | $1,700 | $1,606 | $1,800 | $1,500 |
| 518E20000 PREFABRICATED GEOCOMPOSITE DRAIN | 225 SY | $24.00 | $50.83 | $45.00 | $17.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 33 CY | $126 | $146 | $160 | $125 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 161 FT | $17.50 | $16.63 | $12.00 | $12.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 55 FT | $17.50 | $25.40 | $25.00 | $15.00 |
| 524E94950 DRILLED SHAFTS, 72" DIAMETER, INTO BEDROCK | 60 FT | $1,325 | $3,670 | $3,500 | $1,115 |
| 524E94970 DRILLED SHAFTS, 78" DIAMETER ABOVE BEDROCK | 189 FT | $1,860 | $907 | $1,500 | $1,240 |
| 526E30011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 302 SY | $380 | $471 | $620 | $450 |
| 526E90010 TYPE A INSTALLATION | 100 FT | $225 | $211 | $280 | $240 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 1,376 CY | $105 | $128 | $75.00 | $100 |
| 894E10000 THERMAL INTEGRITY PROFILING (TIP) TEST | 6 EACH | $4,000 | $4,379 | $4,000 | $5,000 |
| 511E41012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 159 CY | $1,170 | $1,241 | $1,320 | $1,075 |
| 203E20001 EMBANKMENT, AS PER PLAN | 200 CY | $15.00 | $4.64 | $30.00 | $9.45 |
| 203E35110 GRANULAR MATERIAL, TYPE B | 1,391 CY | $70.00 | $76.37 | $70.00 | $89.00 |
| 203E65000 SPECIAL - SETTLEMENT PLATFORM | 4 EACH | $1,080 | $1,955 | $1,200 | $1,800 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $30,000 | $24,525 | $50,000 | $30,000 |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 1,815 FT | $44.00 | $31.41 | $40.00 | $40.00 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 1,705 FT | $20.00 | $26.76 | $18.00 | $26.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 71,810 LB | $1.45 | $1.51 | $2.00 | $1.50 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 7,034.75 FT | $1.45 | $1.44 | $2.50 | $1.40 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $3,840 | $5,400 | $4,500 | $4,165 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 220 CY | $975 | $1,319 | $1,500 | $900 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 26 CY | $1,000 | $749 | $760 | $1,615 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 146 CY | $885 | $1,076 | $1,200 | $700 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 494 SY | $22.33 | $26.00 | $26.00 | $28.00 |
| 515E15020 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $52,000 | $57,940 | $60,000 | $70,000 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 12 EACH | $2,500 | $3,782 | $5,800 | $2,600 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 103 FT | $80.00 | $54.48 | $55.00 | $48.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 266 SF | $14.00 | $19.08 | $10.00 | $10.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 124 FT | $35.00 | $40.86 | $40.00 | $33.50 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $2,550 | $2,478 | $1,800 | $2,200 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 98 CY | $126 | $146 | $140 | $122 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 134 FT | $17.50 | $16.63 | $12.00 | $12.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 14 FT | $17.50 | $25.40 | $90.00 | $15.00 |
| 526E30011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 302 SY | $380 | $471 | $540 | $450 |
| 526E90030 TYPE C INSTALLATION | 103 FT | $235 | $333 | $350 | $305 |
| 601E37501 PAVED GUTTER, TYPE 1-2, AS PER PLAN | 110 FT | $92.00 | $68.25 | $70.00 | $62.00 |
| 611E99114 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D | 3 EACH | $14,000 | $16,525 | $13,500 | $15,000 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 4 EACH | $5,000 | $4,729 | $4,500 | $4,200 |
| 622E90200 BARRIER, MISC.: TYPE D BARRIER WITH MOMENT SLAB | 4 EACH | $19,600 | $22,407 | $25,000 | $15,750 |
| 840E20000 MECHANICALLY STABILIZED EARTH WALL | 10,921 SF | $49.00 | $43.32 | $65.00 | $35.00 |
| 840E21000 WALL EXCAVATION | 269 CY | $51.00 | $22.12 | $60.00 | $23.00 |
| 840E22000 FOUNDATION PREPARATION | 1,008 SY | $36.00 | $41.18 | $50.00 | $36.00 |
| 840E23000 SELECT GRANULAR BACKFILL | 9,221 CY | $78.00 | $113 | $70.00 | $95.00 |
