BEL-Court Campus Improvements
BEL County · est $3.9M
Bid dateThursday, April 23—
Awarded toGRAE-CON CONSTRUCTION INC$4.40M
BEL County · est $3.9M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN, S 02 | 540 FT | $617.78 | $334k | 8% |
| 625E99000 SPECIAL - LIGHTING, ELECTRICAL IMPROVEMENTS Section 5 - LIGHTING - Totals Awd $273,766.39 | 1 LS | $252,900 | $253k | 6% |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN, S 01 | 430 FT | $477.4 | $205k | 5% |
| 690E98400 SPECIAL - ADA WHEELCHAIR LIFT AND BUILDING IMPROVE | 1 LS | $204,743 | $205k | 5% |
| 608E13001 6" CONCRETE WALK, AS PER PLAN, 7 INCH | 6,475 SF | $29.96 | $194k | 4% |
| 451E10011 6" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, AS P | 575 SY | $235.67 | $136k | 3% |
| 624E10000 MOBILIZATION Section 19 - INCIDENTALS - Totals Awd $274,723.58 | 1 LS | $134,644 | $135k | 3% |
| 690E98400 SPECIAL - ELECTRICAL IMPROVEMENTS Section 6 - ELECTRICAL - Totals Awd $128,337.37 | 1 LS | $128,337 | $128k | 3% |
| 608E13001 6" CONCRETE WALK, AS PER PLAN, BRICK PAVEMENT | 3,500 SF | $36.13 | $126k | 3% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN,TEMPORARY ACCESS | 1 LS | $107,744 | $108k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 183 more items below.
| Item | Quantity | R1Grae-con Construction INC | % of bid |
|---|---|---|---|
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN, S 02 | 540 FT | $618 | 13% |
| 625E99000 SPECIAL - LIGHTING, ELECTRICAL IMPROVEMENTS Section 5 - LIGHTING - Totals Awd $273,766.39 | 1 LS | $252,900 | 10% |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN, S 01 | 430 FT | $477 | 8% |
| 690E98400 SPECIAL - ADA WHEELCHAIR LIFT AND BUILDING IMPROVE | 1 LS | $204,743 | 8% |
| 608E13001 6" CONCRETE WALK, AS PER PLAN, 7 INCH | 6,475 SF | $29.96 | 8% |
| 451E10011 6" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, AS P | 575 SY | $236 | 5% |
| 624E10000 MOBILIZATION Section 19 - INCIDENTALS - Totals Awd $274,723.58 | 1 LS | $134,644 | 5% |
| 690E98400 SPECIAL - ELECTRICAL IMPROVEMENTS Section 6 - ELECTRICAL - Totals Awd $128,337.37 | 1 LS | $128,337 | 5% |
| 608E13001 6" CONCRETE WALK, AS PER PLAN, BRICK PAVEMENT | 3,500 SF | $36.13 | 5% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN,TEMPORARY ACCESS | 1 LS | $107,744 | 4% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN, WALLS | 300 CY | $311 | 4% |
| 518E42010 8" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 520 FT | $160 | 3% |
| 609E26001 CURB, TYPE 6, AS PER PLAN, WITH REINFORCEMENT | 490 FT | $164 | 3% |
| 690E98400 SPECIAL - MUSEUM BUILDING IMPROVEMENTS Section 10 - BUILDING DEMOLITION - Totals Awd $329,283.59 | 1 LS | $75,672 | 3% |
| 609E26001 CURB, TYPE 6, AS PER PLAN, WITH REINFORCEMENT | 430 FT | $171 | 3% |
| 609E26001 CURB, TYPE 6, AS PER PLAN, WITH REINFORCEMENT | 275 FT | $215 | 2% |
| 511E46211 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 25 CY | $2,339 | 2% |
