OTT-SR 357-02.30 Repair
OTT County · est $0.3M
Bid dateThursday, March 12—
Awarded toSHORELINE CONTRACTORS$322,786.61
OTT County · est $0.3M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 690E98800 SPECIAL - 2 TO 4 TON ARMOR STONE | 780 TON | $143.5 | $112k | 35% |
| 253E90100 PAVEMENT REPAIR, MISC.: FULL DEPTH REPLACEMENT Section 4 - PAVEMENT - Totals Awd $55,950.40 2 $16,830.00 3 $66,000.00 4 $8,250.00 5 $32,450.00 6 $41,105.35 | 55 SY | $1,017 | $56k | 17% |
| 203E10000 EXCAVATION Section 1 - ROADWAY - Totals Awd $43,066.87 2 $24,875.00 3 $91,200.00 4 $24,486.00 5 $134,426.35 6 $112,629.82 | 700 CY | $55 | $39k | 12% |
| 624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $49,264.00 2 $134,500.00 3 $58,000.00 4 $97,600.00 5 $148,075.00 6 $226,396.97 | 1 LS | $32,500 | $33k | 10% |
| 601E30000 DUMPED ROCK FILL, MISC.:TYPE C | 160 TON | $143.5 | $23k | 7% |
| 690E98800 SPECIAL - 4 TO 6 TON TOE STONE | 130 TON | $143.5 | $19k | 6% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $171,841.70 2 $151,000.00 3 $145,161.20 4 $417,195.00 5 $408,541.00 6 $387,025.95 | 12,000 EACH | $1 | $12k | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,920 | $8k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,220 | $5k | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,624 | $4k | 1% |
ODOT bid tab line items with each bidder’s unit price. Top 16items by winning bid’s extended amount.
| Item | Quantity | R1Shoreline Contractors | R2Great Lakes Demolition Company | R3Mason Dixon Energy Services LLC | R4Geo Gradel CO | R5Ebony Construction CO | R6Madex Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|
| 690E98800 SPECIAL - 2 TO 4 TON ARMOR STONE | 780 TON | $144 | $120 | $102 | $325 | $294 | $287 | 35% |
| 253E90100 PAVEMENT REPAIR, MISC.: FULL DEPTH REPLACEMENT Section 4 - PAVEMENT - Totals Awd $55,950.40 2 $16,830.00 3 $66,000.00 4 $8,250.00 5 $32,450.00 6 $41,105.35 | 55 SY | $1,017 | $306 | $1,200 | $150 | $590 | $747 | 17% |
| 203E10000 EXCAVATION Section 1 - ROADWAY - Totals Awd $43,066.87 2 $24,875.00 3 $91,200.00 4 $24,486.00 5 $134,426.35 6 $112,629.82 | 700 CY | $55.00 | $30.00 | $120 | $20.00 | $188 | $146 | 12% |
| 624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $49,264.00 2 $134,500.00 3 $58,000.00 4 $97,600.00 5 $148,075.00 6 $226,396.97 | 1 LS | $32,500 | $120,000 | $30,000 | $71,300 | $101,900 | $156,050 | 10% |
| 601E30000 DUMPED ROCK FILL, MISC.:TYPE C | 160 TON | $144 | $80.00 | $115 | $295 | $360 | $273 | 7% |
| 690E98800 SPECIAL - 4 TO 6 TON TOE STONE | 130 TON | $144 | $120 | $150 | $398 | $613 | $438 | 6% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $171,841.70 2 $151,000.00 3 $145,161.20 4 $417,195.00 5 $408,541.00 6 $387,025.95 | 12,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,920 | $4,500 | $4,000 | $8,300 | $14,128 | $27,206 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,220 | $3,500 | $12,000 | $8,000 | $16,324 | $16,983 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,624 | $6,500 | $12,000 | $10,000 | $15,723 | $26,158 | 1% |
| 202E98100 REMOVAL MISC.:3' X 3' X 6' CONCRETE BLOCK RELOCATI | 43 EACH | $67.53 | $200 | $100 | $465 | $357 | $572 | 1% |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 49 FT | $54.36 | $25.00 | $55.00 | $108 | $34.75 | $93.51 | 1% |
| 611E04600 12" CONDUIT, TYPE C, 748.06 Section 3 - DRAINAGE - Totals Awd $2,663.64 2 $8,036.00 3 $5,390.00 4 $30,870.00 5 $5,635.00 6 $22,479.24 | 49 FT | $54.36 | $164 | $110 | $630 | $115 | $459 | 1% |
| 602E98300 MASONRY, MISC.:3' X 3' X 6' CONCRETE BLOCK | 9 EACH | $281 | $400 | $1,200 | $3,000 | $1,300 | $1,978 | 1% |
| 202E23000 PAVEMENT REMOVED | 53 SY | $35.91 | $50.00 | $85.00 | $98.00 | $21.20 | $106 | 1% |
| 204E50000 GEOTEXTILE FABRIC | 480 SY | $1.80 | $10.00 | $2.00 | $12.00 | $6.00 | $16.78 | 0% |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →