Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
791 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 2 | US 90A CONSTRUCT ROUNDABOUT 2508 | LAVACA | 2025-08-07 | $6,702,218.10 | $6,702,218.10 |
| Rank 3of 4 | SH130 & SH45 Frontage Road Mill & Inlay | TRAVIS | 2025-08-07 | $12,507,940.74 | $12,111,218.45 |
| Rank 2of 7 | US 87 - Barons Creek to Old Mason Rd | GILLESPIE | 2025-07-02 | $9,159,903.39 | $9,157,488.33 |
| Rank 2of 5 | FM 466: 0216-03-037: OV | GUADALUPE | 2025-07-02 | $717,488.13 | $643,755.45 |
| Rank 7of 7 | SL 353: 0017-01-025; OV | BEXAR | 2025-07-01 | $4,986,398.44 | $3,232,998.95 |
| Rank 5of 6 | SL 13: 0521-01-057: OV | BEXAR | 2025-07-01 | $7,849,618.09 | $5,240,622.49 |
| Rank 2of 7 | FM 3084 REHABILITATE ROADWAY HSIP 2605 | CALHOUN | 2025-07-01 | $4,520,306.78 | $4,398,168.09 |
| Low bidof 5 | RM 3404 - FY 25 SSWP | LLANO | 2025-07-01 | $1,179,799.95 | $1,179,799.95 |
| Rank 4of 10 | SH 159 Bridge Replacement 2507 | FAYETTE | 2025-07-01 | $4,580,640.42 | $4,282,480.36 |
| Rank 3of 9 | US 90: 0024-07-059; WF | BEXAR | 2025-06-05 | $135,796,719.03 | $123,992,265.80 |
| Low bidof 5 | REHABILITATE ROADWAY | GONZALES | 2025-06-05 | $10,569,339.08 | $10,569,339.08 |
| Rank 5of 6 | IH 37 San Pat frontage rehab/widen2 | SAN PATRICIO | 2025-06-05 | $10,524,775.16 | $8,068,784.52 |
| Low bidof 8 | FM 3349 - CR 404 to FM 1660 | WILLIAMSON | 2025-06-05 | $4,662,190.69 | $4,662,190.69 |
| Low bidof 6 | 2485-02, SL517 Widen RDWY Illumination | DIMMIT | 2025-06-05 | $1,400,124.62 | $1,400,124.62 |
| Rank 2of 7 | FM 812 from Watts Ln to Artesian Dr | BASTROP | 2025-06-04 | $7,755,025.58 | $7,601,604.21 |
| Low bidof 3 | Asphaltic Concrete Pavement Repairs | LAVACA | 2025-05-29 | $791,562.44 | $791,562.44 |
| Rank 4of 5 | US 59 LiveOak lagarto-FM 1359 OV | LIVE OAK | 2025-05-02 | $8,612,039.82 | $8,329,532.65 |
| Rank 2of 4 | SH 316 REHABILITATE ROADWAY HSIP 2505 | CALHOUN | 2025-05-02 | $3,227,732.83 | $3,141,247.90 |
| Rank 6of 6 | IH 410: 0521-05-151; OV | BEXAR | 2025-05-01 | $12,502,486.35 | $9,693,874.28 |
| Rank 3of 6 | SAT_SH0016_1of2: 0613-01-070: SFT | BEXAR | 2025-04-04 | $9,557,110.33 | $8,862,445.15 |
| Rank 6of 7 | REHABILITATE ROADWAY 2701 | AUSTIN | 2025-04-04 | $5,203,425.48 | $4,364,003.24 |
| Rank 2of 7 | US 90 WIDEN STRUCTURE 2512 | GONZALES | 2025-04-04 | $5,691,554.91 | $5,381,995.91 |
| Low bidof 6 | US 90-S. of Mesquite to 0.20 W OF PLUM C | CALDWELL | 2025-04-04 | $4,315,552.20 | $4,315,552.20 |
| Rank 3of 4 | US 90: 0024-07-074: IOI | BEXAR | 2025-04-04 | $5,291,104.51 | $4,223,266.29 |
| Rank 5of 7 | SH 27: 0142-04-052; CSD | KERR | 2025-04-03 | $2,304,308.24 | $1,403,742.29 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.