Ohio DOT · bid history
Showing the 300 most recent of 547 bids. Stats above reflect the full history.
| Result | Project | County | Let | Their bid | Winning bid |
|---|---|---|---|---|---|
| Rank 5of 5 | POR-US 224-00.00Pavement | POR | Apr 2026 | $14.1M | $11.0M |
| Rank 3of 3 | SAN-US 20-28.02 ResurfacingPavement | SAN | Apr 2026 | $5.42M | $4.39M |
| Wonof 2 | LOR-US 20/SR 301-16.93/19.54Pavement | LOR | Apr 2026 | $4.32M | $4.32M |
| Rank 5of 5 | SUM-SR 261-00.00/VARPavement | SUM | Apr 2026 | $4.56M | $3.56M |
| Rank 2of 2 | PIC-US 23-16.94Pavement | PIC | Apr 2026 | $711k | $595k |
| Wonof 3 | LUC-/OTT-SR 2-34.05/00.00 ResurfPavement | LUC | Apr 2026 | $3.39M | $3.39M |
| Rank 2of 2 | MED-SR 421-00.00Pavement | MED | Apr 2026 | $2.44M | $2.39M |
| Rank 2of 3 | MED-IR 71 Rest Areas TPPavement | MED | Apr 2026 | $5.43M | $5.04M |
| Wonof 3 | WOO-Roche De Boeuf InterurbanOther | WOO | Apr 2026 | $3.06M | $3.06M |
| Wonof 2 | MRW-US 42-00.00Pavement | MRW | Mar 2026 | $3.14M | $3.14M |
| Rank 2of 5 | MAD-US 42-07.14,MAD-SR 38-12.40/31.74Pavement | MAD | Mar 2026 | $1.42M | $1.28M |
| Rank 7of 10 | WYA-US 30 Rest Areas TPPavement | WYA | Mar 2026 | $3.79M | $3.39M |
| Wonof 2 | LIC-SR 16/SR 37-14.24/15.47Pavement | LIC | Feb 2026 | $42.7M | $42.7M |
| Wonof 3 | DEL-IR 71-SP-FY2026 (Priority)Pavement | DEL | Feb 2026 | $1.84M | $1.84M |
| Rank 4of 7 | CUY-SR 87-14.72Pavement | CUY | Feb 2026 | $776k | $669k |
| Rank 2of 4 | HOL-SR 179-00.00Pavement | HOL | Feb 2026 | $3.07M | $3.06M |
| Rank 3of 3 | SAN-SR 510-00.00 RehabPavement | SAN | Feb 2026 | $6.26M | $5.65M |
| Rank 5of 8 | LAK-SR 174-00.00Pavement | LAK | Jan 2026 | $1.80M | $1.73M |
| Rank 2of 7 | LAK-SR 84/VAR-18.21/VARPavement | LAK | Jan 2026 | $1.27M | $1.13M |
| Rank 3of 3 | HEN-US 6/US 24-11.32/04.62Pavement | HEN | Jan 2026 | $68.0M | $58.4M |
| Rank 4of 4 | D12-PPM FY2026Pavement | D12 | Jan 2026 | $3.65M | $2.38M |
| Rank 2of 2 | RIC-IR 71-10.76Pavement | RIC | Jan 2026 | $8.39M | $7.85M |
| Rank 3of 5 | POR-SR 82/VAR-10.64/VARPavement | POR | Jan 2026 | $4.37M | $4.05M |
| Rank 9of 9 | CUY-IR 480-13.04 RampsPavement | CUY | Jan 2026 | $2.79M | $1.87M |
| Rank 3of 3 | UNI-US 42-SP-FY2026 (GENERAL)Pavement | UNI | Jan 2026 | $756k | $528k |
| Rank 2of 3 | DEL-SR 229-00.12Pavement | DEL | Dec 2025 | $1.79M | $1.69M |
| Rank 2of 3 | WOO-IR 75/IR 475-24.85/00.00 Resurf (PART 1 AND PART 2)Pavement | WOO | Dec 2025 | $11.3M | $11.0M |
| Wonof 2 | WAY-SR 226-00.905Pavement | WAY | Dec 2025 | $4.29M | $4.29M |
| Rank 5of 6 | TRU-US 422-08.01Signals | TRU | Dec 2025 | $265k | $204k |
| Wonof 4 | MAD-IR 70-00.00Pavement | MAD | Dec 2025 | $9.13M | $9.13M |
| Wonof 2 | MAR-SR 95-00.45Pavement | MAR | Dec 2025 | $1.23M | $1.23M |
| Wonof 3 | CUY-IR 71-00.00Pavement | CUY | Dec 2025 | $4.72M | $4.72M |
| Wonof 2 | RIC-VAR OVERLAY FY2026Pavement | RIC | Dec 2025 | $5.27M | $5.27M |
| Wonof 2 | PIC-SR-SR 188-02.56Pavement | PIC | Dec 2025 | $1.39M | $1.39M |
| Rank 2of 3 | ATB-US 20/SR 307-03.94/07.81Pavement | ATB | Dec 2025 | $2.19M | $1.89M |
