STA-MCRO FY2018(A)
STA County · est $1.7M
Bid dateThursday, January 11—
STA County · est $1.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 3.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 20 more items below.
| Item | Quantity | R1American Pavements INC | R2Strawser Construction INC | R3Microsurfacing Contractors LLC | % of bid |
|---|---|---|---|---|---|
| 421E10010 MICROSURFACING, SURFACE COURSE | 316,318 SY | $2.25 | $2.76 | $3.05 | 44% |
| 421E10020 MICROSURFACING, LEVELING COURSE | 146,494 SY | $1.70 | $2.18 | $2.50 | 16% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $90,000 | $203,856 | $397,950 | 6% |
| 644E30030 REMOVAL OF PAVEMENT MARKING | 36.82 MILE | $2,365 | $2,365 | $2,365 | 5% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 105 EACH | $700 | $450 |
| Item | Quantity | R1American Pavements INC | R2Strawser Construction INC | R3Microsurfacing Contractors LLC |
|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 10 EACH | $150 | $450 | $407 |
| 644E30010 REMOVAL OF PAVEMENT MARKING | 134 SF | $3.90 | $3.90 | $3.90 |
| 646E10300 CHANNELIZING LINE, 8" | 4,217 FT | $1.30 | $1.30 | $1.30 |
| 646E10500 CROSSWALK LINE | 1,932 FT | $5.00 | $5.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $857 |
| 5% |
| 624E10000 MOBILIZATION | 1 LS | $60,000 | $99,893 | $250,250 | 4% |
| 646E10200 CENTER LINE | 16.32 MILE | $3,150 | $3,150 | $3,150 | 3% |
| 621E00100 RPM | 2,180 EACH | $20.39 | $21.00 | $20.39 | 3% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 500 SY | $80.00 | $130 | $126 | 2% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 54 EACH | $600 | $550 | $864 | 2% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 40.61 MILE | $636 | $850 | $650 | 2% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,681 EACH | $14.00 | $24.00 | $15.00 | 1% |
| 646E20300 LANE ARROW | 154 EACH | $132 | $132 | $132 | 1% |
| 646E10110 LANE LINE, 6" | 14.68 MILE | $1,100 | $1,100 | $1,100 | 1% |
| 103E06000 PREMIUM FOR CONTRACT PERFORMANCE BOND, PAYMENT BON | 1 LS | $15,000 | $9,500 | $25,000 | 1% |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 161 EACH | $90.00 | $90.00 | $90.00 | 1% |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 10,615 FT | $1.35 | $1.35 | $1.35 | 1% |
| 646E10010 EDGE LINE, 6" | 5.82 MILE | $2,375 | $2,375 | $2,375 | 1% |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 35.82 MILE | $329 | $475 | $330 | 1% |
| 646E10400 STOP LINE | 1,014 FT | $10.65 | $10.65 | $10.65 | 1% |
| $5.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 422 FT | $7.95 | $7.95 | $7.95 |
| 646E10800 ISLAND MARKING | 134 SF | $5.50 | $5.50 | $5.50 |
| 646E20000 RAILROAD SYMBOL MARKING | 2 EACH | $665 | $665 | $665 |
| 646E20110 SCHOOL SYMBOL MARKING, 96" | 5 EACH | $715 | $715 | $715 |
| 646E20200 PARKING LOT STALL MARKING | 112 FT | $2.00 | $2.00 | $2.00 |
| 646E20350 LANE REDUCTION ARROW | 14 EACH | $290 | $290 | $290 |
| 646E20500 DOTTED LINE | 4,300 FT | $1.10 | $1.10 | $1.10 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $65.00 | $70.00 | $125 |
| 614E12460 WORK ZONE MARKING SIGN | 40 EACH | $55.00 | $55.00 | $55.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $150 | $150 | $250 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 14.66 MILE | $495 | $500 | $495 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 10,184 FT | $0.40 | $0.51 | $0.40 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 2,625 FT | $2.60 | $3.00 | $2.58 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $3,500 | $7,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $2,793 | $7,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 421E10010 MICROSURFACING, SURFACE COURSE | 316,318 SY | $2.25 | $712k | 42% |
| 421E10020 MICROSURFACING, LEVELING COURSE | 146,494 SY | $1.7 | $249k | 15% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $90,000 | $90k | 5% |
| 644E30030 REMOVAL OF PAVEMENT MARKING | 36.82 MILE | $2,365 | $87k | 5% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 105 EACH | $700 | $74k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $60,000 | $60k | 4% |
| 646E10200 CENTER LINE | 16.32 MILE | $3,150 | $51k | 3% |
| 621E00100 RPM | 2,180 EACH | $20.39 | $44k | 3% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 500 SY | $80 | $40k | 2% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 54 EACH | $600 | $32k | 2% |