| 511E46211 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 15 CY | $3,670 | 2% |
| 203E98500 ROADWAY, MISC.:GRADING CUT PLACED AS FILL | 1 LS | $52,845 | 2% |
| 690E98400 SPECIAL -PLUMBING IMPROVEMENTS Section 4 - WATER WORK - Totals Awd $51,077.02 | 1 LS | $51,077 | 2% |
| Item | Quantity | R1Grae-con Construction INC |
|---|---|---|
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $20,131 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS832 | 1 LS | $22,648 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $1,636 |
| 832E30001 EROSION CONTROL, AS PER PLAN Section 1 - EROSION CONTROL - Totals Awd $94,414.90 | 50,000 EACH | $1.00 |
| 518E51201 PIPE DOWNSPOUT, INCLUDING SPECIALS, AS PER PLAN, C | 30 FT | $105 |
| 518E62200 STRUCTURE DRAINAGE, MISC.: CLEANOUT | 2 EACH | $2,831 |
| 518E62200 STRUCTURE DRAINAGE, MISC.:, 12" DRAIN BASIN (DOMED | 1 EACH | $5,284 |
| 518E62200 STRUCTURE DRAINAGE, MISC.:, 12" DRAIN BASIN (SQUAR | 5 EACH | $5,284 |
| 518E62200 STRUCTURE DRAINAGE, MISC.:, DOWNSPOUT BOOT | 14 EACH | $754 |
| 605E13411 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 420 FT | $86.82 |
| 611E99575 MANHOLE, NO. 3, AS PER PLAN, BRONZE COUNTY SEAL IN | 1 EACH | $26,422 |
| 611E99690 MANHOLE, MISC.:, PIG TAIL & WATER HOSE BIB HOOKUPS | 3 EACH | $3,775 |
| 611E99690 MANHOLE, MISC.:, X-MAS TREE PIT | 1 EACH | $25,416 |
| 611E99830 SPECIAL - TRENCH DRAIN Section 2 - DRAINAGE - Totals Awd $240,387.26 | 22 FT | $300 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 8 CY | $581 |
| 407E10001 TACK COAT, AS PER PLAN | 1 GAL | $1,636 |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 0.5 CY | $2,328 |
| 442E22201 ASPHALT CONCRETE INTERMEDIATE COURSE, 9.5 MM, TYPE | 5 CY | $377 |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 1,450 SF | $27.90 |
| 608E10001 4" CONCRETE WALK, AS PER PLAN, COURTHOUSE STAMPED | 160 SF | $78.20 |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN, S 03 | 45 FT | $250 |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN, S 04 | 105 FT | $234 |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN, S 05 | 110 FT | $142 |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN, S 06 | 85 FT | $248 |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN, S 07 | 65 FT | $279 |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN, S 08 | 6 FT | $953 |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN, S 09 | 40 FT | $233 |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN, S 10 | 25 FT | $353 |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN, S 11 | 20 FT | $784 |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN, S 12 | 40 FT | $186 |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN, S 14 | 20 FT | $456 |
| 608E53021 DETECTABLE WARNING, AS PER PLAN | 125 SF | $239 |
| 609E00501 SANDSTONE CURB, AS PER PLAN, LIMESTONE | 48 FT | $477 |
| 609E26001 CURB, TYPE 6, AS PER PLAN, PLANTER CURB | 260 FT | $129 |
