CLE-MCRO-FY2018
CLE County · est $3.7M
Bid dateThursday, February 15—
CLE County · est $3.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 3%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 28 more items below.
| Item | Quantity | R1American Pavements INC | R2Strawser Construction INC | R3Microsurfacing Contractors LLC | % of bid |
|---|---|---|---|---|---|
| 421E10011 MICROSURFACING, SURFACE COURSE, AS PER PLAN | 750,555 SY | $2.21 | $2.13 | $2.15 | 46% |
| 421E10021 MICROSURFACING, LEVELING COURSE, AS PER PLAN | 332,115 SY | $1.60 | $1.39 | $1.50 | 15% |
| 644E30030 REMOVAL OF PAVEMENT MARKING | 115.5 MILE | $2,550 | $2,050 | $1,531 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $198,500 | $275,894 | $465,000 | 6% |
| 251E01011 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 645 CY | $300 | $311 |
| Item | Quantity | R1American Pavements INC | R2Strawser Construction INC | R3Microsurfacing Contractors LLC |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 830 SF | $10.00 | $5.00 | $5.00 |
| 202E32000 CURB REMOVED | 110 FT | $15.00 | $26.00 | $12.00 |
| 608E10000 4" CONCRETE WALK | 320 SF | $15.00 | $16.00 | $6.50 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 5,400 SY | $2.50 | $2.76 | $4.25 |
| 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE) | 6.12 MILE | $1,025 | $2,142 | $1,025 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $330 |
| 5% |
| 624E10000 MOBILIZATION | 1 LS | $160,000 | $332,144 | $420,000 | 4% |
| 621E00100 RPM | 3,452 EACH | $17.75 | $20.00 | $20.00 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 225 CY | $240 | $250 | $310 | 2% |
| 648E00300 CENTER LINE | 33.65 MILE | $1,560 | $1,450 | $1,255 | 1% |
| 251E01031 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN | 169 CY | $300 | $311 | $330 | 1% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3,452 EACH | $14.50 | $18.00 | $10.41 | 1% |
| 647E18010 CHANNELIZING LINE, 8", TYPE B90 | 8,649 FT | $5.30 | $7.25 | $9.95 | 1% |
| 647E20610 LANE ARROW, TYPE B90 | 169 EACH | $250 | $260 | $415 | 1% |
| 647E18060 STOP LINE, TYPE B90 | 2,243 FT | $16.00 | $16.00 | $22.10 | 1% |
| 648E00104 EDGE LINE, 6" | 35.11 MILE | $800 | $1,300 | $1,130 | 1% |
| 648E00100 EDGE LINE, 4" | 32.62 MILE | $800 | $950 | $930 | 1% |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 14,047 FT | $1.80 | $2.30 | $1.74 | 1% |
| 647E20110 TRANSVERSE/DIAGONAL LINE, TYPE B90 | 1,564 FT | $16.00 | $16.00 | $17.10 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 400 HOUR | $60.00 | $70.00 | $75.00 | 1% |
| 608E52001 CURB RAMP, AS PER PLAN | 1,310 SF | $18.00 | $35.00 | $25.00 | 1% |
| 618E41000 EDGE LINE, RUMBLE STRIPE (ASPHALT CONCRETE) |
| 11.12 MILE |
| $680 |
| $2,150 |
| $680 |
| 642E00090 EDGE LINE, 4" | 0.26 MILE | $8,010 | $2,600 | $8,735 |
| 642E00094 EDGE LINE, 6" | 0.07 MILE | $8,010 | $3,100 | $8,760 |
| 642E00190 LANE LINE, 4" | 0.05 MILE | $5,350 | $2,600 | $8,620 |
| 642E00290 CENTER LINE | 0.03 MILE | $10,680 | $5,300 | $8,880 |
| 644E00900 ISLAND MARKING | 789 SF | $5.00 | $3.00 | $3.90 |
| 644E30010 REMOVAL OF PAVEMENT MARKING | 789 SF | $1.80 | $3.25 | $0.87 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 174 EACH | $68.75 | $70.00 | $100 |
| 647E20010 CROSSWALK LINE, TYPE B90 | 1,591 FT | $7.25 | $8.00 | $11.85 |
| 647E20410 SCHOOL SYMBOL MARKING, 72", TYPE B90 | 5 EACH | $930 | $1,000 | $950 |
| 648E00200 LANE LINE, 4" | 13.71 MILE | $400 | $625 | $610 |
| 614E12460 WORK ZONE MARKING SIGN | 11 EACH | $225 | $100 | $125 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 13.76 MILE | $315 | $525 | $1,230 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 33.68 MILE | $690 | $790 | $1,485 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 19.88 MILE | $475 | $675 | $1,345 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 8,649 FT | $0.35 | $0.50 | $0.65 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 2,243 FT | $1.85 | $2.60 | $3.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 1,081 SY | $14.50 | $15.00 | $17.71 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 437 SY | $14.50 | $15.00 | $17.71 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 825 SY | $14.50 | $15.00 | $17.71 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 813 SY | $14.50 | $15.00 | $17.71 |
| 103E06000 PREMIUM FOR CONTRACT PERFORMANCE BOND, PAYMENT BON | 1 LS | $22,500 | $26,498 | $35,000 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $4,500 | $2,000 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 421E10011 MICROSURFACING, SURFACE COURSE, AS PER PLAN | 750,555 SY | $2.21 | $1.66M | 44% |
| 421E10021 MICROSURFACING, LEVELING COURSE, AS PER PLAN | 332,115 SY | $1.6 | $531k | 14% |
| 644E30030 REMOVAL OF PAVEMENT MARKING | 115.5 MILE | $2,550 | $295k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $198,500 | $199k | 5% |
| 251E01011 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 645 CY | $300 | $194k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $160,000 | $160k | 4% |
| 621E00100 RPM | 3,452 EACH | $17.75 | $61k | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 225 CY | $240 | $54k | 1% |
| 648E00300 CENTER LINE | 33.65 MILE | $1,560 | $52k | 1% |
| 251E01031 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN | 169 CY | $300 | $51k | 1% |