| Wonof 3 | CRA-RM FY2026Pavement | CRA | Dec 2025 | $1.49M | $1.49M |
| Rank 3of 3 | CUY-IR 90-16.28 CCG3APavement | CUY | Nov 2025 | $345.0M | $328.5M |
| Wonof 3 | KNO-US 62/SR 205-14.32/00.00Pavement | KNO | Nov 2025 | $3.94M | $3.94M |
| Wonof 4 | SAN-/SEN-SR 18-00.00/30.47Pavement | SAN | Nov 2025 | $2.22M | $2.22M |
| Rank 5of 7 | FRA-EXPO CENTER/OHC-FY2026Pavement | FRA | Oct 2025 | $1.21M | $1.02M |
| Rank 4of 4 | HAN-SR 37-06.47Pavement | HAN | Oct 2025 | $2.61M | $2.48M |
| Rank 2of 3 | ERI-SR 2-24.50Pavement | ERI | Oct 2025 | $12.8M | $12.8M |
| Rank 3of 5 | GEA-SR 88/US 422-02.05/15.52Pavement | GEA | Oct 2025 | $1.74M | $1.60M |
| Rank 3of 4 | WOO-/SAN-US 20/US 65-00.00/19.38 ResPavement | WOO | Oct 2025 | $4.99M | $4.39M |
| Wonof 3 | WYA-SR 53-15.36Pavement | WYA | Oct 2025 | $1.47M | $1.47M |
| Rank 2of 6 | GEA-SR 87-02.73Pavement | GEA | Sep 2025 | $1.58M | $1.36M |
| Rank 2of 2 | LIC-SR 13-11.11Pavement | LIC | Sep 2025 | $5.17M | $4.81M |
| Rank 2of 4 | SEN-SR 19/SR 228/SR 590-06.07/00.00/00.00Pavement | SEN | Sep 2025 | $2.48M | $2.30M |
| Wonof 2 | FAI-/LIC-SR 158-07.63/00.00Pavement | FAI | Aug 2025 | $2.75M | $2.75M |
| Wonof 2 | MRW-SR 61-03.40Pavement | MRW | Aug 2025 | $2.05M | $2.05M |
| Rank 3of 4 | POR-IR 76-09.73Pavement | POR | Jul 2025 | $10.8M | $9.96M |
| Wonof 4 | WAY-SR 302-03.82Pavement | WAY | Jul 2025 | $4.18M | $4.18M |
| Wonof 3 | ASD-/RIC/MED-IR 71-00.71 RM FY2026Pavement | ASD | Jul 2025 | $3.35M | $3.35M |
| Rank 3of 3 | DEL-US 23-SP-2025 (PRIORITY)Pavement | DEL | Jul 2025 | $1.95M | $1.69M |
| Wonof 2 | WAY-SR 57-04.819Pavement | WAY | Jul 2025 | $1.12M | $1.12M |
| Rank 7of 8 | SUM-SR 21-19.57/VARPavement | SUM | Jul 2025 | $1.08M | $812k |
| Rank 2of 2 | MAR-SR 37-08.03Pavement | MAR | Jun 2025 | $159k | $123k |
| Rank 2of 3 | MED-SR 18/SR 57-15.05/17.807Pavement | MED | Jun 2025 | $2.57M | $2.38M |
| Rank 3of 4 | ERI-SR 2-15.89Pavement | ERI | May 2025 | $6.32M | $6.10M |
| Wonof 2 | MRW-SR 61-SP-2025 (GENERAL)Pavement | MRW | May 2025 | $445k | $445k |
| Wonof 2 | WYA-US 23-00.00/04.03Pavement | WYA | May 2025 | $3.48M | $3.48M |
| Wonof 4 | SEN-SR 4/SR 18-07.52/15.39 ResurfPavement | SEN | May 2025 | $3.74M | $3.74M |
| Rank 2of 3 | FRA-IR 70-15.52Pavement | FRA | May 2025 | $7.63M | $7.37M |
| Rank 3of 3 | LAK-SR 2-14.38Pavement | LAK | May 2025 | $4.39M | $3.77M |
| Rank 3of 4 | FAI-US 33-02.64Pavement | FAI | May 2025 | $54.4M | $51.3M |
| Rank 6of 6 | DEL-IR 71-08.91 (Ph A)Pavement | DEL | May 2025 | $38.2M | $32.3M |
| Rank 3of 4 | CUY-IR 90-06.69 Major RehabPavement | CUY | May 2025 | $174.5M | $168.3M |
| Wonof 1 | ATH-/MEG-US 33-23.23/00.00Pavement | ATH | Apr 2025 | $116.1M | $116.1M |
| Wonof 3 | SAN-SR-SR 53-10.45 Resurf & UrbPavPavement | SAN | Apr 2025 | $1.85M | $1.85M |
| Rank 3of 4 | FRA-IR 71/IR 270-28.27/25.99APavement | FRA | Apr 2025 | $43.0M | $41.4M |
| Wonof 1 | ATH-US 33-18.78Pavement | ATH | Apr 2025 | $61.3M | $61.3M |
| Rank 3of 4 | FAY-SR-SR 41/VAR-22.18/VARPavement | FAY | Mar 2025 | $1.32M | $1.20M |
| Wonof 1 | MEG-US 33-19.21Pavement | MEG | Mar 2025 | $65.2M | $65.2M |
| Wonof 2 | WAY-US 30-09.18Pavement | WAY | Mar 2025 | $2.46M | $2.46M |
| Wonof 6 | MEG-US 33-13.98Pavement | MEG | Feb 2025 | $31.1M | $31.1M |
| Rank 2of 3 | WYA-East Wyandot Ave.Pavement | WYA | Feb 2025 | $860k | $825k |
| Rank 2of 3 | ERI-SR 60-00.00Pavement | ERI | Feb 2025 | $1.09M | $1.07M |
| Wonof 2 | LOR-IR 90-10.76Pavement | LOR | Feb 2025 | $115.8M | $115.8M |
| Rank 3of 3 | LUC-US 23-11.75 Inter-Chng (PART 1 AND PART 2)Pavement | LUC | Feb 2025 | $34.4M | $31.7M |
| Wonof 3 | WAY-SR 94/US 30A-06.70/00.00Pavement | WAY | Feb 2025 | $1.45M | $1.45M |
| Rank 3of 5 | PIC-SR 762-11.18Pavement | PIC | Feb 2025 | $2.18M | $1.97M |
| Rank 3of 3 | PUT-SR 108-02.65Earthwork | PUT | Feb 2025 | $1.59M | $1.36M |
| Rank 3of 3 | D12-PPM FY2025Pavement | D12 | Jan 2025 | $2.36M | $1.73M |
| Rank 3of 3 | DEL-US-US 36-07.39Pavement | DEL | Jan 2025 | $2.13M | $1.69M |
| Wonof 2 | SUM-IR 480-07.45Bridge | SUM | Jan 2025 | $7.36M | $7.36M |
| Rank 4of 4 | SUM-SR-SR 8-15.75Pavement | SUM | Jan 2025 | $7.22M | $6.72M |
| Wonof 2 | ASD-/RIC-SR 96/SR 603-VARPavement | ASD | Jan 2025 | $4.49M | $4.49M |
| Rank 4of 5 | MAD-SR-SR 56-00.00Pavement | MAD | Jan 2025 | $1.45M | $1.24M |
| Rank 2of 4 | FRA-IR 70-00.00Pavement | FRA | Jan 2025 | $57.5M | $54.4M |
| Rank 2of 4 | HOL-SR 515-00.00 (PART 1 AND PART 2)Pavement | HOL | Jan 2025 | $6.23M | $5.85M |
| Rank 6of 9 | HAM-US 52-36.85Earthwork | HAM | Jan 2025 | $2.22M | $1.93M |
| Rank 3of 4 | GAL-SR 7-19.94Earthwork | GAL | Jan 2025 | $2.65M | $2.47M |
| Rank 2of 2 | ERI-/ LOR RM FY2025Pavement | ERI | Jan 2025 | $603k | $578k |
| Wonof 4 | SAN-SR 412/SR 590-08.86/06.56 ResurfPavement | SAN | Jan 2025 | $3.65M | $3.65M |
| Wonof 3 | CRA-/ RIC / WAY RM FY2025Pavement | CRA | Jan 2025 | $905k | $905k |
| Rank 6of 7 | HUR-SR 18-17.10Signals | HUR | Jan 2025 | $2.02M | $1.52M |
| Wonof 4 | LAW-SR 7-02.17 Phase 2Other | LAW | Dec 2024 | $128.6M | $128.6M |
| Wonof 2 | CRA-/RIC-SR 61/SR 181-VARPavement | CRA | Dec 2024 | $2.75M | $2.75M |
| Rank 2of 3 | CUY-IR 271-09.28 Safety (PART 1 AND PART 2)Safety | CUY | Dec 2024 | $16.2M | $15.9M |
| Rank 2of 2 | KNO-SR 13-15.98Pavement | KNO | Dec 2024 | $5.50M | $4.73M |
| Wonof 3 | MED-IR 71-15.79Pavement | MED | Dec 2024 | $11.7M | $11.7M |
| Rank 7of 7 | WAR-SR 350-08.73Bridge | WAR | Dec 2024 | $5.23M | $4.04M |
| Rank 3of 3 | FAY-US 35/SR 435-00.00/00.00Pavement | FAY | Nov 2024 | $3.15M | $2.53M |
| Rank 2of 2 | ASD-SR 95/SR 511-06.49/18.329Pavement | ASD | Nov 2024 | $3.96M | $3.93M |
| Rank 5of 5 | SUM-SR 82-00.14/08.04Pavement | SUM | Nov 2024 | $3.07M | $2.74M |
| Rank 4of 6 | D06-Wrong Way DetectionSignals | D06 | Oct 2024 | $3.24M | $2.75M |
| Rank 2of 4 | ATB-US 6-00.00Pavement | ATB | Oct 2024 | $1.79M | $1.58M |
| Wonof 2 | WYA-US 23-23.16Pavement | WYA | Oct 2024 | $1.06M | $1.06M |
| Wonof 3 | WYA-US-US 23/US 30-10.26/09.12Pavement | WYA | Oct 2024 | $6.81M | $6.81M |
| Rank 9of 9 | COS-CR 271-06.26Signals | COS | Oct 2024 | $562k | $429k |
| Rank 6of 7 | MED-IR 76-11.83Signals | MED | Oct 2024 | $425k | $295k |