| 609E33201 CURB, TYPE 10-B, AS PER PLAN, WITH REINFORCEMENT | 108 FT | $149 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 1 CY | $1,554 |
| 642E00511 STOP LINE, TYPE 1A, AS PER PLAN | 9 FT | $18.87 |
| 642E00711 TRANSVERSE/DIAGONAL LINE, TYPE 1A, AS PER PLAN | 450 FT | $9.44 |
| 642E01210 PARKING LOT STALL MARKING, TYPE 1A | 500 FT | $5.66 |
| 642E01710 HANDICAP SYMBOL MARKING, TYPE 1A | 11 EACH | $252 |
| 642E50010 PAVEMENT MARKING, MISC.:, "VAN" | 3 EACH | $189 |
| 690E50500 SPECIAL - CONCRETE PARKING BLOCK, WHEEL STOP Section 3 - PAVEMENT - Totals Awd $1,380,684.28 | 13 EACH | $242 |
| 530E00200 SPECIAL - STRUCTURES, CAST IRON LIGHT FIXTURE REST | 1 LS | $20,866 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN Section 7 - OTHER UTILITIES - Totals Awd $9,323.30 | 19 EACH | $491 |
| 630E97700 SIGNING, MISC.:, AS PER PLAN Section 8 - TRAFFIC CONTROL - Totals Awd $25,164.16 | 32 EACH | $786 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,983 |
| 201E11000 CLEARING AND GRUBBING, AS PER PLAN, TREE REMOVAL ( | 1 LS | $5,662 |
| 203E02000 SPECIAL - ENGINEERED FILL, SUBGRADE IMPORT / EXPOR | 26 CY | $182 |
| 203E02000 SPECIAL - ENGINEERED FILL, WALL IMPORT / EXPORT | 26 CY | $238 |
| 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN, LAWN AREAS | 90 CY | $71.72 |
| 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN, PAVEMENT AREA | 180 CY | $71.72 |
| 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN, PLANT BED ARE | 230 CY | $62.91 |
| 517E73501 RAILING, PIPE, AS PER PLAN, TUNNEL, STEEL (BLACK P | 140 FT | $219 |
| 530E00200 SPECIAL - STRUCTURES, EX. MONUMENT RELOCATION A | 1 LS | $23,730 |
| 530E00200 SPECIAL - STRUCTURES, EX. MONUMENT RELOCATION B | 1 LS | $28,335 |
| 530E00200 SPECIAL - STRUCTURES, EX. MONUMENT RELOCATION C | 1 LS | $7,059 |
| 530E00200 SPECIAL - STRUCTURES, FLAGPOLE | 1 LS | $8,456 |
| 530E00200 SPECIAL - STRUCTURES, MONUMENT SIGN(S) | 1 LS | $17,615 |
| 530E00400 SPECIAL - STRUCTURES, PLANTER POTS | 3 EACH | $2,390 |
| 607E98000 FENCE, MISC.:, ORNAMENTAL SAFETY FENCE | 50 FT | $299 |
| 653E10001 TOPSOIL FURNISHED AND PLACED, AS PER PLAN, AMENDED | 230 CY | $120 |
| 653E10001 TOPSOIL FURNISHED AND PLACED, AS PER PLAN, LAWN AR | 90 CY | $122 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 50 SY | $44.04 |
| 660E25001 SODDING STAKED, AS PER PLAN | 240 SY | $26.21 |
| 661E00501 MULCH, AS PER PLAN , 3" DEPTH | 15 CY | $252 |
| 661E14001 PERENNIALS, AS PER PLAN, ANNUALS FOR POTS | 132 EACH | $40.51 |
| 661E14001 PERENNIALS, AS PER PLAN, SEE SUBSUMMARY | 271 EACH | $34.82 |
| 661E20041 DECIDUOUS SHRUB, 2' HEIGHT, AS PER PLAN, SEE SUBSU | 79 EACH | $199 |
| 661E30061 EVERGREEN SHRUB, 2' HEIGHT, AS PER PLAN, SEE SUBSU | 91 EACH | $173 |
| 661E40021 DECIDUOUS TREE, 6' HEIGHT, AS PER PLAN, 12' HEIGHT | 2 EACH | $1,117 |
| 661E40081 DECIDUOUS TREE, 2" CALIPER, AS PER PLAN, 2-1/2" CA | 4 EACH | $1,101 |
| 661E40081 DECIDUOUS TREE, 2" CALIPER, AS PER PLAN, SEE SUBSU | 8 EACH | $1,101 |
| 661E50121 EVERGREEN TREE, 6' HEIGHT, AS PER PLAN, SEE SUBSUM | 1 EACH | $1,541 |
| 661E99920 PLANTING, MISC.:AUGMENT EXISTING LANDSCAPE BEDS | 900 SF | $4.58 |
| 661E99920 PLANTING, MISC.:SEASONAL COLOR - MIXED ANNUALS | 979 SF | $40.29 |
| 666E09001 PRUNING EXISTING TREE, 3 TO 8-INCH DIAMETER, AS PE | 2 EACH | $472 |
| 690E50560 SPECIAL - BICYCLE RACK | 4 EACH | $933 |
| 690E50600 SPECIAL - BOLLARD Section 9 - LANDSCAPING - Totals Awd $420,560.11 | 3 EACH | $3,284 |
| 202E56001 BUILDING DEMOLISHED, AS PER PLAN BRICK WALLS; SALV | 1 LS | $48,869 |
| 613E41360 LOW STRENGTH MORTAR BACKFILL, STEAM TUNNEL IMPROVE | 1 LS | $27,681 |
| 690E71000 SPECIAL - ASBESTOS ABATEMENT , AND LEAD REMOVAL Section 11 - ENVIRONMENTAL / REMEDIATION - Totals Awd $40,532.71 | 1 LS | $12,852 |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN, FOUNDATIONS | 150 CY | $308 |
| 511E46211 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 18 CY | $912 |
| 511E46211 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 12 CY | $1,480 |
| 511E46211 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 15 CY | $1,627 |
| 511E46211 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 10 CY | $4,950 |
| 511E46211 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 10 CY | $1,451 |
| 511E46211 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F Section 12 - RETAINING WALLS - Totals Awd $381,649.83 | 10 CY | $610 |
| 202E11005 STRUCTURE REMOVED, AS PER PLAN, TRENCH DRAIN | 2 EACH | $903 |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN BRICK PAVER | 540 SY | $13.84 |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN, ASPHALT CONCRETE | 746 SY | $22.65 |
| 202E30001 WALK REMOVED, AS PER PLAN, 2" CONCRETE OVERLAY REM | 1,240 SF | $6.92 |
| 202E30001 WALK REMOVED, AS PER PLAN, CONCRETE (HEAVY DUTY) | 3,100 SF | $7.55 |
| 202E30001 WALK REMOVED, AS PER PLAN, CONCRETE (REGULAR DUTY) | 6,675 SF | $5.03 |
| 202E32001 CURB REMOVED, AS PER PLAN | 534 FT | $22.65 |
| 202E75611 VALVE BOX REMOVED, AS PER PLAN | 2 EACH | $453 |
| 202E98000 REMOVAL MISC.: HISTORICAL MARKER SIGN | 1 LS | $1,573 |
| 202E98000 REMOVAL MISC.: TABLE AND CHAIRS | 1 LS | $1,384 |
| 202E98000 REMOVAL MISC.:, BENCH | 1 LS | $1,384 |
| 202E98000 REMOVAL MISC.:, BOLLARD | 1 LS | $1,761 |
| 202E98000 REMOVAL MISC.:, BUILDING-MOUNTED HANDRAIL | 1 LS | $1,068 |
| 202E98000 REMOVAL MISC.:, CONCRETE PLANTER POTS | 1 LS | $1,887 |
| 202E98000 REMOVAL MISC.:, DRAIN GRATE | 1 LS | $906 |
| 202E98000 REMOVAL MISC.:, DUMPSTERS RELOCATED | 1 LS | $818 |
| 202E98000 REMOVAL MISC.:, FLAGPOLE | 1 LS | $4,907 |
| 202E98000 REMOVAL MISC.:, FLOOD LIGHT | 1 LS | $6,107 |
| 202E98000 REMOVAL MISC.:, MAILBOX | 1 LS | $566 |
| 202E98000 REMOVAL MISC.:, PARKING TICKET BOX | 1 LS | $661 |
| 202E98000 REMOVAL MISC.:, TRASH RECEPTACLE | 1 LS | $2,045 |