| 840E23050 NATURAL SOIL | 132 CY | $13.50 | $93.11 | $40.00 | $45.00 |
| 840E25010 6" DRAINAGE PIPE, PERFORATED | 520 FT | $11.00 | $16.63 | $10.00 | $12.00 |
| 840E25020 6" DRAINAGE PIPE, NON-PERFORATED | 115 FT | $11.00 | $36.75 | $30.00 | $15.00 |
| 840E26000 CONCRETE COPING | 400 FT | $197 | $267 | $250 | $170 |
| 840E27000 ON-SITE ASSISTANCE | 2.5 DAY | $100 | $1,235 | $1,500 | $1.00 |
| 867E00101 TEMPORARY WIRE FACED MECHANICALLY STABILIZED EARTH | 1 LS | $335,000 | $854,534 | $500,000 | $700,000 |
| 203E65000 SPECIAL - SETTLEMENT PLATFORM | 4 EACH | $1,080 | $1,955 | $1,200 | $1,800 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $200,000 | $1.00 | $1.00 | $1.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $150,000 | $105,862 | $250,000 | $175,000 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $30,000 | $24,525 | $50,000 | $30,000 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 3,720 FT | $44.00 | $38.40 | $50.00 | $44.00 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 3,480 FT | $20.00 | $24.66 | $18.00 | $23.00 |
| 509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN | 264,122 LB | $1.52 | $1.51 | $2.00 | $1.50 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 11,345 FT | $1.45 | $1.44 | $2.50 | $1.40 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 505 CY | $975 | $1,103 | $1,500 | $1,000 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 94 CY | $725 | $735 | $600 | $1,015 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 274 CY | $885 | $1,057 | $960 | $750 |
| 511E45602 CLASS QC4 MASS CONCRETE, SUBSTRUCTURE WITH QC/QA | 270 CY | $1,000 | $1,266 | $1,225 | $1,360 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,649 SY | $22.33 | $26.00 | $26.00 | $28.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 38 SY | $45.00 | $70.34 | $75.00 | $30.00 |
| 512E33000 TYPE 2 WATERPROOFING | 50 SY | $32.00 | $51.26 | $75.00 | $35.00 |
| 515E15040 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $70,000 | $70,000 | $80,000 | $80,000 |
| 515E15040 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $70,000 | $70,000 | $70,000 | $80,000 |
| 515E15040 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $70,000 | $70,000 | $70,000 | $80,000 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 36 EACH | $2,500 | $2,556 | $2,500 | $2,250 |
| 516E12300 STRIP SEAL EXPANSION JOINT ANCHORED WITH ELASTOMER | 85 FT | $1,050 | $547 | $350 | $450 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 30 EACH | $1,800 | $1,728 | $1,800 | $1,500 |
| 518E12301 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 1 EACH | $3,600 | $3,967 | $3,500 | $4,400 |
| 518E20000 PREFABRICATED GEOCOMPOSITE DRAIN | 224 SY | $24.00 | $50.83 | $45.00 | $17.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 26 CY | $126 | $146 | $180 | $130 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 147 FT | $17.50 | $16.63 | $18.00 | $12.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $17.50 | $25.40 | $60.00 | $15.00 |
| 524E94950 DRILLED SHAFTS, 72" DIAMETER, INTO BEDROCK | 60 FT | $1,325 | $3,522 | $3,500 | $1,115 |
| 524E94970 DRILLED SHAFTS, 78" DIAMETER ABOVE BEDROCK | 168 FT | $1,860 | $934 | $1,500 | $1,295 |
| 526E30011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 292 SY | $380 | $471 | $615 | $450 |
| 526E90010 TYPE A INSTALLATION | 85 FT | $225 | $211 | $350 | $240 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 2,726 CY | $105 | $119 | $75.00 | $85.00 |
| 894E10000 THERMAL INTEGRITY PROFILING (TIP) TEST | 6 EACH | $4,000 | $4,236 | $4,000 | $5,000 |
| 203E20001 EMBANKMENT, AS PER PLAN | 200 CY | $15.00 | $4.64 | $30.00 | $9.50 |
| 203E35110 GRANULAR MATERIAL, TYPE B | 922 CY | $70.00 | $76.37 | $70.00 | $90.00 |
| 203E65000 SPECIAL - SETTLEMENT PLATFORM | 4 EACH | $1,080 | $1,955 | $1,200 | $1,800 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1.00 | $1.00 | $1.00 | $1.00 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $30,000 | $24,525 | $50,000 | $30,000 |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 1,980 FT | $44.00 | $31.41 | $40.00 | $35.00 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 1,870 FT | $20.00 | $26.76 | $18.00 | $24.50 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 58,350 LB | $1.45 | $1.51 | $2.00 | $1.45 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 5,475.25 FT | $1.45 | $1.44 | $2.50 | $1.40 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $3,840 | $4,776 | $4,500 | $4,200 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 176 CY | $975 | $1,331 | $1,500 | $1,015 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 24 CY | $1,000 | $729 | $900 | $1,675 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 151 CY | $885 | $1,076 | $950 | $680 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 463 SY | $22.33 | $26.00 | $26.00 | $28.00 |
| 515E15020 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $48,000 | $54,295 | $55,000 | $70,000 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 4 EACH | $2,500 | $3,782 | $5,800 | $2,700 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 93 FT | $80.00 | $54.48 | $55.00 | $48.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 270 SF | $14.00 | $19.08 | $10.00 | $9.50 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 118 FT | $35.00 | $40.86 | $40.00 | $33.00 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $2,600 | $2,526 | $1,800 | $2,200 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 90 CY | $126 | $146 | $150 | $125 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 126 FT | $17.50 | $16.63 | $12.00 | $12.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 14 FT | $17.50 | $25.40 | $50.00 | $15.00 |
| 526E30011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 304 SY | $380 | $471 | $540 | $450 |
| 526E90030 TYPE C INSTALLATION | 93 FT | $235 | $333 | $380 | $310 |
| 601E37501 PAVED GUTTER, TYPE 1-2, AS PER PLAN | 126 FT | $92.00 | $62.74 | $70.00 | $65.00 |
| 611E99114 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D | 4 EACH | $14,000 | $16,484 | $13,500 | $15,100 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 4 EACH | $5,000 | $5,854 | $4,500 | $4,200 |
| 622E90200 BARRIER, MISC.: SINGLE SLOPE CONCRETE BRIDGE RAILI | 4 EACH | $10,500 | $11,994 | $15,000 | $8,725 |
| 840E20000 MECHANICALLY STABILIZED EARTH WALL | 6,802 SF | $49.00 | $42.70 | $65.00 | $40.00 |
| 840E21000 WALL EXCAVATION | 1,510 CY | $51.00 | $33.01 | $60.00 | $24.00 |
| 840E22000 FOUNDATION PREPARATION | 762 SY | $36.00 | $37.43 | $50.00 | $35.00 |
| 840E23000 SELECT GRANULAR BACKFILL | 5,121 CY | $78.00 | $112 | $70.00 | $95.00 |
| 840E23050 NATURAL SOIL | 93 CY | $13.50 | $79.88 | $40.00 | $50.00 |
| 840E25010 6" DRAINAGE PIPE, PERFORATED | 412 FT | $30.00 | $16.63 | $10.00 | $12.00 |
| 840E25020 6" DRAINAGE PIPE, NON-PERFORATED | 210 FT | $30.00 | $36.74 | $35.00 | $15.00 |
| 840E26000 CONCRETE COPING | 340 FT | $197 | $303 | $250 | $170 |
| 840E27000 ON-SITE ASSISTANCE | 2.5 DAY | $100 | $1,235 | $1,500 | $1.00 |
| 867E00101 TEMPORARY WIRE FACED MECHANICALLY STABILIZED EARTH | 1 LS | $335,000 | $553,887 | $400,000 | $500,000 |
| 203E10000 EXCAVATION | 3,124 CY | $13.25 | $9.52 | $50.00 | $31.00 |
| 503E21100 UNCLASSIFIED EXCAVATION | 949 CY | $80.00 | $27.08 | $20.00 | $20.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 51,501 LB | $1.44 | $1.51 | $2.00 | $1.45 |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 173 CY | $1,036 | $1,453 | $1,500 | $1,600 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 219 CY | $545 | $553 | $700 | $610 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 180 SY | $26.13 | $50.00 | $50.00 | $28.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 74 CY | $126 | $146 | $150 | $120 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 74 FT | $17.50 | $16.63 | $35.00 | $12.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 30 FT | $34.00 | $28.57 | $65.00 | $15.00 |
| 601E11001 RIPRAP, TYPE D, AS PER PLAN | 108 SY | $12.00 | $264 | $15.00 | $245 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 321 CY | $105 | $128 | $20.00 | $120 |
| 601E34200 ROCK CHANNEL PROTECTION, TYPE C WITHOUT FILTER | 782 CY | $105 | $175 | $100 | $155 |
| 203E65000 SPECIAL - SETTLEMENT PLATFORM | 4 EACH | $1,080 | $1,955 | $1,200 | $1,800 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $275,000 | $534,273 | $120,000 | $350,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $150,000 | $108,994 | $380,000 | $135,000 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $30,000 | $24,525 | $50,000 | $25,000 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 2,690 FT | $44.00 | $30.86 | $50.00 | $38.00 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 2,350 FT | $20.00 | $17.39 | $18.00 | $22.00 |
| 509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN | 197,284 LB | $1.52 | $1.51 | $2.00 | $1.45 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 8,919 FT | $1.45 | $1.44 | $2.50 | $1.40 |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 467 CY | $975 | $1,101 | $1,400 | $1,010 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 80 CY | $725 | $737 | $700 | $1,030 |
| 511E41012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 149 CY | $1,170 | $1,285 | $1,400 | $1,120 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 146 CY | $885 | $951 | $908 | $730 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 128 CY | $625 | $658 | $800 | $540 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,658 SY | $22.33 | $26.00 | $26.00 | $28.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 38 SY | $45.00 | $70.34 | $75.00 | $30.00 |
| 515E15030 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 10 EACH | $55,000 | $62,422 | $55,000 | $65,000 |
| 515E15030 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $55,000 | $62,532 | $65,000 | $65,000 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 36 EACH | $2,500 | $2,556 | $2,500 | $2,250 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 120 SF | $14.00 | $15.18 | $7.00 | $7.50 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 118 FT | $35.00 | $40.86 | $40.00 | $33.00 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 20 EACH | $1,760 | $1,716 | $1,800 | $1,500 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $2,760 | $2,603 | $1,800 | $2,500 |
| 518E12301 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 2 EACH | $3,600 | $3,967 | $3,500 | $4,400 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 118 CY | $126 | $146 | $120 | $120 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 148 FT | $17.50 | $16.63 | $12.00 | $12.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 50 FT | $17.50 | $25.40 | $40.00 | $15.00 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 243 SY | $360 | $469 | $580 | $425 |
| 526E90010 TYPE A INSTALLATION | 85 FT | $225 | $211 | $350 | $240 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 1,550 CY | $105 | $128 | $75.00 | $92.00 |
| 203E65000 SPECIAL - SETTLEMENT PLATFORM | 2 EACH | $1,080 | $1,955 | $1,200 | $2,500 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $90,000 | $328,234 | $320,000 | $100,000 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $30,000 | $24,525 | $50,000 | $35,000 |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 3,960 FT | $44.00 | $31.41 | $40.00 | $28.00 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 3,590 FT | $20.00 | $26.76 | $18.00 | $40.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 263,032 LB | $1.45 | $1.51 | $2.00 | $2.00 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 10,402 FT | $1.45 | $1.44 | $2.50 | $2.00 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 570 CY | $975 | $1,103 | $1,300 | $1,150 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 102 CY | $725 | $734 | $700 | $950 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 137 CY | $885 | $1,076 | $1,000 | $1,200 |
| 511E45602 CLASS QC4 MASS CONCRETE, SUBSTRUCTURE WITH QC/QA | 342 CY | $1,000 | $1,184 | $1,240 | $1,450 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 205 CY | $625 | $658 | $800 | $900 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,681 SY | $22.33 | $26.00 | $26.00 | $30.00 |
| 515E15100 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $70,000 | $75,000 | $80,000 | $85,000 |
| 515E15100 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $70,000 | $75,000 | $80,000 | $85,000 |
| 515E15100 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $70,000 | $75,000 | $70,000 | $85,000 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 36 EACH | $2,500 | $3,782 | $2,500 | $6,000 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 83 FT | $80.00 | $54.48 | $55.00 | $100 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 83 SF | $16.00 | $12.22 | $6.00 | $5.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 83 SF | $14.00 | $15.18 | $7.00 | $7.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 62 SF | $14.00 | $19.08 | $10.00 | $10.00 |
| 516E25000 NYLON REINFORCED NEOPRENE SHEETING | 307 SF | $13.00 | $13.62 | $12.00 | $30.00 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 5 EACH | $2,300 | $2,218 | $1,800 | $2,000 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $2,800 | $2,735 | $1,800 | $2,500 |
| 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 15 EACH | $2,450 | $2,377 | $1,800 | $2,500 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 119 CY | $126 | $146 | $120 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 152 FT | $17.50 | $16.63 | $12.00 | $4.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 80 FT | $17.50 | $25.40 | $35.00 | $14.00 |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 230 SY | $360 | $471 | $560 | $400 |
| 526E90030 TYPE C INSTALLATION | 83 FT | $235 | $333 | $400 | $450 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 1,315 SY | $36.00 | $51.76 | $18.00 | $50.00 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 260 CY | $105 | $119 | $90.00 | $140 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $90,000 | $186,605 | $320,000 | $25,000 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $30,000 | $24,525 | $50,000 | $20,000 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 6,840 FT | $44.00 | $30.86 | $50.00 | $35.00 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 6,010 FT | $20.00 | $17.39 | $18.00 | $40.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 317,755 LB | $1.45 | $1.51 | $2.00 | $2.00 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 11,750 FT | $1.45 | $1.44 | $2.50 | $2.00 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 718 CY | $975 | $1,103 | $1,400 | $1,200 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 98 CY | $725 | $743 | $700 | $1,000 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 313 CY | $885 | $1,076 | $950 | $900 |
| 511E45602 CLASS QC4 MASS CONCRETE, SUBSTRUCTURE WITH QC/QA | 425 CY | $1,000 | $1,215 | $1,500 | $1,500 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 224 CY | $625 | $658 | $800 | $900 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 2,778 SY | $22.33 | $26.00 | $26.00 | $30.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 50 SY | $45.00 | $70.34 | $75.00 | $32.00 |
| 512E33000 TYPE 2 WATERPROOFING | 60 SY | $32.00 | $51.27 | $65.00 | $30.00 |
| 515E15041 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 1 EACH | $65,000 | $85,096 | $70,000 | $80,000 |
| 515E15041 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 6 EACH | $65,000 | $85,112 | $70,000 | $80,000 |
| 515E15041 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 1 EACH | $65,000 | $85,112 | $70,000 | $80,000 |
| 515E15041 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $65,000 | $85,248 | $80,000 | $80,000 |
| 515E15041 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 1 EACH | $65,000 | $85,256 | $80,000 | $80,000 |
| 515E15041 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 1 EACH | $65,000 | $85,256 | $80,000 | $80,000 |
| 515E15041 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $65,000 | $85,096 | $70,000 | $80,000 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 51 EACH | $2,500 | $2,556 | $2,500 | $2,451 |
| 516E12300 STRIP SEAL EXPANSION JOINT ANCHORED WITH ELASTOMER | 120 FT | $1,050 | $547 | $350 | $750 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 40 EACH | $1,700 | $1,614 | $1,800 | $1,750 |
| 518E20000 PREFABRICATED GEOCOMPOSITE DRAIN | 204 SY | $24.00 | $50.83 | $50.00 | $12.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 30 CY | $126 | $146 | $150 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 178 FT | $17.50 | $16.63 | $12.00 | $4.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 40 FT | $17.50 | $25.40 | $35.00 | $16.00 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 319 SY | $360 | $472 | $575 | $400 |
| 526E90010 TYPE A INSTALLATION | 115 FT | $225 | $211 | $250 | $250 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 1,949 SY | $36.00 | $51.76 | $18.00 | $50.00 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 634 CY | $105 | $119 | $85.00 | $125 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $350,000 | $205,373 | $50,000 | $35,000 |
| 203E65000 SPECIAL - SETTLEMENT PLATFORM | 3 EACH | $1,080 | $1,955 | $1,200 | $3,500 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $90,000 | $149,960 | $320,000 | $25,000 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $30,000 | $24,525 | $50,000 | $20,000 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 5,415 FT | $44.00 | $30.86 | $50.00 | $35.00 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 4,985 FT | $20.00 | $17.39 | $18.00 | $40.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 254,033 LB | $1.45 | $1.51 | $2.00 | $2.00 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 11,871 FT | $1.45 | $1.44 | $2.50 | $2.00 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 533 CY | $975 | $1,102 | $1,400 | $1,250 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 98 CY | $725 | $740 | $600 | $1,000 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 245 CY | $885 | $1,068 | $960 | $1,200 |
| 511E45602 CLASS QC4 MASS CONCRETE, SUBSTRUCTURE WITH QC/QA | 331 CY | $1,000 | $1,223 | $1,220 | $1,650 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 142 CY | $625 | $658 | $800 | $900 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 2,383 SY | $22.33 | $26.00 | $26.00 | $30.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 39 SY | $45.00 | $70.34 | $50.00 | $32.00 |
| 512E33000 TYPE 2 WATERPROOFING | 51 SY | $32.00 | $51.26 | $75.00 | $30.00 |
| 515E15041 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $65,000 | $88,752 | $70,000 | $80,000 |
| 515E15041 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $65,000 | $88,768 | $70,000 | $80,000 |
| 515E15041 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $65,000 | $88,912 | $85,000 | $80,000 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 36 EACH | $2,500 | $2,556 | $2,500 | $2,500 |
| 516E12300 STRIP SEAL EXPANSION JOINT ANCHORED WITH ELASTOMER | 94 FT | $1,050 | $547 | $350 | $750 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 30 EACH | $1,720 | $1,635 | $1,800 | $1,750 |
| 518E20000 PREFABRICATED GEOCOMPOSITE DRAIN | 165 SY | $24.00 | $50.83 | $45.00 | $12.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 26 CY | $126 | $146 | $180 | $160 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 154 FT | $17.50 | $16.63 | $12.00 | $5.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 50 FT | $17.50 | $25.40 | $45.00 | $15.00 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 251 SY | $360 | $469 | $590 | $400 |
| 526E90010 TYPE A INSTALLATION | 91 FT | $225 | $211 | $350 | $250 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 1,769 SY | $36.00 | $51.76 | $18.00 | $40.00 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 497 CY | $105 | $119 | $80.00 | $150 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $325,000 | $100,000 | $50,000 | $50,000 |