| Wonof 2 | MAR-SR 423/SR 231-00.04/00.02Pavement | MAR | Oct 2024 | $3.10M | $3.10M |
| Wonof 4 | WAY-US 30-19.469Pavement | WAY | Oct 2024 | $3.56M | $3.56M |
| Wonof 2 | MRW-SR 314-04.02Pavement | MRW | Sep 2024 | $970k | $970k |
| Rank 3of 6 | FRA-SR 161-15.80 Noise AbatementSafety | FRA | Sep 2024 | $8.69M | $7.94M |
| Rank 6of 6 | D03-LG FY2025(A)Signals | D03 | Sep 2024 | $162k | $96k |
| Rank 5of 5 | CUY-IR 77-04.79/Wallings RoadPavement | CUY | Sep 2024 | $9.76M | $8.04M |
| Rank 3of 3 | WOO-SR 582-05.43/10.24 ResurfPavement | WOO | Sep 2024 | $2.61M | $2.50M |
| Rank 5of 5 | HAM-IR 74-13.35Bridge | HAM | Aug 2024 | $5.98M | $5.39M |
| Rank 4of 5 | LAK-US 6-04.61 SuperBridge | LAK | Aug 2024 | $5.14M | $4.08M |
| Rank 5of 5 | LOR-SR 2-(00.97) (07.42)Bridge | LOR | Aug 2024 | $1.36M | $698k |
| Rank 5of 5 | POR-SR 225-11.04Pavement | POR | Jul 2024 | $1.93M | $1.61M |
| Rank 2of 3 | WOO-IR 75-27.80 NoisewallSafety | WOO | Jul 2024 | $1.18M | $1.16M |
| Rank 2of 2 | D06-SP FY2024 PriorityPavement | D06 | Jun 2024 | $2.92M | $2.15M |
| Rank 2of 3 | LAK-SR 44-04.14Pavement | LAK | Jun 2024 | $3.21M | $3.19M |
| Wonof 2 | WAY-SMOOTH FY2025Pavement | WAY | Jun 2024 | $1.33M | $1.33M |
| Rank 3of 3 | DEL-/FAY SP FY2025Pavement | DEL | Jun 2024 | $1.10M | $848k |
| Rank 3of 3 | FRA-IR 70-00.71Pavement | FRA | Jun 2024 | $2.29M | $2.01M |
| Rank 3of 3 | FRA-US 40-15.27Pavement | FRA | Jun 2024 | $790k | $747k |
| Wonof 3 | LOR-IR 90-10.76 RMPavement | LOR | May 2024 | $1.80M | $1.80M |
| Rank 2of 2 | D03-RM FY2024Pavement | D03 | May 2024 | $695k | $628k |
| Rank 3of 3 | D06-SP FY2024 GeneralPavement | D06 | May 2024 | $1.42M | $870k |
| Wonof 2 | MRW-SR 229-05.43Pavement | MRW | May 2024 | $452k | $452k |
| Wonof 2 | WAY-US 30-00.00Pavement | WAY | May 2024 | $3.01M | $3.01M |
| Wonof 2 | LOR-SR 611-00.01Pavement | LOR | May 2024 | $4.33M | $4.33M |
| Wonof 2 | ASD-US 42-03.78Pavement | ASD | May 2024 | $4.15M | $4.15M |
| Wonof 2 | RIC-SR 13-11.01Pavement | RIC | Apr 2024 | $18.5M | $18.5M |
| Rank 3of 3 | CUY-IR 490-00.00 Major Rehab (PART 1 AND PART 2)Pavement | CUY | Apr 2024 | $68.4M | $61.9M |
| Rank 4of 4 | HEN-SR 110-03.51 Slope RepairEarthwork | HEN | Apr 2024 | $2.03M | $1.71M |
| Wonof 2 | LIC-SR 16-00.00Pavement | LIC | Apr 2024 | $7.53M | $7.53M |
| Rank 2of 3 | LOR-/MED-SR 162Pavement | LOR | Mar 2024 | $4.00M | $3.81M |
| Rank 2of 2 | PIC-US 23-12.89 Part 1, 2 & 3Signals | PIC | Mar 2024 | $6.37M | $5.58M |
| Rank 3of 3 | CUY-/LAK-IR 271X-07.42/00.00Pavement | CUY | Mar 2024 | $6.53M | $6.25M |
| Rank 2of 2 | MRW-SR 95/SR 95A-05.52/00.00Pavement | MRW | Mar 2024 | $1.35M | $1.33M |
| Rank 2of 2 | PIC-SR 56-19.61Pavement | PIC | Feb 2024 | $1.19M | $995k |
| Rank 2of 3 | HUR-SR 13-00.00Pavement | HUR | Feb 2024 | $13.6M | $12.1M |
| Rank 3of 6 | GEA-SR 608-00.00/05.22Pavement | GEA | Feb 2024 | $737k | $672k |
| Wonof 2 | UNI-SR 37-06.34Pavement | UNI | Feb 2024 | $1.06M | $1.06M |
| Wonof 2 | MAR-SR 739/SR 47-00.00/08.56Pavement | MAR | Feb 2024 | $1.65M | $1.65M |
| Wonof 3 | MED-IR 271-00.00Pavement | MED | Jan 2024 | $7.63M | $7.63M |
| Rank 2of 3 | LAK-US 20-24.99 Major RehabPavement | LAK | Jan 2024 | $26.3M | $24.8M |
| Wonof 2 | FAY-IR 71-00.00(MAD)Pavement | FAY | Jan 2024 | $11.3M | $11.3M |
| Rank 4of 7 | CUY-US 6-26.65Pavement | CUY | Jan 2024 | $1.92M | $1.60M |
| Wonof 1 | FRA-IR 70-13.11 (Proj 4A)Pavement | FRA | Jan 2024 | $343.5M | $343.5M |
| Rank 4of 7 | SUM-SR 18-01.01Pavement | SUM | Jan 2024 | $2.19M | $1.90M |
| Wonof 2 | CRA-US 30-09.53Pavement | CRA | Jan 2024 | $9.25M | $9.25M |
| Rank 3of 3 | HOL-SR 39-06.72Pavement | HOL | Jan 2024 | $1.52M | $1.44M |
| Rank 2of 2 | FRA-SR 3-19.92Pavement | FRA | Jan 2024 | $3.35M | $2.93M |
| Wonof 5 | MED-/WAY-SR 83/SR 585-00.91/11.98Pavement | MED | Jan 2024 | $1.29M | $1.29M |
| Rank 2of 4 | CUY-SR 17-12.58Pavement | CUY | Dec 2023 | $2.35M | $2.26M |
| Rank 6of 8 | POR-Frost Rd Ph 2 (Streetsboro)Pavement | POR | Dec 2023 | $612k | $497k |
| Wonof 2 | ASD-SR 604-00.00Pavement | ASD | Dec 2023 | $1.49M | $1.49M |
| Rank 3of 3 | CUY-IR 71/IR 90-14.66/14.94Pavement | CUY | Nov 2023 | $11.2M | $9.83M |
| Wonof 2 | RIC-SR 95-00.00Pavement | RIC | Nov 2023 | $1.50M | $1.50M |
| Rank 3of 3 | WOO-IR 75-29.93 Bridge RehabBridge | WOO | Nov 2023 | $9.18M | $7.21M |
| Rank 6of 7 | LAK-IR 90-05.57 SlideEarthwork | LAK | Nov 2023 | $1.38M | $1.09M |
| Rank 2of 2 | MAR-SR 95-18.48Pavement | MAR | Nov 2023 | $2.12M | $2.12M |
| Rank 3of 3 | HAN-/WYA-US 30-12.22/00.00Pavement | HAN | Nov 2023 | $6.24M | $5.55M |
| Rank 2of 2 | LIC-IR 70/SR 37-09.55/24.42Pavement | LIC | Oct 2023 | $13.6M | $13.4M |
| Rank 4of 5 | GEA-SR 87-00.00Pavement | GEA | Oct 2023 | $1.39M | $1.14M |
| Rank 2of 3 | FAY-/MAD-SR 41-24.45/00.00Pavement | FAY | Oct 2023 | $2.48M | $2.34M |
| Wonof 2 | WOO-/LUC-IR 280-06.2/00.00 ResurfPavement | WOO | Oct 2023 | $13.9M | $13.9M |
| Rank 2of 4 | HOL-/WAY-SR 83/VAR-14.70/VARPavement | HOL | Oct 2023 | $2.78M | $2.55M |
| Rank 3of 3 | ATB-SR 11-22.16Pavement | ATB | Oct 2023 | $13.8M | $13.1M |
| Rank 2of 2 | LOR-SR 2-07.97Pavement | LOR | Oct 2023 | $5.59M | $5.01M |
| Rank 6of 9 | PIK-CR 50-02.55 OH18-01Earthwork | PIK | Sep 2023 | $1.47M | $1.13M |
| Wonof 2 | ATB-IR 90-00.00Pavement | ATB | Sep 2023 | $5.06M | $5.06M |
| Rank 2of 3 | CUY-IR 271-06.13Pavement | CUY | Sep 2023 | $6.54M | $6.23M |
| Rank 3of 3 | CUY-IR 480-10.38Pavement | CUY | Sep 2023 | $4.77M | $4.13M |
| Rank 3of 4 | HUR-US 224-00.00Pavement | HUR | Sep 2023 | $9.34M | $8.69M |
| Wonof 2 | MAR-SR 95-13.95Pavement | MAR | Sep 2023 | $1.10M | $1.10M |
| Wonof 2 | CRA-OVERLAY VARPavement | CRA | Sep 2023 | $2.49M | $2.49M |
| Rank 2of 2 | LIC-SR 16/SR 79-20.26/12.46Pavement | LIC | Sep 2023 | $7.41M | $6.39M |
| Rank 5of 5 | SUM-IR 77-28.75Pavement | SUM | Aug 2023 | $64.2M | $54.6M |
| Rank 3of 3 | HUR-SR 303-00.00Pavement | HUR | Aug 2023 | $2.17M | $2.08M |
| Rank 2of 3 | WOO-IR 75-26.02 ResurfPavement | WOO | Jul 2023 | $6.58M | $6.25M |
| Rank 2of 3 | WYA-SR 294-00.00Pavement | WYA | Jun 2023 | $1.90M | $1.85M |
| Wonof 1 | FRA-SR 161-15.80Pavement | FRA | May 2023 | $65.6M | $65.6M |
| Rank 3of 3 | OTT-SR 2-23.29 Resurf/BridgeBridge | OTT | May 2023 | $12.1M | $11.5M |
| Wonof 3 | D03-RM FY2023Pavement | D03 | May 2023 | $2.06M | $2.06M |
| Wonof 2 | FRA-SR 665-SP FY23 GeneralPavement | FRA | May 2023 | $813k | $813k |
| Wonof 4 | D12-PPM FY2023Pavement | D12 | Apr 2023 | $3.70M | $3.70M |
| Wonof 1 | FRA-IR 270 SP FY23Pavement | FRA | Apr 2023 | $1.87M | $1.87M |
| Rank 2of 5 | SUM-SR 8-01.75Bridge | SUM | Apr 2023 | $175.6M | $157.6M |
| Rank 3of 5 | OTT-SR 19/SR 163-03.29/10.00 ResurfPavement | OTT | Mar 2023 | $2.61M | $2.50M |
| Rank 3of 3 | FRA-SR 745-00.69Pavement | FRA | Mar 2023 | $1.27M | $1.09M |
| Rank 5of 8 | CUY-York RoadPavement | CUY | Mar 2023 | $980k | $848k |
| Rank 2of 4 | FRA-SR 256-00.01Pavement | FRA | Mar 2023 | $687k | $641k |
| Rank 3of 3 | CUY-IR 77-08.41Pavement | CUY | Mar 2023 | $4.56M | $4.41M |
| Wonof 2 | CRA-SR 61-02.87Pavement | CRA | Mar 2023 | $3.08M | $3.08M |
| Wonof 3 | FRA-SR 665-09.20Pavement | FRA | Feb 2023 | $2.91M | $2.91M |
| Wonof 2 | LOR-US 20-13.54Pavement | LOR | Feb 2023 | $3.86M | $3.86M |
| Rank 2of 2 | RIC-US 30-00.00Pavement | RIC | Feb 2023 | $5.82M | $4.74M |
| Rank 2of 3 | MED-SR 94/SR 162-05.36/12.90Pavement | MED | Feb 2023 | $2.72M | $2.58M |
| Rank 2of 3 | MAD-/PIC-IR 71-07.30/00.00 Part 1&2Pavement | MAD | Feb 2023 | $129.1M | $126.6M |
| Rank 2of 2 | MAR-SR 529-02.59Pavement | MAR | Feb 2023 | $5.55M | $5.19M |
| Rank 2of 4 | HOL-US 62-05.66Pavement | HOL | Feb 2023 | $1.48M | $1.31M |
| Rank 3of 3 | CUY-IR 90-18.72Pavement | CUY | Jan 2023 | $2.68M | $2.65M |
| Rank 4of 5 | LAK-SR 86-01.68Pavement | LAK | Jan 2023 | $1.24M | $1.08M |
| Rank 5of 6 | GEA-SR 87-07.70Pavement | GEA | Jan 2023 | $1.71M | $1.33M |
| Rank 3of 4 | ATB-SR 193-14.57Pavement | ATB | Jan 2023 | $2.60M | $2.37M |
| Wonof 4 | SAN-SR 53-12.84 ResurfacingPavement | SAN | Jan 2023 | $2.75M | $2.75M |
| Rank 3of 3 | CUY-IR 480-06.78Pavement | CUY | Jan 2023 | $6.13M | $5.51M |
| Wonof 2 | CRA-SR 39-04.02Pavement | CRA | Jan 2023 | $1.65M | $1.65M |
| Rank 3of 4 | SEN-SR 4-00.00 ResurfacingPavement | SEN | Jan 2023 | $3.11M | $3.04M |
| Rank 2of 2 | KNO-US 36-29.49Pavement | KNO | Dec 2022 | $1.89M | $1.86M |
| Wonof 2 | JEF-SR 7-14.32Earthwork | JEF | Dec 2022 | $23.0M | $23.0M |
| Rank 5of 7 | SUM-IR 77-22.30Bridge | SUM | Dec 2022 | $16.8M | $13.4M |
| Wonof 2 | RIC-US 30-13.06Pavement | RIC | Dec 2022 | $8.63M | $8.63M |
| Rank 2of 2 | LIC-US 40-13.15 (PART 1, PART 2, PART 3)Signals | LIC | Dec 2022 | $8.89M | $7.75M |
| Rank 2of 2 | FAI-/LIC-SR 37-00.00/25.08Pavement | FAI | Dec 2022 | $3.43M | $3.35M |
| Wonof 3 | WAY-SR 94-08.18Pavement | WAY | Dec 2022 | $2.16M | $2.16M |
| Wonof 2 | MRW-/MAR-SR 309/SR 61-29.20/02.47/22.86Pavement | MRW | Dec 2022 | $1.73M | $1.73M |
| Wonof 2 | CUY-IR 480-07.14 WB SafetySafety | CUY | Nov 2022 | $12.0M | $12.0M |
| Rank 3of 3 | LOR-US 20-19.83Pavement | LOR | Nov 2022 | $1.92M | $1.70M |
| Rank 2of 2 | PIC-/FAI/FRA-SR 674-00.00/00.00/00.00Pavement | PIC | Nov 2022 | $4.64M | $4.34M |
| Rank 2of 2 | LIC-US 62-00.00Pavement | LIC | Nov 2022 | $3.26M | $3.07M |
| Rank 3of 3 | DEL-SR 37-23.03Pavement | DEL | Nov 2022 | $2.95M | $2.62M |
| Wonof 4 | SAN-US 20-03.75Pavement | SAN | Nov 2022 | $4.88M | $4.88M |
| Wonof 4 | SAN-SR 19-10.84 ResurfacingPavement | SAN | Nov 2022 | $3.22M | $3.22M |
| Wonof 3 | LOR-US 6-15.87Pavement | LOR | Nov 2022 | $2.62M | $2.62M |
| Rank 2of 2 | FRA-IR 270-54.95/00.00Pavement | FRA | Nov 2022 | $2.19M | $1.49M |
| Rank 5of 6 | POR-SR 5/VAR-05.09/VARPavement | POR | Nov 2022 | $6.34M | $4.92M |
| Wonof 7 | CUY-IR 77-00.42 Interchange (PART 1 AND PART 2)Pavement | CUY | Oct 2022 | $31.6M | $31.6M |
| Rank 2of 2 | PIC-US 23-17.37Pavement | PIC | Oct 2022 | $5.98M | $4.64M |
| Rank 3of 3 | HUR-SR 601-00.00Pavement | HUR | Sep 2022 | $2.79M | $2.63M |
| Rank 3of 5 | SEN-SR 224-19.85 ResurfacingPavement | SEN | Sep 2022 | $3.74M | $3.26M |
| Rank 3of 4 | ATB-IR 90-19.56Pavement | ATB | Sep 2022 | $3.31M | $3.08M |
| Wonof 2 | LIC-/FAI-IR 70-00.00/00.00Pavement | LIC | Sep 2022 | $10.3M | $10.3M |
| Rank 6of 6 | POR-SR 43/43D-11.87/00.00Pavement | POR | Aug 2022 | $2.24M | $1.97M |
| Wonof 2 | CRA-SR 96-00.00Pavement | CRA | Aug 2022 | $3.30M | $3.30M |
| Wonof 4 | HUR-SR 61-06.70Pavement | HUR | Aug 2022 | $3.65M | $3.65M |
| Wonof 3 | LUC-IR 475/US 23-10.02/11.17 NsewllSafety | LUC | Aug 2022 | $6.50M | $6.50M |
| Rank 4of 6 | SUM-SR 176/SR 303-00.23/00.00Pavement | SUM | Aug 2022 | $2.83M | $2.38M |
| Rank 4of 4 | WAS-SR 7-09.45/09.60/09.78Bridge | WAS | Aug 2022 | $2.62M | $1.82M |
| Rank 2of 2 | FRA-IR 270-37.00Pavement | FRA | Aug 2022 | $13.9M | $10.3M |
| Rank 3of 5 | SUM-SR 241/SR 764-07.78/VARPavement | SUM | Aug 2022 | $4.36M | $3.66M |
| Wonof 3 | SEN-SR 231-00.00 ResurfacingPavement | SEN | Jul 2022 | $3.00M | $3.00M |
| Rank 3of 4 | POR-/SUM-IR 76-01.57/VARPavement | POR | Jul 2022 | $9.37M | $8.26M |
| Rank 2of 3 | HOL-SR 514-04.51Pavement | HOL | Jul 2022 | $327k | $262k |
| Wonof 2 | MAR-SR-SR 4-08.37Pavement | MAR | Jul 2022 | $2.61M | $2.61M |
| Rank 2of 3 | DEL-US 23-Bridge RepairBridge | DEL | Jul 2022 | $616k | $401k |
| Wonof 2 | RIC-IR 71-10.76 RMPavement | RIC | Jul 2022 | $725k | $725k |
| Wonof 4 | ATB-US 20/SR 84-11.02/14.13Pavement | ATB | Jul 2022 | $1.26M | $1.26M |
| Wonof 2 | MED-SR 162/SR 301-00.00/06.91Pavement | MED | Jul 2022 | $2.05M | $2.05M |
| Wonof 2 | RIC-SR 39-18.95Pavement | RIC | Jul 2022 | $2.84M | $2.84M |
| Wonof 3 | LOR-SR 83-15.31Pavement | LOR | Jun 2022 | $1.38M | $1.38M |
| Rank 3of 3 | OTT-SR 53-11.79Pavement | OTT | Jun 2022 | $2.46M | $2.00M |
| Rank 5of 7 | SUM-Gilchrist Rd Ph1 (Mogadore)Pavement | SUM | Jun 2022 | $821k | $699k |
| Wonof 2 | MAR-US 23-07.78Pavement | MAR | Jun 2022 | $1.32M | $1.32M |
| Rank 2of 2 | FRA-US 33-22.93Pavement | FRA | May 2022 | $3.37M | $2.95M |
| Rank 2of 3 | GUE-SR 209-08.56Bridge | GUE | May 2022 | $13.4M | $13.4M |
| Wonof 3 | LUC-IR 475-01.85 @20A Interchnge (PART 1, PART 2, PART 3)Pavement | LUC | May 2022 | $102.0M | $102.0M |
| Rank 3of 6 | SUM-CR 17-23.27 Brecksville RdPavement | SUM | May 2022 | $1.12M | $1.08M |
| Wonof 3 | LOR-US 6-00.00Pavement | LOR | May 2022 | $2.36M | $2.36M |
| Wonof 2 | FAY-/MAD-SP FY22 GenPavement | FAY | May 2022 | $836k | $836k |
| Rank 2of 3 | ASD-/MED-IR 71/IR 76 Truck ParkingPavement | ASD | May 2022 | $2.15M | $2.01M |
| Rank 4of 5 | FRA-IR 70-22.61 (FEF 1A)Signals | FRA | Apr 2022 | $80.5M | $76.7M |
| Rank 3of 3 | CUY-US 422-13.87Pavement | CUY | Apr 2022 | $5.96M | $4.44M |
| Wonof 2 | MAR-SR 47/VAR-08.34/VARPavement | MAR | Apr 2022 | $870k | $870k |
| Wonof 1 | FRA-IR 270/VAR-SP FY22PPavement | FRA | Apr 2022 | $2.06M | $2.06M |
| Wonof 3 | SAN-US 6/US 20I-14.87/0.00 Grp B (PART 1 AND PART 2)Pavement | SAN | Apr 2022 | $5.04M | $5.04M |
| Rank 3of 5 | LOR-US 6-12.36Pavement | LOR | Apr 2022 | $1.36M | $1.22M |
| Rank 2of 2 | FRA-IR 670-00.87Pavement | FRA | Apr 2022 | $8.47M | $8.21M |
| Rank 2of 6 | POR-CR 256-00.00 E Mennonite RdPavement | POR | Apr 2022 | $518k | $512k |
| Rank 4of 7 | POR-CR 197-01.03 (Frost Rd)Pavement | POR | Mar 2022 | $779k | $690k |
| Rank 6of 6 | FRA-EXPO FY22Pavement | FRA | Mar 2022 | $243k | $153k |
| Rank 4of 4 | CUY-US 6/US 20-24.44/27.78Pavement | CUY | Mar 2022 | $6.63M | $5.20M |
| Rank 3of 4 | D12-PPM FY2022Pavement | D12 | Mar 2022 | $2.29M | $1.97M |
| Rank 3of 4 | MAD-SR 56/SR 38-06.20/13.15Pavement | MAD | Mar 2022 | $1.01M | $885k |
| Rank 2of 6 | CUY-IR 71-05.71 BarrierSafety | CUY | Mar 2022 | $8.94M | $8.53M |
| Rank 2of 3 | CRA-SR 602-04.25Pavement | CRA | Mar 2022 | $8.64M | $8.22M |
| Wonof 5 | LOR-CR 78-00.00 (Moore Rd)Pavement | LOR | Mar 2022 | $477k | $477k |
| Wonof 3 | HOL-SR 3-00.00Pavement | HOL | Mar 2022 | $1.23M | $1.23M |
| Rank 2of 3 | SUM-IR 77-15.87Pavement | SUM | Mar 2022 | $6.14M | $5.13M |
| Rank 2of 3 | HAM-US 50-28.10/28.25Bridge | HAM | Mar 2022 | $7.63M | $6.76M |
| Wonof 4 | HAM-US 52-37.99Earthwork | HAM | Mar 2022 | $1.67M | $1.67M |
| Rank 5of 5 | GEA-SR 87-15.93Pavement | GEA | Mar 2022 | $1.87M | $1.65M |
| Rank 2of 3 | OTT-SR 2-16.37 ResurfPavement | OTT | Feb 2022 | $5.33M | $5.30M |
| Rank 3of 3 | WOO-SR 25-11.94 ResurfPavement | WOO | Jan 2022 | $2.26M | $2.02M |
| Rank 4of 6 | CUY-US 6-03.85Pavement | CUY | Jan 2022 | $1.49M | $1.32M |
| Rank 5of 5 | LAK-US 6-02.60Pavement | LAK | Jan 2022 | $1.91M | $1.52M |
| Rank 4of 6 | WOO-SR 25-00.75 ReconstructionPavement | WOO | Jan 2022 | $24.5M | $21.7M |
| Rank 2of 4 | LOR-SR 83-04.17Pavement | LOR | Jan 2022 | $2.59M | $2.53M |
| Wonof 4 | D03-RM FY2022Pavement | D03 | Jan 2022 | $750k | $750k |
| Rank 2of 3 | MAR-SR 47-02.46Pavement | MAR | Jan 2022 | $189k | $147k |
| Rank 2of 2 | CRA-US 30-15.80Pavement | CRA | Jan 2022 | $6.65M | $6.65M |
| Rank 2of 2 | PIC-US 23-00.00 (PART 1 AND PART 2)Pavement | PIC | Jan 2022 | $6.44M | $6.31M |
| Wonof 2 | FRA-IR 70/IR 71 Part1 (4R); Part2 (6R)Pavement | FRA | Dec 2021 | $278.8M | $278.8M |
| Rank 2of 2 | UNI-US 33-12.59Pavement | UNI | Dec 2021 | $9.38M | $9.13M |
Source: public.bid_results, ODOT bid tabs. Bidder strings are normalized to upper-case but not yet entity-resolved, so related firms (e.g. "Shelly Company" vs "Shelly & Sands") are shown separately.