| 202E98000 REMOVAL MISC.:, WOOD FENCE AND GATE | 1 LS | $1,384 |
| 202E98000 REMOVAL MISC.:, X-MAS TREE PIT MANHOLE | 1 LS | $881 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 5 EACH | $377 |
| 630E85200 REMOVAL OF GROUND MOUNTED SIGN AND DELIVERY, BUILD | 4 EACH | $679 |
| 630E85201 REMOVAL OF GROUND MOUNTED SIGN AND DELIVERY, AS PE | 6 EACH | $453 |
| 645E30011 REMOVAL OF PAVEMENT MARKINGS, AS PER PLAN Section 13 - ITEMS OF WORK - Totals Awd $144,054.06 | 5 EACH | $932 |
| 690E98400 SPECIAL - COOLING TOWER ENCLOSURE Section 14 - ITEMS OF WORK ADDITIVE ALTERNATE 1 - Totals Awd $49,230.72 | 1 LS | $49,231 |
| 690E98400 SPECIAL - OUTDOOR RATED FULL SCALE AUDIO SYSTEM Section 15 - ITEMS OF WORK ADDITIVE ALTERNATE 2 - Totals Awd $25,800.00 | 1 LS | $25,800 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,420 |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN, ASPHALT CONCRETE | 156 SY | $34.70 |
| 202E30001 WALK REMOVED, AS PER PLAN, CONCRETE (REGULAR DUTY) | 33 SF | $12.73 |
| 202E32001 CURB REMOVED, AS PER PLAN | 230 FT | $19.67 |
| 203E98500 ROADWAY, MISC.:GRADING CUT PLACED AS FILL | 1 LS | $5,726 |
| 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN, LAWN AREAS | 20 CY | $50.90 |
| 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN, PAVEMENT AREA | 20 CY | $49.74 |
| 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN, PLANT BED ARE | 10 CY | $38.18 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 10 CY | $292 |
| 407E10001 TACK COAT, AS PER PLAN | 2 GAL | $1,307 |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 1 CY | $1,851 |
| 442E22201 ASPHALT CONCRETE INTERMEDIATE COURSE, 9.5 MM, TYPE | 2 CY | $1,677 |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 550 SF | $30.06 |
| 608E40001 CONCRETE STEPS, TYPE A, AS PER PLAN, S 13 | 20 FT | $687 |
| 608E53021 DETECTABLE WARNING, AS PER PLAN | 20 SF | $145 |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN,TEMPORARY ACCESS | 1 LS | $19,875 |
| 625E99000 SPECIAL - LIGHTING, ELECTRICAL IMPROVEMENTS | 1 LS | $5,206 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 1 EACH | $357 |
| 630E85201 REMOVAL OF GROUND MOUNTED SIGN AND DELIVERY, AS PE | 2 EACH | $405 |
| 630E97700 SIGNING, MISC.:, AS PER PLAN | 18 EACH | $1,221 |
| 642E00511 STOP LINE, TYPE 1A, AS PER PLAN | 34 FT | $17.35 |
| 642E00650 CROSSWALK LINE, 24", TYPE 1A | 25 FT | $18.51 |
| 642E00711 TRANSVERSE/DIAGONAL LINE, TYPE 1A, AS PER PLAN | 175 FT | $8.68 |
| 642E50010 PAVEMENT MARKING, MISC.:, "RESERVED" | 12 EACH | $174 |
| 653E10001 TOPSOIL FURNISHED AND PLACED, AS PER PLAN, AMENDED | 10 CY | $267 |
| 653E10001 TOPSOIL FURNISHED AND PLACED, AS PER PLAN, LAWN AR | 20 CY | $260 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 175 SY | $6.61 |
| 661E00501 MULCH, AS PER PLAN , 3" DEPTH | 30 CY | $6.75 |
| 661E40081 DECIDUOUS TREE, 2" CALIPER, AS PER PLAN, 2-1/2" CA | 6 EACH | $1,104 |
| 690E98400 SPECIAL - ELECTRICAL IMPROVEMENTS | 1 LS | $1,171 |