| 203E65000 SPECIAL - SETTLEMENT PLATFORM | 3 EACH | $1,080 | $1,955 | $1,200 | $2,350 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $150,000 | $100,000 | $250,000 | $12,000 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $30,000 | $24,525 | $50,000 | $20,000 |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 8,380 FT | $44.00 | $31.41 | $40.00 | $30.00 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 8,030 FT | $20.00 | $26.76 | $18.00 | $32.00 |
| 507E92200 PREBORED HOLES | 1,404 FT | $29.00 | $101 | $100 | $125 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 299,121 LB | $1.45 | $1.51 | $2.00 | $2.00 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 10,281.5 FT | $1.45 | $1.44 | $2.50 | $2.00 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 796 CY | $975 | $950 | $1,300 | $1,200 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 88 CY | $725 | $740 | $700 | $1,150 |
| 511E41012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 100 CY | $1,170 | $1,442 | $2,000 | $2,100 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 206 CY | $885 | $1,076 | $950 | $1,200 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 78 CY | $625 | $658 | $800 | $1,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,106 SY | $22.33 | $26.00 | $26.00 | $30.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 8,424 EACH | $7.00 | $6.00 | $10.00 | $7.00 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 167 FT | $80.00 | $54.48 | $55.00 | $95.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 140 SF | $15.50 | $12.22 | $6.00 | $5.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 156 SF | $14.00 | $15.18 | $7.00 | $7.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 72 SF | $14.00 | $19.08 | $10.00 | $10.00 |
| 516E25000 NYLON REINFORCED NEOPRENE SHEETING | 598 SF | $13.00 | $13.62 | $12.00 | $30.00 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 9 EACH | $2,250 | $2,216 | $1,800 | $1,600 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 9 EACH | $2,350 | $2,242 | $1,800 | $1,600 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 200 CY | $126 | $146 | $120 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 240 FT | $17.50 | $16.63 | $12.00 | $4.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 100 FT | $17.50 | $25.40 | $35.00 | $12.00 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 441 SY | $360 | $472 | $560 | $400 |
| 526E90030 TYPE C INSTALLATION | 167 FT | $235 | $333 | $380 | $325 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 1,503 SY | $36.00 | $51.76 | $18.00 | $45.00 |
| 869E00100 HIGH LOAD MULTI-ROTATIONAL (HLMR) BEARINGS | 9 EACH | $7,300 | $9,021 | $8,000 | $6,500 |
| 100E51100 DEPARTMENT'S SHARE OF THE DISPUTE RESOLUTION BOARD | 145,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $700,000 | $842,156 | $557,506 | $1,200,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $20,000 | $10,000 | $10,000 | $50,000 |
| 111E10100 SPECIAL - DEPARTMENTS SHARE FACILITATED PARTNERING | 7,750 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $407,000 | $300,000 | $300,000 | $1,220,000 |
| 619E16021 FIELD OFFICE, TYPE C, AS PER PLAN | 42 MNTH | $4,000 | $2,500 | $3,500 | $8,500 |
| 623E11000 PROVIDING ELECTRONIC INSTRUMENTATION | 1 LS | $18,000 | $35,000 | $10,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 4,929,854 CY | $4.69 | $23.1M | 18% |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 40,850 CY | $187.75 | $7.67M | 6% |
| 624E10000 MOBILIZATION | 1 LS | $6,430,000 | $6.43M | 5% |
| 203E20000 EMBANKMENT | 4,531,429 CY | $1.04 | $4.71M | 4% |
| 832E30000 EROSION CONTROL | 4,420,289 EACH | $1 | $4.42M | 3% |
| 606E10210 SPECIAL - NOISE BARRIER (REFLECTIVE) | 114,072 SF | $33 | $3.76M | 3% |
| 304E20000 AGGREGATE BASE | 42,620 CY | $85 | $3.62M | 3% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 15,343 CY | $208 | $3.19M | 2% |
| 513E10281 STRUCTURAL STEEL MEMBERS, LEVEL 4, AS PER PLAN | 907,132 LB | $2.8 | $2.54M | 2% |
| 611E97400 CONDUIT, MISC.: 22' DIA., TYPE A, 707.03, AS PER P | 452 FT | $5,500 | $2.49M | 2% |