| 832E30001 EROSION CONTROL, AS PER PLAN Section 16 - ITEMS OF WORK ADDITIVE ALTERNATE 3 - Totals Awd $219,792.16 | 7,500 EACH | $1.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,302 |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN, ASPHALT CONCRETE | 156 SY | $34.37 |
| 202E30001 WALK REMOVED, AS PER PLAN, CONCRETE (REGULAR DUTY) | 292 SF | $20.62 |
| 202E32001 CURB REMOVED, AS PER PLAN | 236 FT | $19.48 |
| 202E98000 REMOVAL MISC.:, BOLLARD | 1 LS | $940 |
| 202E98000 REMOVAL MISC.:, SURFACE MOUNTED HANDRAIL | 1 LS | $722 |
| 203E98500 ROADWAY, MISC.:GRADING CUT PLACED AS FILL | 1 LS | $5,156 |
| 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN, LAWN AREAS | 40 CY | $49.84 |
| 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN, PAVEMENT AREA | 40 CY | $49.27 |
| 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN, PLANT BED ARE | 75 CY | $37.81 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 16 CY | $288 |
| 407E10001 TACK COAT, AS PER PLAN | 2 GAL | $1,295 |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 1 CY | $1,833 |
| 442E22201 ASPHALT CONCRETE INTERMEDIATE COURSE, 9.5 MM, TYPE | 2.5 CY | $1,862 |
| 451E10011 6" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, AS P | 290 SY | $110 |
| 517E73501 RAILING, PIPE, AS PER PLAN, STEPS, STEEL (BLACK PO | 36 FT | $229 |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 1,200 SF | $21.80 |
| 608E53021 DETECTABLE WARNING, AS PER PLAN | 85 SF | $74.14 |
| 609E33201 CURB, TYPE 10-B, AS PER PLAN, WITH REINFORCEMENT | 70 FT | $232 |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN,TEMPORARY ACCESS | 1 LS | $19,453 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 3 EACH | $355 |
| 630E85201 REMOVAL OF GROUND MOUNTED SIGN AND DELIVERY, AS PE | 2 EACH | $412 |
| 642E00511 STOP LINE, TYPE 1A, AS PER PLAN | 35 FT | $17.19 |
| 642E00650 CROSSWALK LINE, 24", TYPE 1A | 155 FT | $18.33 |
| 653E10001 TOPSOIL FURNISHED AND PLACED, AS PER PLAN, AMENDED | 75 CY | $122 |
| 653E10001 TOPSOIL FURNISHED AND PLACED, AS PER PLAN, LAWN AR | 40 CY | $158 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 325 SY | $7.05 |
| 661E00501 MULCH, AS PER PLAN , 3" DEPTH | 70 CY | $81.84 |
| 661E14001 PERENNIALS, AS PER PLAN , SEE SUBSUMMARY | 30 EACH | $45.83 |
| 661E20041 DECIDUOUS SHRUB, 2' HEIGHT, AS PER PLAN , SEE SUBS | 15 EACH | $141 |
| 661E30061 EVERGREEN SHRUB, 2' HEIGHT, AS PER PLAN, SEE SUBSU | 56 EACH | $208 |
| 661E40081 DECIDUOUS TREE, 2" CALIPER, AS PER PLAN, 2-1/2" CA | 12 EACH | $597 |
| 832E30001 EROSION CONTROL, AS PER PLAN Section 17 - ITEMS OF WORK ADDITIVE ALTERNATE 4 - Totals Awd $306,953.32 | 17,500 EACH | $1.00 |
| 511E53010 CLASS QC1 CONCRETE, MISC.:, STATUE FOUNDATION Section 18 - ITEMS OF WORK ADDITIVE ALTERNATE 5 - Totals Awd $1,978.01 | 1.5 CY | $1,319 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $32,336 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →